Ramaco Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Water spray devices; capacity; water supply; minimum requirements.
Laurel Fork Mine · 460908430 CFR 75.1107-7(b) · $398.00 proposed penalty
Methane monitors.
Laurel Fork Mine · 460908430 CFR 75.342(a)(4) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
Laurel Fork Mine · 460908430 CFR 75.370(a)(1) · $959.00 proposed penalty
Accumulation of combustible materials.
Laurel Fork Mine · 460908430 CFR 75.400 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Laurel Fork Mine · 460908430 CFR 75.512 · $209.00 proposed penalty
Permanent splicing of trailing cables.
Laurel Fork Mine · 460908430 CFR 75.604(b) · $366.00 proposed penalty
Accumulation of combustible materials.
Laurel Fork Mine · 460908430 CFR 75.400 · $697.00 proposed penalty
Ventilation controls.
Berwind Deep Mine · 460953330 CFR 75.333(e)(1)(ii) · $1,550.00 proposed penalty
Violation — cited standard not reported
Crucible Deep Mine · 4609614$168.00 proposed penalty
Conventional roof support.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.206(e) · $245.00 proposed penalty
Atmospheric monitoring systems.
Laurel Fork Mine · 460908430 CFR 75.351(h) · $151.00 proposed penalty
Inspection of fire suppression devices.
Laurel Fork Mine · 460908430 CFR 75.1107-16-b · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Laurel Fork Mine · 460908430 CFR 75.512 · $755.00 proposed penalty
Machinery and equipment; operation and maintenance.
Laurel Fork Mine · 460908430 CFR 75.1725(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Requirements for written safety program.
Ram Surface Mine No. 1 · 460953730 CFR 77.2103(b) · $151.00 proposed penalty
Records of certified and qualified persons.
Ram Surface Mine No. 1 · 460953730 CFR 77.106 · $151.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 1 · 460953730 CFR 77.1605(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 1 · 460953730 CFR 77.1605(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 1 · 460953730 CFR 77.1605(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 7.5 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Elk Creek Plant · 460244430 CFR 77.1606(c) · $151.00 proposed penalty
Preshift examination at fixed intervals.
Laurel Fork Mine · 460908430 CFR 75.360(f) · $151.00 proposed penalty
Accumulation of combustible materials.
Laurel Fork Mine · 460908430 CFR 75.400 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Other safeguards.
Laurel Fork Mine · 460908430 CFR 75.1403 · $398.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
Laurel Fork Mine · 460908430 CFR 75.363(b) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.