← Berwind Deep Mine

Berwind Deep Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5098217

    30 CFR 75.503 · $245.00 proposed penalty

  2. Permanent splicing of trailing cables.

    violationRecord 5098216

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5098215

    30 CFR 75.512 · $267.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5092028

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5092027

    30 CFR 75.512 · $1,968.00 proposed penalty

  6. Installation of water sprinkler systems; requirements.

    violationRecord 5092026

    30 CFR 75.1101-7(c) · $151.00 proposed penalty

  7. Preshift examination at fixed intervals.

    violationRecord 5092025

    30 CFR 75.360(f) · $1,037.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 5092024

    30 CFR 75.512 · $883.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5092023

    30 CFR 75.400 · $697.00 proposed penalty

  10. Spot Inspections

    inspectionRecord 7048162

    103(i) · 4.8 on-site hours reported

  11. Additional information on mine map.

    violationRecord 9591699

    30 CFR 75.1200-1(k) · $151.00 proposed penalty

  12. Additional information on mine map.

    violationRecord 9566944

    30 CFR 75.1200-1(j) · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5098214

    30 CFR 75.400 · $697.00 proposed penalty

  14. Automatic fire sensors.

    violationRecord 5098213

    30 CFR 75.1103-1(b) · $151.00 proposed penalty

  15. Violation — cited standard not reported

    violationRecord 5098212

    $4,497.00 proposed penalty

  16. Identification of circuit breakers.

    violationRecord 5098211

    30 CFR 75.904 · $465.00 proposed penalty

  17. Travelways at surface installations.

    violationRecord 5098210

    30 CFR 77.205(b) · $209.00 proposed penalty

  18. Maintenance of incombustible content of rock dust.

    violationRecord 5091129

    30 CFR 75.403 · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F017F22

    103(i) · 5.0 on-site hours reported

  20. Roof control plan.

    violationRecord 5092022

    30 CFR 75.220(a)(1) · $697.00 proposed penalty

  21. Clamping of trailing cables to equipment.

    violationRecord 5092021

    30 CFR 75.605 · $313.00 proposed penalty

  22. Machinery and equipment; operation and maintenance.

    violationRecord 5092020

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5092019

    30 CFR 75.517 · $592.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5092018

    30 CFR 75.400 · $697.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5092017

    30 CFR 75.202(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.