Title 30
Mineral Resources
5,954 sections · 206 parts · 6 chapterseCFR snapshot through 2026-08-19
Part 250
OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
1–100 of 486 sections
- § 250.101Authority and applicability.
- § 250.102What does this part do?
- § 250.103Where can I find more information about the requirements in this part?
- § 250.104How may I appeal a decision made under BSEE regulations?
- § 250.105Definitions.
- § 250.106What standards will the Director use to regulate lease operations?
- § 250.107What must I do to protect health, safety, property, and the environment?
- § 250.108What requirements must I follow for cranes and other material-handling equipment?
- § 250.109What documents must I prepare and maintain related to welding?
- § 250.110What must I include in my welding plan?
- § 250.111Who oversees operations under my welding plan?
- § 250.112What standards must my welding equipment meet?
- § 250.113What procedures must I follow when welding?
- § 250.114How must I install, maintain, and operate electrical equipment?
- § 250.115What are the procedures for, and effects of, incorporation of documents by reference in this part?
- § 250.116-250.117[Reserved]
- § 250.118Will BSEE approve gas injection?
- § 250.119[Reserved]
- § 250.120How does injecting, storing, or treating gas affect my royalty payments?
- § 250.121What happens when the reservoir contains both original gas in place and injected gas?
- § 250.122What effect does subsurface storage have on the lease term?
- § 250.123[Reserved]
- § 250.124Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
- § 250.125Service fees.
- § 250.126Electronic payment instructions.
- § 250.130Why does BSEE conduct inspections?
- § 250.131Will BSEE notify me before conducting an inspection?
- § 250.132What must I do when BSEE conducts an inspection?
- § 250.133Will BSEE reimburse me for my expenses related to inspections?
- § 250.135What will BSEE do if my operating performance is unacceptable?
- § 250.136How will BSEE determine if my operating performance is unacceptable?
- § 250.140When will I receive an oral approval?
- § 250.141May I ever use alternate procedures or equipment?
- § 250.142How do I receive approval for departures?
- § 250.143-250.144[Reserved]
- § 250.145How do I designate an agent or a local agent?
- § 250.146Who is responsible for fulfilling leasehold obligations?
- § 250.150How do I name facilities and wells in the Gulf of America Region?
- § 250.151How do I name facilities in the Pacific Region?
- § 250.152How do I name facilities in the Alaska Region?
- § 250.153Do I have to rename an existing facility or well?
- § 250.154What identification signs must I display?
- § 250.160-250.167[Reserved]
- § 250.168May operations or production be suspended?
- § 250.169What effect does suspension have on my lease?
- § 250.170How long does a suspension last?
- § 250.171How do I request a suspension?
- § 250.172When may the Regional Supervisor grant or direct an SOO or SOP?
- § 250.173When may the Regional Supervisor direct an SOO or SOP?
- § 250.174When may the Regional Supervisor grant or direct an SOP?
- § 250.175When may the Regional Supervisor grant an SOO?
- § 250.176Does a suspension affect my royalty payment?
- § 250.177What additional requirements may the Regional Supervisor order for a suspension?
- § 250.180What am I required to do to keep my lease term in effect?
- § 250.181-250.185[Reserved]
- § 250.186What reporting information and report forms must I submit?
- § 250.187What are BSEE's incident reporting requirements?
- § 250.188What incidents must I report to BSEE and when must I report them?
- § 250.189Reporting requirements for incidents requiring immediate notification.
- § 250.190Reporting requirements for incidents requiring written notification.
- § 250.191How does BSEE conduct incident investigations?
- § 250.192What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
- § 250.193Reports and investigations of possible violations.
- § 250.194How must I protect archaeological resources?
- § 250.195What notification does BSEE require on the production status of wells?
- § 250.196Reimbursements for reproduction and processing costs.
- § 250.197Data and information to be made available to the public or for limited inspection.
- § 250.198Documents incorporated by reference.
- § 250.199Paperwork Reduction Act statements—information collection.
- § 250.200Definitions.
- § 250.201What plans and information must I submit before I conduct any activities on my lease or unit?
- § 250.202How must I protect the rights of the Federal government?
- § 250.203Are there special requirements if my well affects an adjacent property?
- § 250.204Requirements for high pressure high temperature (HPHT) barrier equipment.
- § 250.205[Reserved]
- § 250.206What equipment does BSEE consider to be a barrier?
- § 250.207How must barrier systems be used?
- § 250.208How must I conduct activities under an approved EP, DPP, or DOCD?
- § 250.209What must I do to conduct activities under the approved EP, DPP, or DOCD?
- § 250.210Do I have to conduct post-approval monitoring?
- § 250.211What are my new or unusual technology failure reporting requirements?
- § 250.212-250.219[Reserved]
- § 250.220What is the DWOP process?
- § 250.221When must I use the DWOP process?
- § 250.222-250.224[Reserved]
- § 250.225What are the types of Conceptual Plans that I must submit?
- § 250.226When and how must I submit each applicable Conceptual Plan?
- § 250.227What must the Project Conceptual Plan contain?
- § 250.228What must the New or Unusual Technology Conceptual Plan contain?
- § 250.229What must the New or Unusual Technology Barrier Equipment Conceptual Plan include?
- § 250.230When are you required to submit an I3P Report?
- § 250.231What are your requirements for the Independent Third Party (I3P) nomination?
- § 250.232What are the I3P review requirements for Conceptual Plan reviews?
- § 250.233General requirements for any I3P Report.
- § 250.234[Reserved]
- § 250.235When and how must I submit the DWOP?
- § 250.236What information must I submit with the DWOP?
- § 250.237What general information must my DWOP include?
- § 250.238What well or completions information must my DWOP include?
- § 250.239What structural information must my DWOP include?