ACTIVE / CONTROLLER PORTFOLIO

Kiewit Peter Sons' Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC02111

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Buckskin Mine4801200 · Active6/8 quarters reportedCampbell, WYSurface · MSHA: Coal (Bituminous)9,049,560384,697342274.3
Grindstone4105586 · Active6/8 quarters reportedPalo Pinto, TXSurface · MSHA: Crushed, Broken Limestone NEC0204,94526251.0

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

60

13 significant & substantial (S&S)

  1. 2025 Q17
  2. 2025 Q21
  3. 2025 Q317
  4. 2025 Q47
  5. 2026 Q17
  6. 2026 Q211
  7. 2026 Q310
  8. 2026 Q4 *0

Accident records

4

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q41
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

22,045.00

49 of 60 violations with amounts

  1. 2025 Q11,173
  2. 2025 Q21,320
  3. 2025 Q39,798
  4. 2025 Q41,547
  5. 2026 Q14,286
  6. 2026 Q23,921
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

325.25

11 inspections · 11 with hours

  1. 2025 Q18.25
  2. 2025 Q217.75
  3. 2025 Q389.50
  4. 2025 Q416.50
  5. 2026 Q183.50
  6. 2026 Q217.00
  7. 2026 Q392.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1701,173.000018.3
2025-Q2111,320.0000317.8
2025-Q31759,798.0020289.5
2025-Q4711,547.0010216.5
2026-Q1724,286.0010183.5
2026-Q21123,921.0000117.0
2026-Q3102—00192.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5034574
    Buckskin Mine · 4801200

    77.404(a)

  2. violation5033804
    Buckskin Mine · 4801200

    77.1104 · S&S

  3. violation5033803
    Buckskin Mine · 4801200

    77.410(b)

  4. violation5033802
    Buckskin Mine · 4801200

    77.1104 · S&S

  5. violation5033801
    Buckskin Mine · 4801200

    77.512

  6. violation5033800
    Buckskin Mine · 4801200

    77.1303(g)

  7. violation5033799
    Buckskin Mine · 4801200

    77.904

  8. violation5034569
    Buckskin Mine · 4801200

    77.807

  9. violation5033798
    Buckskin Mine · 4801200

    77.904

  10. violation5033797
    Buckskin Mine · 4801200

    77.1101(c)

  11. inspectionF010EF7
    Buckskin Mine · 4801200

    Regular Safety and Health Inspection · 92.8 on-site hours

  12. violation5173598
    Grindstone · 4105586

    56.14100(b) · $151.00 proposed

  13. violation5173597
    Grindstone · 4105586

    56.14107(a) · $209.00 proposed

  14. violation5173596
    Grindstone · 4105586

    56.4201(a)(1) · $209.00 proposed

  15. violation5173595
    Grindstone · 4105586

    56.12032 · $151.00 proposed

  16. violation5173594
    Grindstone · 4105586

    56.14207 · $465.00 proposed

  17. inspectionF03829A
    Grindstone · 4105586

    Regular Safety and Health Inspection · 17.0 on-site hours

  18. violation5173593
    Grindstone · 4105586

    56.20003(a) · S&S · $697.00 proposed

  19. violation5173592
    Grindstone · 4105586

    56.12030 · S&S · $697.00 proposed

  20. violation5173591
    Grindstone · 4105586

    56.12004 · $151.00 proposed

  21. violation5173590
    Grindstone · 4105586

    56.12008 · $465.00 proposed

  22. violation5173589
    Grindstone · 4105586

    56.4201(a)(1) · $209.00 proposed

  23. violation5173588
    Grindstone · 4105586

    46.7(a) · $517.00 proposed

  24. violation9732831
    Buckskin Mine · 4801200

    77.404(a) · S&S · $755.00 proposed

  25. violation9732830
    Buckskin Mine · 4801200

    77.1110 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS5,377,68479 rows · 7 receiving plants
HEAT CONTENT · BTU/LB8,358Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.33 / 4.99Separate averages over measured receipts
DELIVERED COST · USD/TON43.2538.2% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *1,422,5548,2620.284.9135.88
2025-Q41,405,4878,2290.405.3645.41
2026-Q11,226,8788,4280.334.9947.75
2026-Q2999,2138,5210.354.8045.83
2026-Q3 *323,5528,5710.244.2748.60
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-03EIA row 4538 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN170,274—Not published8,4600.365.20ContractSUBRail
2026-03EIA row 4812 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO127,70650.028,4580.364.80ContractSUBRail
2026-02EIA row 2065 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN31,035—Not published8,2700.285.30ContractSUBRail
2026-02EIA row 2066 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN15,267—Not published8,2700.375.80ContractSUBRail
2026-02EIA row 2213 · preliminaryBUCKSKIN MINE4801200Muscatine Plant #11167 · IA · BUCKSKIN14,60836.808,2060.346.00SpotSUBRail
2026-02EIA row 2569 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN61,149—Not published8,3950.315.00ContractSUBRail
2026-02EIA row 2570 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN139,126—Not published8,3550.274.80ContractSUBRail
2026-02EIA row 2879 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO47,68250.118,3250.264.50ContractSUBRail
2026-02EIA row 2885 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO63,92549.678,4220.304.90ContractSUBRail
2026-01EIA row 49 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN46,658—Not published8,3150.355.00ContractSUBRail
2026-01EIA row 50 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN46,404—Not published8,5100.344.90ContractSUBRail
2026-01EIA row 595 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN123,787—Not published8,4800.324.70ContractSUBRail
2026-01EIA row 596 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN29,685—Not published8,4700.254.60ContractSUBRail
2026-01EIA row 907 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO16,02748.118,3900.385.00ContractSUBRail
2026-01EIA row 908 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO143,07550.848,5110.354.90ContractSUBRail
2025-12EIA row 33846 · finalBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN31,162—Not published8,2950.375.40ContractSUBRail
2025-12EIA row 33849 · finalBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN15,269—Not published8,3850.344.80ContractSUBRail
2025-12EIA row 34249 · finalBUCKSKIN MINE4801200North Omaha2291 · NE · BUCKSKIN47,01623.728,3400.344.90ContractSUBRail
2025-12EIA row 34533 · finalBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN62,075—Not published8,3050.385.40ContractSUBRail
2025-12EIA row 34535 · finalBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN123,760—Not published8,3300.385.60ContractSUBRail
2025-12EIA row 34928 · finalBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO158,86849.328,3940.375.10ContractSUBRail
2025-12EIA row 34929 · finalBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO94,48949.868,3240.354.90ContractSUBRail
2025-12EIA row 34933 · finalBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO15,86150.058,6000.356.00ContractSUBRail
2025-11EIA row 30862 · finalBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN30,543—Not published8,3600.345.00ContractSUBRail
2025-11EIA row 30865 · finalBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN76,582—Not published8,3000.325.80ContractSUBRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON13.96Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS6,752,058Allocated from published county sales
ESTIMATED COAL REVENUE · USD94,258,733Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Buckskin Mine4801200 · Campbell, Wyoming6,752,57013.966,752,05894,258,733County allocation estimate3.97% of eligible county production11 eligible mines / 11 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.