MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 18, 2026

MINE DETAILS

Colowyo Mine

NonProducingSurfaceCoal (Bituminous)
MSHA MINE ID0502962
LOCATIONMoffat, CO
PUBLIC RECORD9,564 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

13

0 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q15
  6. 2026 Q20
  7. 2026 Q37
  8. 2026 Q4 *0

Accident records

7

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q24
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

4,740.00

13 of 13 violations with amounts

  1. 2025 Q1151
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q13,532
  6. 2026 Q2—
  7. 2026 Q31,057
  8. 2026 Q4 *—

On-site inspection hours

322.50

8 inspections · 8 with hours

  1. 2025 Q1105.25
  2. 2025 Q283.00
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q168.00
  6. 2026 Q26.50
  7. 2026 Q352.50
  8. 2026 Q4 *7.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110151.00101105.3
2025-Q200—40183.0
2025-Q300—100—
2025-Q400—000—
2026-Q1503,532.0000268.0
2026-Q200—0016.5
2026-Q3701,057.0010252.5
2026-Q4 *00—0017.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9735336

    77.1110 · $151.00 proposed

  2. inspectionF00F00F

    Regular Safety and Health Inspection · 105.3 on-site hours

  3. accident220250500009

    HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Production Operator was shoveling mud off the track frame of a dozer while standing on the ground when Operator slipped and fell, landing on left shoulder. X-ray was negative and physician has referred employee for an MRI.

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS638,1176 rows · 1 receiving plants
HEAT CONTENT · BTU/LB9,728Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.35 / 8.31Separate averages over measured receipts
DELIVERED COST · USD/TON79.55100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *141,3919,8720.348.0880.55
2026-Q1136,0659,9200.316.5081.21
2026-Q2360,6619,6000.379.0978.54
Month / sourceReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-06EIA row 10108 · preliminaryCraig (CO)6021 · CO · COLOWYO MINE57,74277.969,5520.389.40ContractSUBRail
2026-05EIA row 8262 · preliminaryCraig (CO)6021 · CO · COLOWYO MINE128,36877.429,4900.4110.30ContractSUBRail
2026-04EIA row 6457 · preliminaryCraig (CO)6021 · CO · COLOWYO MINE174,55179.559,6960.348.10ContractSUBRail
2026-03EIA row 4643 · preliminaryCraig (CO)6021 · CO · COLOWYO MINE136,06581.219,9200.316.50ContractSUBRail
2025-09EIA row 25742 · finalCraig (CO)6021 · CO · COLOWYO MINE37,98578.989,7550.359.10ContractSUBRail
2025-08EIA row 22601 · finalCraig (CO)6021 · CO · COLOWYO MINE103,40681.129,9150.337.70ContractSUBRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON55.97Published county average
ESTIMATED SALES · SHORT TONS1,728,783Allocated from published county sales
ESTIMATED COAL REVENUE · USD96,759,987Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Colowyo Mine0502962 · Moffat, Colorado1,713,91955.971,728,78396,759,987County allocation estimate32.95% of eligible county production4 eligible mines / 4 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYKiewit Peter Sons' Inc → Kiewit Mining Group Inc → Colowyo Mine
HISTORY RECORDS614 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Kiewit Peter Sons' InccontrolsKiewit Mining Group IncoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
—

Tri-State Generation and Transmission Assn InccontrolsColowyo Coal Company L PoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
—

Western Fuels Assoc Inc et alcontrolsColowyo Coal Company L PoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
—

Tri-State Generation & Transmission Assn Inc et alcontrolsColowyo Coal Company L PoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
—

RTZ-CRA GroupcontrolsColowyo Coal Company L PoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
—

W R Grace & CompanycontrolsColowyo Coal Company L PoperatesColowyo Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

114 historical accident/injury rows; 1 coded fatalities and 2,580 lost days across the published record.

ACCIDENT + INJURY RECORD28 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

671 violation rows across the full record; 130 carry an S&S flag and $448,768 appears in current assessed amounts.

ENFORCEMENT ACTIVITY30 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

623 coal dust; 60 coal quartz; 237 noise. 0 personal-sample rows have a published C/E ratio above 1; 8 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE920 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

79K employee hours and 152 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

41 contested-violation rows, 42 civil-penalty docket/decision rows, and 10 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE93 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT22 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

147 inspection events and 12K published inspection hours across the historical record.

OVERSIGHT COVERAGE24 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records11 coal · 0 personal · 0 area
Sample status1 not voided0 voided · 0 status not reported
Mean coal quartz concentration3 µg/m³1 eligible measurements · 0 missing concentration
2026 · Mar 5, 2026–Mar 5, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58544923 / lab 2026011893Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION3 µg/m³3.7% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION1,713,919short tons
LABOR HOURS
305,379
AVG EMPLOYEES
184
SUPPLY REGION
Uinta Region
UNION
No union code published
OPERATION
Mine and Preparation Plant
COMPANY TYPE
Operating Subsidiary

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

TITLE 30 CROSSWALKCurrent through 2026-08-19

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
503125677.1102Citation
503125577.404(a)Citation
503125477.1110Citation
503125377.1110Citation
503125277.502Citation
503125177.1110Citation
503125077.404(a)Citation
503191177.1110Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustBULLDOZER OPERATOR
.03 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.084 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.035 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.086 mg/m³Not voided
NoiseBULLDOZER OPERATOR
PEL dose: 2%Action-level dose: 17%
NoiseBULLDOZER OPERATOR
PEL dose: 1%Action-level dose: 16%
Coal dustBULLDOZER OPERATOR
.167 mg/m³Voided · DISCARDED SAMPLE (TOO OLD)
Coal dustBULLDOZER OPERATOR
.031 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors114May 15, 2000—Sep 12, 2026mine-keyed
Addresses of Recordidentity · logistics1Jul 20, 2026—Jul 20, 2026mine-keyed
Assessed Violationscompliance · legal664May 10, 2000—Aug 5, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal42May 1, 2002—Jan 14, 2022mine-keyed
Coal Dust Sampleshealth · safety623Jan 5, 2000—Sep 23, 2026mine-keyed
Conferencescompliance · legal10May 15, 2001—Jan 11, 2013mine-keyed
Contested Violationscompliance · legal41Dec 19, 2007—Jun 3, 2021mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety5,428Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety1,078Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance6Oct 1, 1976—Jan 5, 2026mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance360Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance81Not published—Not publishedmine-keyed
Inspectionssafety · compliance147Mar 20, 2000—Oct 8, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment237Apr 3, 2000—Jul 22, 2026mine-keyed
Quartz Samples — Coalhealth · safety60Mar 21, 2000—Mar 5, 2026mine-keyed
Violationscompliance · safety · legal671May 10, 2000—Aug 5, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.