MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

#7 Prep Plant

NonProducingFacilityCoal (Bituminous)
MSHA MINE ID4404212
LOCATIONBuchanan, VA
PUBLIC RECORD3,317 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

15

2 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q38
  4. 2025 Q45
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,522.00

15 of 15 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q31,208
  4. 2025 Q41,012
  5. 2026 Q1151
  6. 2026 Q2151
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

229.50

9 inspections · 9 with hours

  1. 2025 Q1—
  2. 2025 Q284.00
  3. 2025 Q3—
  4. 2025 Q474.00
  5. 2026 Q19.50
  6. 2026 Q253.50
  7. 2026 Q38.50
  8. 2026 Q4 *0.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—00184.0
2025-Q3811,208.00000—
2025-Q4511,012.0000474.0
2026-Q110151.000019.5
2026-Q210151.0000153.5
2026-Q300—0018.5
2026-Q4 *00—0010.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF01A211

    Regular Safety and Health Inspection · 0.0 on-site hours

  2. inspectionF00DFE1

    Impoundment Spot Inspection · 8.5 on-site hours

  3. violation8309449

    77.200 · $151.00 proposed

  4. inspectionF01A202

    Regular Safety and Health Inspection · 53.5 on-site hours

  5. violation9099683

    77.216(d) · $151.00 proposed

  6. inspectionF00B7F6

    Impoundment Spot Inspection · 9.5 on-site hours

  7. inspection4135146

    Spot Inspection · 6.0 on-site hours

  8. inspectionF000B2B

    Spot Inspection · 2.0 on-site hours

  9. inspectionF000B2A

    Verbal Hazard Complaint Inspections · 4.8 on-site hours

  10. violation8309434

    77.200 · $165.00 proposed

  11. violation8309429

    77.204 · S&S · $366.00 proposed

  12. violation8309428

    77.400(a) · $151.00 proposed

  13. violation8309427

    77.200 · $165.00 proposed

  14. violation8309426

    77.200 · $165.00 proposed

  15. inspectionF000B20

    Regular Safety and Health Inspection · 61.3 on-site hours

  16. violation9099681

    77.216(d) · $151.00 proposed

  17. violation8285673

    77.1605(d) · $151.00 proposed

  18. violation8285672

    77.1605(d) · $151.00 proposed

  19. violation8285671

    77.1606(c) · $151.00 proposed

  20. violation8285670

    77.404(a) · S&S · $151.00 proposed

  21. violation8285669

    77.410(a) · $151.00 proposed

  22. violation8285668

    77.1606(c) · $151.00 proposed

  23. violation8285667

    77.1607(g) · $151.00 proposed

  24. inspectionF000B11

    Regular Safety and Health Inspection · 84.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
#7 Prep Plant4404212 · Buchanan, Virginia0———Preparation plant6 eligible mines / 6 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYMetinvest B V → Wellmore Coal Company, LLC → #7 Prep Plant
HISTORY RECORDS616 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Metinvest B VcontrolsWellmore Coal Company, LLCoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
—

United CompanycontrolsWellmore Coal Company, LLCoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
—

Southern Mining CocontrolsWellmore Coal Company, LLCoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
—

Kenneth L StacycontrolsWellmore Coal Corpoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
—

Massey Energy CompanycontrolsWellmore Coal Corpoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
—

United CompanycontrolsWellmore Coal Corpoperates#7 Prep Plant

msha-controller-operator-history · controller/operator co-tenure derived on mine 4404212
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYneutral

Accidents and injuries

14 historical accident/injury rows; 0 coded fatalities and 380 lost days across the published record.

ACCIDENT + INJURY RECORD0 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

482 violation rows across the full record; 191 carry an S&S flag and $78,797 appears in current assessed amounts.

ENFORCEMENT ACTIVITY75 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

295 coal dust; 11 coal quartz; 120 noise. 0 personal-sample rows have a published C/E ratio above 1; 8 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE426 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

700 employee hours and 1 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

4 contested-violation rows, 4 civil-penalty docket/decision rows, and 30 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE38 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT23 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

255 inspection events and 6K published inspection hours across the historical record.

OVERSIGHT COVERAGE24 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records00 coal · 0 personal · 0 area
Sample status0 not voided0 voided · 0 status not reported
Mean coal quartz concentration— µg/m³0 eligible measurements · 0 missing concentration
2026 · No reported dates in this selection
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
No silica records match these filters. Missing samples do not establish safe conditions.
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
830944977.200Citation
909968377.216(d)Citation
830943477.200Citation
830942977.204S&S
830942877.400(a)Citation
830942777.200Citation
830942677.200Citation
909968177.216(d)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustBULLDOZER OPERATOR
.018 mg/m³Voided · DISCARDED SAMPLE (TOO OLD)
Coal dustBULLDOZER OPERATOR
.066 mg/m³Not voided
NoiseBULLDOZER OPERATOR
PEL dose: 1%Action-level dose: 7%
Coal dustBULLDOZER OPERATOR
.044 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.007 mg/m³Not voided
Coal dustCLEANUP MAN
.171 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.03 mg/m³Not voided
NoiseCLEANUP MAN
PEL dose: 5%Action-level dose: 17%

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors14Oct 4, 2000—Nov 11, 2020mine-keyed
Addresses of Recordidentity · logistics1Aug 26, 2026—Aug 26, 2026mine-keyed
Assessed Violationscompliance · legal477Mar 25, 2000—Apr 15, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal4Mar 14, 2006—Sep 26, 2014mine-keyed
Coal Dust Sampleshealth · safety295May 23, 2000—Jun 30, 2026mine-keyed
Conferencescompliance · legal30Jan 9, 2008—Oct 10, 2023mine-keyed
Contested Violationscompliance · legal4Apr 21, 2005—Apr 30, 2013mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,193Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety247Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance6Dec 15, 1975—Jan 13, 2000mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance150Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance27Not published—Not publishedmine-keyed
Inspectionssafety · compliance255Jan 13, 2000—Oct 8, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment120Jun 12, 2000—May 5, 2026mine-keyed
Quartz Samples — Coalhealth · safety11Jun 12, 2000—Mar 25, 2024mine-keyed
Violationscompliance · safety · legal482Mar 25, 2000—Apr 15, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.