← William Ridley Elkins Jr

William Ridley Elkins Jr safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Automatic emergency-parking brakes.

    violationRecord 9880671
    MINE #9 · 4407217

    30 CFR 75.523-3(c)(2) · $151.00 proposed penalty

  2. Automatic emergency-parking brakes.

    violationRecord 9880670
    MINE #9 · 4407217

    30 CFR 75.523-3(d)(1) · $151.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 9880669
    MINE #9 · 4407217

    30 CFR 75.503 · $151.00 proposed penalty

  4. Underground electrical installations.

    violationRecord 9880267
    MINE #9 · 4407217

    30 CFR 75.340(a)(1)(i) · $151.00 proposed penalty

  5. Drill dust control at underground areas of underground mines.

    violationRecord 9879508
    MINE #9 · 4407217

    30 CFR 72.630(b) · $151.00 proposed penalty

  6. Mechanical equipment guards.

    violationRecord 9879507
    MINE #9 · 4407217

    30 CFR 77.400(c) · $151.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 9880648
    MINE #9 · 4407217

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  8. Condition and examination of firefighting equipment.

    violationRecord 9880647
    MINE #9 · 4407217

    30 CFR 75.1100-3 · $151.00 proposed penalty

  9. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 9880646
    MINE #9 · 4407217

    30 CFR 75.1101-10 · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9880645
    MINE #9 · 4407217

    30 CFR 75.400 · $193.00 proposed penalty

  11. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 9880644
    MINE #9 · 4407217

    30 CFR 75.1101-10 · $151.00 proposed penalty

  12. Travelways at surface installations.

    violationRecord 9880899
    MINE #9 · 4407217

    30 CFR 77.205(b) · Significant and substantial (S&S) · $432.00 proposed penalty

  13. Type and capacity of firefighting equipment.

    violationRecord 9880898
    MINE #9 · 4407217

    30 CFR 77.1108-1(b)(3) · $151.00 proposed penalty

  14. Escapeways; bituminous and lignite mines.

    violationRecord 9880637
    MINE #9 · 4407217

    30 CFR 75.380(d)(7)(v) · $177.00 proposed penalty

  15. Roof testing and scaling.

    violationRecord 9880636
    MINE #9 · 4407217

    30 CFR 75.211(d) · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 9880635
    MINE #9 · 4407217

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F004564
    MINE #9 · 4407217

    100.3 on-site hours reported

  18. Spot Inspection

    inspectionRecord 4134138
    MINE #9 · 4407217

    5.3 on-site hours reported

  19. Spot Inspection

    inspectionRecord F006279
    MINE #9 · 4407217

    5.0 on-site hours reported

  20. Escapeways; bituminous and lignite mines.

    violationRecord 8281438
    MINE #9 · 4407217

    30 CFR 75.380(d)(1) · $151.00 proposed penalty

  21. Violation — cited standard not reported

    violationRecord 8281437
    MINE #9 · 4407217

    Significant and substantial (S&S) · $4,871.00 proposed penalty

  22. Installation of high-voltage transmission cables.

    violationRecord 8281436
    MINE #9 · 4407217

    30 CFR 75.807 · $151.00 proposed penalty

  23. Violation — cited standard not reported

    violationRecord 8281435
    MINE #9 · 4407217

    $168.00 proposed penalty

  24. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 8281434
    MINE #9 · 4407217

    30 CFR 75.1103-8(a) · $151.00 proposed penalty

  25. Automatic fire sensor and warning device systems; installation; minimum requirements.

    violationRecord 8281433
    MINE #9 · 4407217

    30 CFR 75.1103-4(a)(1)(iv) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.