Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Belt air course ventilation.
ROAD FORK #52 MINE · 460952230 CFR 75.350(a)(2) · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $818.00 proposed penalty
Other
Ewing Fork No. 1 Surface Mine · 4609026Injuries due to natural causes
Accident narrative
The employee reported chest pains to EE's co-worker and subsequentially lost consciousness. EMTs treated the employee who regained consciousness. The employee was transported to the hospital where EE was diagnosed with arrhythmia and anxiety. EE was treated and released and returned to work on EE's next regularly scheduled shift. This was a medical event, not work related.
Spot Inspection
Ewing Fork No. 1 Surface Mine · 460902611.8 on-site hours reported
Protection from falls of roof, face and ribs.
ROAD FORK #52 MINE · 460952230 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Quantity and location of firefighting equipment.
ROAD FORK #52 MINE · 460952230 CFR 75.1100-2(f) · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Rum Creek Preparation Plant · 46050863.8 on-site hours reported
Installation of water sprinkler systems; requirements.
DEEP MINE 41 · 440722330 CFR 75.1101-7(c) · $151.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
DEEP MINE 41 · 440722330 CFR 75.1107-7(b) · $151.00 proposed penalty
Insulating mats at power switches.
Rum Creek Preparation Plant · 460508630 CFR 77.513 · $151.00 proposed penalty
Escape and evacuation; plan.
Rum Creek Preparation Plant · 460508630 CFR 77.1101(c) · $336.00 proposed penalty
Travelways at surface installations.
Rum Creek Preparation Plant · 460508630 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Travelways at surface installations.
Rum Creek Preparation Plant · 460508630 CFR 77.205(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Examination and maintenance of firefighting equipment.
Rum Creek Preparation Plant · 460508630 CFR 77.1110 · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Rum Creek Preparation Plant · 460508630 CFR 77.502 · $151.00 proposed penalty
Permanent splicing of trailing cables.
Jerry Fork Eagle · 460878730 CFR 75.604(b) · $504.00 proposed penalty
Accumulation of combustible materials.
Jerry Fork Eagle · 460878730 CFR 75.400 · $432.00 proposed penalty
Other safeguards.
Kingston No. 2 · 460893230 CFR 75.1403 · $504.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Republic Energy · 460905430 CFR 77.1606(c) · $398.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
ROAD FORK #52 MINE · 460952230 CFR 75.1107-1(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $755.00 proposed penalty
Accumulation of combustible materials.
ROAD FORK #52 MINE · 460952230 CFR 75.400 · $697.00 proposed penalty
Machinery and equipment; operation and maintenance.
ROAD FORK #52 MINE · 460952230 CFR 75.1725(a) · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Roof control plan.
ROAD FORK #52 MINE · 460952230 CFR 75.220(a)(1) · $336.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.