Edward A Asbury safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Machinery and equipment; operation and maintenance.
Skyway III Mine · 460948030 CFR 77.404(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Loading and haulage equipment; installations.
Skyway III Mine · 460948030 CFR 77.1605(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Skyway III Mine · 460948030 CFR 77.1605(k) · $151.00 proposed penalty
Regular Safety and Health Inspection
Superior Cleaning Plant · 460330345.8 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Superior Cleaning Plant · 460330330 CFR 77.1606(c) · $151.00 proposed penalty
Accumulation of combustible materials.
No 1 · 460736630 CFR 75.400 · $313.00 proposed penalty
Machinery and equipment; operation and maintenance.
No 1 · 460736630 CFR 75.1725(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Mechanical equipment guards.
No 1 · 460736630 CFR 75.1722(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Escapeway maps.
No 1 · 460736630 CFR 75.1505(b) · $549.00 proposed penalty
Roof control plan.
Sewell Mine B · 460626530 CFR 75.220(a)(1) · $151.00 proposed penalty
Map of electrical system.
No 1 · 460736630 CFR 75.508 · $288.00 proposed penalty
Roof control plan.
No 1 · 460736630 CFR 75.220(a)(1) · $1,219.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $549.00 proposed penalty
Roof control plan.
No 1 · 460736630 CFR 75.220(a)(1) · $883.00 proposed penalty
Cable fittings; suitability.
Sewell Mine B · 460626530 CFR 75.515 · $2,936.00 proposed penalty
Escapeways; bituminous and lignite mines.
Sewell Mine B · 460626530 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Permanent splicing of trailing cables.
Sewell Mine B · 460626530 CFR 75.604(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Permanent splicing of trailing cables.
Sewell Mine B · 460626530 CFR 75.604(b) · $2,936.00 proposed penalty
Mine ventilation plan; submission and approval.
Sewell Mine B · 460626530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $549.00 proposed penalty
Spot Inspection
Newhall Surface Mine No. 3 · 46096241.5 on-site hours reported
Cable fittings; suitability.
Sewell Mine B · 460626530 CFR 77.505 · $2,936.00 proposed penalty
Escapeway maps.
Sewell Mine B · 460626530 CFR 75.1505(a) · $151.00 proposed penalty
Accumulations of combustible materials.
Sewell Mine B · 460626530 CFR 77.1104 · $177.00 proposed penalty
Requirement for container labels.
Sewell Mine B · 460626530 CFR 47.41(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
No 1 · 460736630 CFR 75.512 · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.