Title 30
Mineral Resources
5,954 sections · 206 parts · 6 chapterseCFR snapshot through 2026-08-19
Part 7
TESTING BY APPLICANT OR THIRD PARTY
1–100 of 103 sections
- § 7.1Purpose and scope.
- § 7.2Definitions.
- § 7.3Application procedures and requirements.
- § 7.4Product testing.
- § 7.5Issuance of approval.
- § 7.6Approval marking and distribution record.
- § 7.7Quality assurance.
- § 7.8Post-approval product audit.
- § 7.9Revocation.
- § 7.10MSHA acceptance of equivalent non-MSHA product safety standards.
- § 7.21Purpose and effective date.
- § 7.22Definitions.
- § 7.23Application requirements.
- § 7.24Technical requirements.
- § 7.25Critical characteristics.
- § 7.26Flame test apparatus.
- § 7.27Test for flame resistance of brattice cloth.
- § 7.28Test for flame resistance of rigid ventilation tubing.
- § 7.29Approval marking.
- § 7.30Post-approval product audit.
- § 7.31New technology.
- § 7.41Purpose and effective date.
- § 7.42Definitions.
- § 7.43Application requirements.
- § 7.44Technical requirements.
- § 7.45Critical characteristics
- § 7.46Impact test.
- § 7.47Deflection temperature test.
- § 7.48Acid resistance test.
- § 7.49Approval marking.
- § 7.50Post-approval product audit.
- § 7.51Approval checklist.
- § 7.52New technology.
- § 7.61Purpose and effective date.
- § 7.62Definitions.
- § 7.63Application requirements.
- § 7.64Technical requirements.
- § 7.65Critical characteristics.
- § 7.66Output energy test.
- § 7.67Construction test.
- § 7.68Firing line terminals test.
- § 7.69Approval marking.
- § 7.70Post-approval product audit.
- § 7.71Approval checklist.
- § 7.72New technology.
- § 7.81Purpose and effective date.
- § 7.82Definitions.
- § 7.83Application requirements.
- § 7.84Technical requirements.
- § 7.85Critical characteristics.
- § 7.86Test equipment and specifications.
- § 7.87Test to determine the maximum fuel-air ratio.
- § 7.88Test to determine the gaseous ventilation rate.
- § 7.89Test to determine the particulate index.
- § 7.90Approval marking.
- § 7.91Post-approval product audit.
- § 7.92New technology.
- § 7.95Purpose and effective date.
- § 7.96Definitions.
- § 7.97Application requirements.
- § 7.98Technical requirements.
- § 7.99Critical characteristics.
- § 7.100Explosion tests.
- § 7.101Surface temperature tests.
- § 7.102Exhaust gas cooling efficiency test.
- § 7.103Safety system control test.
- § 7.104Internal static pressure test.
- § 7.105Approval marking.
- § 7.106Post-approval product audit.
- § 7.107New technology.
- § 7.108Power package checklist.
- § 7.301Purpose and effective date.
- § 7.302Definitions.
- § 7.303Application requirements.
- § 7.304Technical requirements.
- § 7.305Critical characteristics.
- § 7.306Explosion tests.
- § 7.307Static pressure test.
- § 7.308Lockwasher equivalency test.
- § 7.309Approval marking.
- § 7.310Post-approval product audit.
- § 7.311Approval checklist.
- § 7.401Purpose and effective date.
- § 7.402Definitions.
- § 7.403Application requirements.
- § 7.404Technical requirements.
- § 7.405Critical characteristics.
- § 7.406Flame test apparatus.
- § 7.407Test for flame resistance of electric cables and cable splices.
- § 7.408Test for flame resistance of signaling cables.
- § 7.409Approval marking.
- § 7.410Post-approval product audit.
- § 7.411New technology.
- § 7.501Purpose and scope.
- § 7.502Definitions.
- § 7.503Application requirements.
- § 7.504Refuge alternatives and components; general requirements.
- § 7.505Structural components.
- § 7.506Breathable air components.
- § 7.507Air-monitoring components.