Title 30
Mineral Resources
5,954 sections · 206 parts · 6 chapterseCFR snapshot through 2026-08-19
Part 250
OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
101–200 of 486 sections
- § 250.240What production safety system information must my DWOP include?
- § 250.241What subsea systems and pipeline information must my DWOP include?
- § 250.242What New or Unusual Technology information must my DWOP include?
- § 250.243-250.244[Reserved]
- § 250.245May I combine the Project Conceptual Plan and the DWOP?
- § 250.246When must I revise my DWOP?
- § 250.247When must I supplement my DWOP?
- § 250.248What information must I include in my Supplemental DWOP?
- § 250.300Pollution prevention.
- § 250.301Inspection of facilities.
- § 250.400General requirements.
- § 250.401-250.403[Reserved]
- § 250.404What are the requirements for the crown block?
- § 250.405What are the safety requirements for diesel engines used on a drilling rig?
- § 250.406[Reserved]
- § 250.407What tests must I conduct to determine reservoir characteristics?
- § 250.408May I use alternative procedures or equipment during drilling operations?
- § 250.409May I obtain departures from these drilling requirements?
- § 250.410How do I obtain approval to drill a well?
- § 250.411What information must I submit with my application?
- § 250.412What requirements must the location plat meet?
- § 250.413What must my description of well drilling design criteria address?
- § 250.414What must my drilling prognosis include?
- § 250.415What must my casing and cementing programs include?
- § 250.416What must I include in the diverter description?
- § 250.417[Reserved]
- § 250.418What additional information must I submit with my APD?
- § 250.420What well casing and cementing requirements must I meet?
- § 250.421What are the casing and cementing requirements by type of casing string?
- § 250.422When may I resume drilling after cementing?
- § 250.423What are the requirements for casing and liner installation?
- § 250.424-250.426[Reserved]
- § 250.427What are the requirements for pressure integrity tests?
- § 250.428What must I do in certain cementing and casing situations?
- § 250.430When must I install a diverter system?
- § 250.431What are the diverter design and installation requirements?
- § 250.432How do I obtain a departure to diverter design and installation requirements?
- § 250.433What are the diverter actuation and testing requirements?
- § 250.434What are the recordkeeping requirements for diverter actuations and tests?
- § 250.440-250.451[Reserved]
- § 250.452What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?
- § 250.455What are the general requirements for a drilling fluid program?
- § 250.456What safe practices must the drilling fluid program follow?
- § 250.457What equipment is required to monitor drilling fluids?
- § 250.458What quantities of drilling fluids are required?
- § 250.459What are the safety requirements for drilling fluid-handling areas?
- § 250.460What are the requirements for conducting a well test?
- § 250.461What are the requirements for directional and inclination surveys?
- § 250.462What are the source control, containment, and collocated equipment requirements?
- § 250.463Who establishes field drilling rules?
- § 250.465When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to BSEE?
- § 250.466-250.469[Reserved]
- § 250.470What additional information must I submit with my APD for Arctic OCS exploratory drilling operations?
- § 250.471What are the requirements for Arctic OCS source control and containment?
- § 250.472What are the relief rig requirements for the Arctic OCS?
- § 250.473What must I do to protect health, safety, property, and the environment while operating on the Arctic OCS?
- § 250.490Hydrogen sulfide.
- § 250.500General requirements.
- § 250.501Definition.
- § 250.502[Reserved]
- § 250.503Emergency shutdown system.
- § 250.504Hydrogen sulfide.
- § 250.505Subsea completions.
- § 250.506-250.508[Reserved]
- § 250.509Well-completion structures on fixed platforms.
- § 250.510Diesel engine air intakes.
- § 250.511Traveling-block safety device.
- § 250.512Field well-completion rules.
- § 250.513Approval and reporting of well-completion operations.
- § 250.514Well-control fluids, equipment, and operations.
- § 250.515-250.517[Reserved]
- § 250.518Tubing and wellhead equipment.
- § 250.519What are the requirements for casing pressure management?
- § 250.520How often do I have to monitor for casing pressure?
- § 250.521When do I have to perform a casing diagnostic test?
- § 250.522How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
- § 250.523When do I have to repeat casing diagnostic testing?
- § 250.524How long do I keep records of casing pressure and diagnostic tests?
- § 250.525When am I required to take action from my casing diagnostic test?
- § 250.526What do I submit if my casing diagnostic test requires action?
- § 250.527What must I include in my notification of corrective action?
- § 250.528What must I include in my casing pressure request?
- § 250.529What are the terms of my casing pressure request?
- § 250.530What if my casing pressure request is denied?
- § 250.531When does my casing pressure request approval become invalid?
- § 250.600General requirements.
- § 250.601Definitions.
- § 250.602[Reserved]
- § 250.603Emergency shutdown system.
- § 250.604Hydrogen sulfide.
- § 250.605Subsea workovers.
- § 250.606-250.608[Reserved]
- § 250.609Well-workover structures on fixed platforms.
- § 250.610Diesel engine air intakes.
- § 250.611Traveling-block safety device.
- § 250.612Field well-workover rules.
- § 250.613Approval and reporting for well-workover operations.
- § 250.614Well-control fluids, equipment, and operations.
- § 250.615-250.618[Reserved]
- § 250.619Tubing and wellhead equipment.