Berwind Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 8.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S)
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f)
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Examination and maintenance of firefighting equipment.
30 CFR 77.1110
Low- and medium-voltage ground check monitor circuits.
30 CFR 75.902
Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.
30 CFR 75.900 · Significant and substantial (S&S)
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1
Map of electrical system.
30 CFR 75.508
Spot Inspections
103(i) · 9.8 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b)
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1)
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S)
Spot Inspections
103(i) · 9.3 on-site hours reported
Escapeway maps.
30 CFR 75.1505(b)
Automatic emergency-parking brakes.
30 CFR 75.523-3(b)(5)
Accumulation of combustible materials.
30 CFR 75.400
Spot Inspections
103(i) · 9.5 on-site hours reported
Power wires and cables; insulation and protection.
30 CFR 75.517
Regular Safety and Health Inspection
40.8 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1)
Spot Inspections
103(i) · 6.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.