← Ramaco Resources Inc

Ramaco Resources Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-11-07Database snapshot · 2026-11-07

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9839238
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.400 · $697.00 proposed penalty

  2. Permanent splicing of trailing cables.

    violationRecord 9838878
    Berwind Deep Mine · 4609533

    30 CFR 75.604(b) · $883.00 proposed penalty

  3. Ground control; inspection and maintenance; general.

    violationRecord 9839401
    Ram Surface Mine No. 1 · 4609537

    30 CFR 77.1004(b) · $592.00 proposed penalty

  4. Travelways at surface installations.

    violationRecord 9839400
    Ram Surface Mine No. 1 · 4609537

    30 CFR 77.205(d) · $883.00 proposed penalty

  5. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 9838755
    NO. 2 GAS · 4609541

    30 CFR 75.1107-4(a)(2)(i) · $151.00 proposed penalty

  6. Roof control plan.

    violationRecord 9838754
    NO. 2 GAS · 4609541

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  7. Violation — cited standard not reported

    violationRecord 9837124
    NO. 2 GAS · 4609541

    $168.00 proposed penalty

  8. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 9839124
    Crucible Deep Mine · 4609614

    30 CFR 75.1106-3(a)(2) · $226.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 9839123
    Crucible Deep Mine · 4609614

    30 CFR 75.512 · $226.00 proposed penalty

  10. Electric equipment; examination, testing and maintenance.

    violationRecord 9839122
    Crucible Deep Mine · 4609614

    30 CFR 75.512 · $226.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F004F6C
    Laurel Fork Mine · 4609084

    103(i) · 8.0 on-site hours reported

  12. Permissible electric face equipment; maintenance.

    violationRecord 9879846
    Laurel Fork Mine · 4609084

    30 CFR 75.503 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9879845
    Laurel Fork Mine · 4609084

    30 CFR 75.400 · $755.00 proposed penalty

  14. Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.

    violationRecord 9879844
    Laurel Fork Mine · 4609084

    30 CFR 75.1710-1(d) · $288.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 9838753
    NO. 2 GAS · 4609541

    30 CFR 75.512 · $504.00 proposed penalty

  16. Roof control plan.

    violationRecord 9838752
    NO. 2 GAS · 4609541

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 9838751
    NO. 2 GAS · 4609541

    30 CFR 75.512 · $504.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 9838750
    NO. 2 GAS · 4609541

    30 CFR 75.503 · $549.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 9838749
    NO. 2 GAS · 4609541

    30 CFR 75.512 · $504.00 proposed penalty

  20. Permissible electric face equipment; maintenance.

    violationRecord 9838748
    NO. 2 GAS · 4609541

    30 CFR 75.503 · $549.00 proposed penalty

  21. Methane monitors.

    violationRecord 9838747
    NO. 2 GAS · 4609541

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 9838746
    NO. 2 GAS · 4609541

    30 CFR 75.512 · $504.00 proposed penalty

  23. Ventilation controls.

    violationRecord 9839121
    Crucible Deep Mine · 4609614

    30 CFR 75.333(c)(2) · $267.00 proposed penalty

  24. Machinery

    accidentRecord 220250580013
    Laurel Fork Mine · 4609084

    Days away from work only

    Accident narrative

    While working to repair dust vacuum hose on the roof bolting machine the drill boom was inadvertently raised pinching the injured employee's fingers between the top of the drill pot and the mine roof resulting in lacerations requiring stitches to two fingers.

  25. Slip or fall of person

    accidentRecord 220250660005
    Elk Creek Plant · 4602444

    Days away from work only

    Accident narrative

    Employee was climbing off the belt after clearing the grizzly bars and twisted EE's right ankle on 2/18/2025. The employee was later treated on 2/20/2025 and received a full release. The employee later sought treatment again on 2/26/2025 and was written off work at that time.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.