Alliance Resource Partners LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing and maintenance.
RIVER VIEW MINE · 151937430 CFR 75.512 · $226.00 proposed penalty
Criteria—Belt conveyors.
TUNNEL RIDGE MINE · 460886430 CFR 75.1403-5(g) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(b) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(b) · $226.00 proposed penalty
Hoisting
RIVER VIEW MINE · 1519374Accident only
Accident narrative
Air compressor was down on the P3 shaft. This was not an accident. A 7000-1 form is being filled out to terminate citation 9760488.
Spot Inspections
MINE NO. 1 · 1103203103(i) · 6.8 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
MINE NO. 1 · 11032034.5 on-site hours reported
Regular Safety and Health Inspection
River View Facilities · 150317875.5 on-site hours reported
Roof Control Technical Investigation
Mountain View Mine · 46090288.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Gibson South · 120238830 CFR 77.502 · Significant and substantial (S&S) · $432.00 proposed penalty
Mechanical equipment guards.
River View Facilities · 150317830 CFR 77.400(a) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
River View Facilities · 150317830 CFR 77.1110 · $151.00 proposed penalty
Loading and haulage equipment; operation.
River View Facilities · 150317830 CFR 77.1607(n) · $151.00 proposed penalty
Travelways at surface installations.
River View Facilities · 150317830 CFR 77.205(b) · $151.00 proposed penalty
Accumulation of combustible materials.
CARDINAL · 151721630 CFR 75.400 · $366.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
CARDINAL · 151721630 CFR 75.1910(j) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty
Electric equipment; examination, testing and maintenance.
CARDINAL · 151721630 CFR 75.512 · $177.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
CARDINAL · 151721630 CFR 75.363(a) · $818.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Permissible electric face equipment; maintenance.
CARDINAL · 151721630 CFR 75.503 · $151.00 proposed penalty
Inspection of fire suppression devices.
CARDINAL · 151721630 CFR 75.1107-16(b) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.