Berwind Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Main mine fan examinations and records.
30 CFR 75.312(e) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $9,757.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $313.00 proposed penalty
Installation of main mine fans.
30 CFR 75.310(a)(5) · $1,818.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.8 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $959.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Short circuit protection of trailing cables.
30 CFR 75.601 · $1,037.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $432.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
Employee stepped down off the flat car and twisted EE's ankle while unloading supplies.
Spot Inspections
103(i) · 8.0 on-site hours reported
Ventilation controls.
30 CFR 75.333(b)(1) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Self-rescue devices; use and location requirements.
30 CFR 75.1714-2(b) · $1,037.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.