← Jerry Todd Tackett

Jerry Todd Tackett safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Maintenance of incombustible content of rock dust.

    violationRecord 8252409
    AUS #1 · 1519847

    30 CFR 75.403 · $151.00 proposed penalty

  2. Transportation of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 8252408
    AUS #1 · 1519847

    30 CFR 75.1106-2(a)(3) · $151.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 8252407
    AUS #1 · 1519847

    30 CFR 75.1731(a) · $151.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 8252406
    AUS #1 · 1519847

    30 CFR 75.1731(a) · $151.00 proposed penalty

  5. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 8252405
    AUS #1 · 1519847

    30 CFR 75.1103-8(c) · $151.00 proposed penalty

  6. Automatic fire sensors.

    violationRecord 8252404
    AUS #1 · 1519847

    30 CFR 75.1103-1 · $151.00 proposed penalty

  7. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 8252403
    AUS #1 · 1519847

    30 CFR 75.1107-4(a)(2)(i) · $151.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 8252402
    AUS #1 · 1519847

    30 CFR 75.503 · $151.00 proposed penalty

  9. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9880100
    AUS #1 · 1519847

    30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty

  10. Lighting fixtures; requirements.

    violationRecord 8252401
    AUS #1 · 1519847

    30 CFR 75.1719-2(e) · $151.00 proposed penalty

  11. Methane monitors.

    violationRecord 9880099
    AUS #1 · 1519847

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 9880098
    AUS #1 · 1519847

    30 CFR 75.503 · $151.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 9880097
    AUS #1 · 1519847

    30 CFR 75.604(b) · Significant and substantial (S&S) · $151.00 proposed penalty

  14. Power wires and cables; insulation and protection.

    violationRecord 9880096
    AUS #1 · 1519847

    30 CFR 75.517 · Significant and substantial (S&S) · $151.00 proposed penalty

  15. [Reserved]

    violationRecord 8281290
    AUS #1 · 1519847

    30 CFR 70.101(b) · Significant and substantial (S&S) · $151.00 proposed penalty

  16. Grounding offtrack direct-current machines and the enclosures of related detached components.

    violationRecord 9880093
    AUS #1 · 1519847

    30 CFR 75.703 · $151.00 proposed penalty

  17. Grounding offtrack direct-current machines and the enclosures of related detached components.

    violationRecord 9880092
    AUS #1 · 1519847

    30 CFR 75.703 · $151.00 proposed penalty

  18. Disconnecting devices.

    violationRecord 9880091
    AUS #1 · 1519847

    30 CFR 75.903 · $151.00 proposed penalty

  19. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 9880090
    AUS #1 · 1519847

    30 CFR 75.601-1 · $151.00 proposed penalty

  20. Deenergization of self-propelled electric face equipment installation requirements.

    violationRecord 9880089
    AUS #1 · 1519847

    30 CFR 75.523-1(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9880088
    AUS #1 · 1519847

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 9880087
    AUS #1 · 1519847

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  23. Warning devices.

    violationRecord 9880086
    AUS #1 · 1519847

    30 CFR 75.208 · $151.00 proposed penalty

  24. Respirable dust samples; report to operator; posting.

    violationRecord 8281287
    AUS #1 · 1519847

    30 CFR 70.211(c) · $151.00 proposed penalty

  25. Quarterly sampling; designated areas.

    violationRecord 8281286
    AUS #1 · 1519847

    30 CFR 70.209(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.