Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ventilation controls.
DEEP MINE 44 · 440730830 CFR 75.333(d)(3) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Coon Cedar Grove Mine · 460883730 CFR 77.1606(c) · $151.00 proposed penalty
Roof control plan.
ROAD FORK #52 MINE · 460952230 CFR 75.220(a)(1) · $755.00 proposed penalty
Permanent splicing of trailing cables.
ROAD FORK #52 MINE · 460952230 CFR 75.604(b) · $755.00 proposed penalty
Drill dust control at underground areas of underground mines.
ROAD FORK #52 MINE · 460952230 CFR 72.630(b) · $697.00 proposed penalty
Permissible electric face equipment; maintenance.
ROAD FORK #52 MINE · 460952230 CFR 75.503 · $267.00 proposed penalty
Accumulation of combustible materials.
ROAD FORK #52 MINE · 460952230 CFR 75.400 · $755.00 proposed penalty
Inspection of fire suppression devices.
ROAD FORK #52 MINE · 460952230 CFR 75.1107-16(b) · $165.00 proposed penalty
Roof control plan.
ROAD FORK #52 MINE · 460952230 CFR 75.220(a)(1) · $755.00 proposed penalty
Inspection of fire suppression devices.
ROAD FORK #52 MINE · 460952230 CFR 75.1107-16(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
ROAD FORK #52 MINE · 460952230 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
ROAD FORK #52 MINE · 460952230 CFR 75.1106-3(a)(2) · $336.00 proposed penalty
Preshift examination at fixed intervals.
Lynn Branch No. 2 Mine · 460957530 CFR 75.360(f) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.512 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.503 · $245.00 proposed penalty
Permissible electric face equipment; maintenance.
Cedar Grove Mine No 3 · 460961130 CFR 75.503 · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Cedar Grove Mine No 3 · 460961130 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty
Regular Safety and Health Inspection
88 Strip · 4407163233.3 on-site hours reported
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 4.5 on-site hours reported
Impoundment Spot Inspection
Mammoth Coal Processing Pl & Riv Tipple · 460331710.5 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 7.0 on-site hours reported
Mine ventilation plan; submission and approval.
DEEP MINE 41 · 440722330 CFR 75.370(a)(1) · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
DEEP MINE 44 · 440730830 CFR 72.630(b) · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Jerry Fork Eagle · 460878730 CFR 75.1731(a) · $504.00 proposed penalty
Protection from falls of roof, face and ribs.
Jerry Fork Eagle · 460878730 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.