ACTIVE / CONTROLLER PORTFOLIO

NACCO Industries Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC01333

MINE PORTFOLIO

5 of 5 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Coyote Creek Mine3201028 · Active6/8 quarters reportedMercer, NDSurface · MSHA: Coal (Lignite)2,858,764329,077123152.5
Falkirk Mine3200491 · Active6/8 quarters reportedMclean, NDSurface · MSHA: Coal (Lignite)10,741,8911,355,723255295.3
Five Forks Mine1601499 · Active6/8 quarters reportedNatchitoches, LASurface · MSHA: Coal (Lignite)404,641104,28270146.8
Freedom Mine3200595 · Active6/8 quarters reportedMercer, NDSurface · MSHA: Coal (Lignite)17,549,5601,483,957484492.8
Red Hills Mine2200690 · Active6/8 quarters reportedChoctaw, MSSurface · MSHA: Coal (Lignite)3,762,950699,65212104.5

LOCATION

Portfolio map

5 of 5 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

93

13 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q24
  3. 2025 Q315
  4. 2025 Q41
  5. 2026 Q119
  6. 2026 Q214
  7. 2026 Q336
  8. 2026 Q4 *0

Accident records

14

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q23
  3. 2025 Q31
  4. 2025 Q41
  5. 2026 Q15
  6. 2026 Q21
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

23,816.00

73 of 93 violations with amounts

  1. 2025 Q1632
  2. 2025 Q21,204
  3. 2025 Q34,799
  4. 2025 Q4151
  5. 2026 Q14,380
  6. 2026 Q27,277
  7. 2026 Q35,373
  8. 2026 Q4 *—

On-site inspection hours

1,191.75

36 inspections · 36 with hours

  1. 2025 Q1138.00
  2. 2025 Q2118.00
  3. 2025 Q3234.50
  4. 2025 Q462.50
  5. 2026 Q1291.00
  6. 2026 Q290.75
  7. 2026 Q3257.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q140632.00104138.0
2025-Q2401,204.00303118.0
2025-Q31504,799.001012234.5
2025-Q410151.0010162.5
2026-Q11924,380.00506291.0
2026-Q21427,277.0010190.8
2026-Q33695,373.00209257.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5054627
    Falkirk Mine · 3200491

    77.205(a) · S&S

  2. accident220260630011
    Falkirk Mine · 3200491

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    EMPLOYEE WAS STEPPING DOWN A STAIRS NOT FACING THE STAIRS AND WITHOUT THREE POINTS OF CONTACT WHEN EE LOST EE'S FOOTING AND SLID DOWN THE LAST THREE STEPS LANDING AWKWARDLY ON EE'S RIGHT ANKLE CAUSING A FRACTURE TO EE'S TIBIA ABOVE THE ANKLE.

  3. violation9340034
    Falkirk Mine · 3200491

    77.400(d) · $245.00 proposed

  4. violation5054626
    Falkirk Mine · 3200491

    77.1606(a) · $151.00 proposed

  5. violation5054625
    Falkirk Mine · 3200491

    77.410(c) · $151.00 proposed

  6. accident220260540032
    Falkirk Mine · 3200491

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    While working on top of a Marion 8750 dragline tub an employee fell into a lower compartment injuring a rib.

  7. violation5054624
    Falkirk Mine · 3200491

    77.205(b) · $151.00 proposed

  8. violation5054623
    Falkirk Mine · 3200491

    77.1104 · $151.00 proposed

  9. violation5054622
    Falkirk Mine · 3200491

    77.208(d) · $151.00 proposed

  10. inspectionF0175EA
    Falkirk Mine · 3200491

    Regular Safety and Health Inspection · 98.3 on-site hours

  11. accident220260440005
    Coyote Creek Mine · 3201028

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was operating a loaded end dump truck, while EE was steering with EE's left arm EE received a sharp pain in EE's left shoulder. The employee did not report EE's injury to a supervisor until 2 hours after EE's shift ended at 4:00 p.m. EE sought medical attention hours later and was informed by that doctor to take the rest of the week off and got referred to an ortho dr.

  12. violation5054404
    Coyote Creek Mine · 3201028

    48.27 · S&S · $374.00 proposed

  13. violation5054403
    Coyote Creek Mine · 3201028

    77.205(b) · $151.00 proposed

  14. inspectionF01486B
    Coyote Creek Mine · 3201028

    Regular Safety and Health Inspection · 32.3 on-site hours

  15. violation5062007
    Red Hills Mine · 2200690

    77.1104 · $151.00 proposed

  16. inspectionF02C4B9
    Red Hills Mine · 2200690

    Regular Safety and Health Inspection · 22.0 on-site hours

  17. inspectionF02C4B8
    Red Hills Mine · 2200690

    Verbal Hazard Complaint Inspections · 3.0 on-site hours

  18. accident220260090018
    Red Hills Mine · 2200690

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    The employee was raising the boarding ladder when it passed the stop and pinched their hand between the handrail and the ladder rail.

  19. violation5000953
    Five Forks Mine · 1601499

    77.404(a) · $151.00 proposed

  20. inspectionF028969
    Five Forks Mine · 1601499

    Regular Safety and Health Inspection · 62.5 on-site hours

  21. accident220253350025
    Falkirk Mine · 3200491

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    When replacing the windshield on a front-end loader, the employee cut right index finger resulting in stitches.

  22. inspectionF0175E3
    Falkirk Mine · 3200491

    Spot Inspection · 12.0 on-site hours

  23. accident220252680002
    Freedom Mine · 3200595

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was getting out of a pickup to throw away trash and when their left foot contacted the ground, they felt a pain in their left knee. Medical attention was sought, and crutches and a knee brace were issued.

  24. inspectionF0175E2
    Coyote Creek Mine · 3201028

    Spot Inspection · 8.5 on-site hours

  25. inspectionF0175E1
    Freedom Mine · 3200595

    Spot Inspection · 11.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS19,375,34460 rows · 5 receiving plants
HEAT CONTENT · BTU/LB6,431Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.76 / 10.72Separate averages over measured receipts
DELIVERED COST · USD/TON26.4788.7% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *3,187,6816,3850.7210.5925.04
2025-Q45,183,7936,4010.7510.6129.15
2026-Q14,814,1546,4710.8110.6925.40
2026-Q24,463,9566,4170.7411.1325.78
2026-Q3 *1,725,7606,5260.8010.3626.04
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11761 · preliminaryFREEDOM MINE3200595Leland Olds2817 · ND · DAKOTA COAL227,10929.556,8401.009.80ContractLIGRail / Truck
2026-07EIA row 12016 · preliminaryFALKIRK MINE3200491Coal Creek6030 · ND · FALKIRK748,92724.086,2800.6311.00ContractLIGTram/conveyor
2026-07EIA row 12225 · preliminaryFREEDOM MINE3200595Antelope Valley6469 · ND · DAKOTA COAL(FREEDOM MINE)458,47624.446,8531.049.40ContractLIGRail / Truck
2026-07EIA row 12492 · preliminaryCOYOTE CREEK MINE3201028Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC192,03133.376,9890.849.10ContractLIGTram/conveyor
2026-07EIA row 12715 · preliminaryRED HILLS MINE2200690Red Hills Generating Facility55076 · MS · MISSISSIPPI LIGNITE MINING99,217—Not published5,2600.4713.70ContractLIGTruck
2026-06EIA row 9869 · preliminaryFREEDOM MINE3200595Leland Olds2817 · ND · DAKOTA COAL252,52129.296,7960.868.80ContractLIGRail / Truck
2026-06EIA row 10109 · preliminaryFALKIRK MINE3200491Coal Creek6030 · ND · FALKIRK597,42130.716,3000.6311.30ContractLIGTram/conveyor
2026-06EIA row 10312 · preliminaryFREEDOM MINE3200595Antelope Valley6469 · ND · DAKOTA COAL(FREEDOM MINE)429,64424.226,7900.8710.00ContractLIGRail / Truck
2026-06EIA row 10545 · preliminaryCOYOTE CREEK MINE3201028Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC161,89031.087,0010.679.70ContractLIGTram/conveyor
2026-06EIA row 10770 · preliminaryRED HILLS MINE2200690Red Hills Generating Facility55076 · MS · MISSISSIPPI LIGNITE MINING153,406—Not published5,0000.5415.50ContractLIGTruck
2026-05EIA row 8025 · preliminaryFREEDOM MINE3200595Leland Olds2817 · ND · DAKOTA COAL314,14729.066,7900.819.10ContractLIGRail / Truck
2026-05EIA row 8264 · preliminaryFALKIRK MINE3200491Coal Creek6030 · ND · FALKIRK555,9320.286,3250.6312.00ContractLIGTram/conveyor
2026-05EIA row 8449 · preliminaryFREEDOM MINE3200595Antelope Valley6469 · ND · DAKOTA COAL(FREEDOM MINE)373,27124.426,8140.8710.40ContractLIGRail / Truck
2026-05EIA row 8660 · preliminaryCOYOTE CREEK MINE3201028Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC115,15743.047,0890.8010.10ContractLIGTram/conveyor
2026-05EIA row 8893 · preliminaryRED HILLS MINE2200690Red Hills Generating Facility55076 · MS · MISSISSIPPI LIGNITE MINING218,945—Not published5,0250.4814.90ContractLIGTruck
2026-04EIA row 6224 · preliminaryFREEDOM MINE3200595Leland Olds2817 · ND · DAKOTA COAL311,97229.056,8450.959.60ContractLIGRail / Truck
2026-04EIA row 6459 · preliminaryFALKIRK MINE3200491Coal Creek6030 · ND · FALKIRK251,31547.916,3200.6111.40ContractLIGTram/conveyor
2026-04EIA row 6656 · preliminaryFREEDOM MINE3200595Antelope Valley6469 · ND · DAKOTA COAL(FREEDOM MINE)343,61423.906,7770.8810.20ContractLIGRail / Truck
2026-04EIA row 6881 · preliminaryCOYOTE CREEK MINE3201028Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC123,99939.696,9560.9011.00ContractLIGTram/conveyor
2026-04EIA row 7106 · preliminaryRED HILLS MINE2200690Red Hills Generating Facility55076 · MS · MISSISSIPPI LIGNITE MINING260,722—Not published5,0850.5314.90ContractLIGTruck
2026-03EIA row 4416 · preliminaryFREEDOM MINE3200595Leland Olds2817 · ND · DAKOTA COAL356,67329.106,7871.039.00ContractLIGRail / Truck
2026-03EIA row 4645 · preliminaryFALKIRK MINE3200491Coal Creek6030 · ND · FALKIRK461,39629.646,3570.6010.50ContractLIGTram/conveyor
2026-03EIA row 4826 · preliminaryFREEDOM MINE3200595Antelope Valley6469 · ND · DAKOTA COAL(FREEDOM MINE)398,97224.676,7670.939.90ContractLIGRail / Truck
2026-03EIA row 5053 · preliminaryCOYOTE CREEK MINE3201028Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC177,15027.686,9520.9011.00ContractLIGTram/conveyor
2026-03EIA row 5276 · preliminaryRED HILLS MINE2200690Red Hills Generating Facility55076 · MS · MISSISSIPPI LIGNITE MINING195,794—Not published5,1150.6215.70ContractLIGTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 5 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Five Forks Mine1601499 · Natchitoches, Louisiana264,374———County sales or price not published1 eligible mines / 1 sales respondents
Red Hills Mine2200690 · Choctaw, Mississippi2,041,402———County sales or price not published1 eligible mines / 1 sales respondents
Falkirk Mine3200491 · Mclean, North Dakota7,400,184———County sales or price not published1 eligible mines / 1 sales respondents
Freedom Mine3200595 · Mercer, North Dakota11,860,169———County sales or price not published2 eligible mines / 2 sales respondents
Coyote Creek Mine3201028 · Mercer, North Dakota1,913,979———County sales or price not published2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

5 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.