ACTIVE / CONTROLLER PORTFOLIO

Thomas R Hamilton

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC03974

MINE PORTFOLIO

9 of 9 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Balkan1518986 · Active6/8 quarters reportedBell, KYFacility · MSHA: Coal (Bituminous)093,778404405.5
Cawood #11519963 · Active6/8 quarters reportedHarlan, KYUnderground · MSHA: Coal (Bituminous)50,43455,362542788.0
Colmar1519884 · Active6/8 quarters reportedBell, KYSurface · MSHA: Coal (Bituminous)187,68658,082362398.5
Cranks Creek1519858 · Active6/8 quarters reportedHarlan, KYSurface · MSHA: Coal (Bituminous)208,300139,304553409.8
Defeated Creek1519931 · Active6/8 quarters reportedLetcher, KYSurface · MSHA: Coal (Bituminous)105,50656,917582385.3
Four Mile1519432 · Active6/8 quarters reportedBell, KYSurface · MSHA: Coal (Bituminous)191,91068,527121277.3
Kelly Branch1519897 · Active6/8 quarters reportedHarlan, KYSurface · MSHA: Coal (Bituminous)204,898110,141741379.0
Mayflower Preparation Plant4405605 · Active6/8 quarters reportedLee, VAFacility · MSHA: Coal (Bituminous)015,554430254.0
Meadow Branch1519890 · Active6/8 quarters reportedLetcher, KYSurface · MSHA: Coal (Bituminous)294,694150,448752470.3

LOCATION

Portfolio map

9 of 9 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

447

63 significant & substantial (S&S)

  1. 2025 Q181
  2. 2025 Q256
  3. 2025 Q337
  4. 2025 Q451
  5. 2026 Q148
  6. 2026 Q294
  7. 2026 Q357
  8. 2026 Q4 *23

Accident records

17

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q24
  3. 2025 Q32
  4. 2025 Q43
  5. 2026 Q11
  6. 2026 Q24
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

133,158.00

376 of 447 violations with amounts

  1. 2025 Q129,793
  2. 2025 Q211,031
  3. 2025 Q312,968
  4. 2025 Q436,190
  5. 2026 Q115,367
  6. 2026 Q217,723
  7. 2026 Q310,086
  8. 2026 Q4 *—

On-site inspection hours

3,767.50

117 inspections · 117 with hours

  1. 2025 Q1487.00
  2. 2025 Q2572.25
  3. 2025 Q3321.75
  4. 2025 Q4612.50
  5. 2026 Q1458.75
  6. 2026 Q2684.75
  7. 2026 Q3576.50
  8. 2026 Q4 *54.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1811429,793.002017487.0
2025-Q2561011,031.00409572.3
2025-Q337812,968.002021321.8
2025-Q451836,190.003011612.5
2026-Q148715,367.001021458.8
2026-Q2941017,723.004012684.8
2026-Q357510,086.001022576.5
2026-Q4 *231—00454.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5085634
    Cawood #1 · 1519963

    75.370(a)(1)

  2. violation5085633
    Cawood #1 · 1519963

    75.1731(b)

  3. violation5085632
    Cawood #1 · 1519963

    75.512

  4. violation5085631
    Cawood #1 · 1519963

    75.400

  5. violation5085630
    Cawood #1 · 1519963

    75.400

  6. violation5086103
    Cawood #1 · 1519963

    75.380(d)(7)(vi)

  7. violation5086102
    Cawood #1 · 1519963

    75.380(d)(7)(vii)

  8. violation5086101
    Cawood #1 · 1519963

    Description not reported

  9. violation5086100
    Cawood #1 · 1519963

    75.1504(a)

  10. inspectionF03037C
    Balkan · 1518986

    Impoundment Spot Inspection · 0.0 on-site hours

  11. inspectionF02118A
    Cawood #1 · 1519963

    Verbal Hazard Complaint Inspections · 2.0 on-site hours

  12. violation5086099
    Cawood #1 · 1519963

    75.333(h)

  13. violation5086098
    Cawood #1 · 1519963

    75.220(a)(1)

  14. violation5086097
    Cawood #1 · 1519963

    75.1100-3

  15. violation9272241
    Mayflower Preparation Plant · 4405605

    77.1605(d)

  16. violation9272240
    Mayflower Preparation Plant · 4405605

    77.1605(b)

  17. violation9272239
    Mayflower Preparation Plant · 4405605

    77.1605(d)

  18. violation9272238
    Mayflower Preparation Plant · 4405605

    77.1605(d)

  19. violation9272237
    Mayflower Preparation Plant · 4405605

    77.1605(d)

  20. violation9272236
    Mayflower Preparation Plant · 4405605

    77.1109(c)(1)

  21. violation9272235
    Mayflower Preparation Plant · 4405605

    77.1606(c)

  22. violation5086207
    Cawood #1 · 1519963

    75.1100-3

  23. violation5086206
    Cawood #1 · 1519963

    75.1714-4(f)

  24. violation5086205
    Cawood #1 · 1519963

    75.1403 · S&S

  25. violation5086204
    Cawood #1 · 1519963

    77.1605(k)

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS343,21932 rows · 5 receiving plants
HEAT CONTENT · BTU/LB12,733Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.90 / 7.07Separate averages over measured receipts
DELIVERED COST · USD/TON108.9221.6% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *50,90012,7400.847.12108.84
2025-Q494,24212,6840.906.84110.53
2026-Q190,50912,7420.906.65—
2026-Q275,92212,6981.027.89107.39
2026-Q3 *31,64612,9230.676.84107.17
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11580 · preliminaryFOUR MILE1519432Cooper1384 · KY · NALLY & HAMILTON5,980107.1712,4851.0710.00SpotBITTruck
2026-07EIA row 12647 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON25,666—Not published13,0250.586.10SpotBITRail / Truck
2026-06EIA row 9687 · preliminaryFOUR MILE1519432Cooper1384 · KY · NALLY & HAMILTON18,006107.3912,5101.1710.00SpotBITTruck
2026-06EIA row 10703 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON7,768—Not published12,6801.388.30SpotBITRail / Truck
2026-06EIA row 10704 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON10,500—Not published12,7950.595.80SpotBITRail / Truck
2026-05EIA row 8827 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON11,426—Not published12,6051.298.60SpotBITRail / Truck
2026-05EIA row 8828 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON8,400—Not published12,7800.646.40SpotBITRail / Truck
2026-04EIA row 7040 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON8,400—Not published13,2700.605.30SpotBITRail / Truck
2026-04EIA row 7041 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON11,422—Not published12,5301.278.50SpotBITRail / Truck
2026-03EIA row 5208 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON4,665—Not published12,5251.348.00SpotBITRail / Truck
2026-03EIA row 5209 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON5,252—Not published13,0900.556.00SpotBITRail / Truck
2026-03EIA row 5221 · preliminaryMAYFLOWER PREPARATION PLANT4405605Florence Mill50806 · SC · CARBON PARTNERS, INC .7,400—Not published12,4000.534.30ContractBITRail
2026-02EIA row 3314 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON18,653—Not published12,5401.267.70SpotBITRail / Truck
2026-02EIA row 3315 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON15,750—Not published12,8350.686.90SpotBITRail / Truck
2026-01EIA row 1347 · preliminaryMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON15,750—Not published13,1800.716.20SpotBITRail / Truck
2026-01EIA row 1348 · preliminaryBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON15,539—Not published12,7201.127.30SpotBITRail / Truck
2026-01EIA row 1363 · preliminaryMAYFLOWER PREPARATION PLANT4405605Florence Mill50806 · SC · CARBON PARTNERS, INC .7,500—Not published12,4000.775.10ContractBITRail
2025-12EIA row 35669 · finalBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON6,564—Not published12,2601.2110.30SpotBITRail / Truck
2025-12EIA row 35670 · finalMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON14,610—Not published12,7500.716.20SpotBITRail / Truck
2025-12EIA row 35708 · finalMAYFLOWER PREPARATION PLANT4405605Florence Mill50806 · SC · CARBON PARTNERS, INC .7,500—Not published12,4000.775.10ContractBITRail / Truck
2025-11EIA row 31511 · finalBALKAN1518986Williams3298 · SC · NALLY & HAMILTON12,831110.2012,6001.119.20SpotBITRail
2025-11EIA row 32656 · finalMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON7,350—Not published12,8500.645.60SpotBITRail / Truck
2025-11EIA row 32658 · finalBALKAN1518986Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON14,037—Not published12,7501.076.70SpotBITRail / Truck
2025-10EIA row 28560 · finalBALKAN1518986Williams3298 · SC · NALLY & HAMILTON11,922110.8912,7200.906.00SpotBITRail
2025-10EIA row 29714 · finalMAYFLOWER PREPARATION PLANT4405605Tennessee Eastman Operations50481 · TN · NALLY & HAMILTON8,400—Not published12,9400.625.70SpotBITRail / Truck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON92.27Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS709,703Allocated from published county sales
ESTIMATED COAL REVENUE · USD65,481,677Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED80.5%4 of 7 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Meadow Branch1519890 · Letcher, Kentucky250,70592.61254,78323,595,470County allocation estimate18.28% of eligible county production8 eligible mines / 8 sales respondents
Defeated Creek1519931 · Letcher, Kentucky168,57692.61171,31815,865,778County allocation estimate12.29% of eligible county production8 eligible mines / 8 sales respondents
Cranks Creek1519858 · Harlan, Kentucky151,39791.75151,92213,938,812County allocation estimate6.67% of eligible county production13 eligible mines / 13 sales respondents
Kelly Branch1519897 · Harlan, Kentucky131,22591.75131,68012,081,617County allocation estimate5.78% of eligible county production13 eligible mines / 13 sales respondents
Balkan1518986 · Bell, Kentucky0———Preparation plant2 eligible mines / 2 sales respondents
Four Mile1519432 · Bell, Kentucky119,890———County sales or price not published2 eligible mines / 2 sales respondents
Colmar1519884 · Bell, Kentucky44,061———Below EIA sales-reporting threshold2 eligible mines / 2 sales respondents
Cawood #11519963 · Harlan, Kentucky6,29391.75——Below EIA sales-reporting threshold13 eligible mines / 13 sales respondents
Mayflower Preparation Plant4405605 · Lee, Virginia0———Preparation plant
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.