ALL STATUSES / OPERATOR PORTFOLIO

Westmoreland Rosebud Mining LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDP24656

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Rosebud Mine & Crusher/Conveyor2401747 · Active6/8 quarters reportedRosebud, MTSurface · MSHA: Coal (Bituminous)8,132,729803,142338493.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

33

6 significant & substantial (S&S)

  1. 2025 Q110
  2. 2025 Q20
  3. 2025 Q310
  4. 2025 Q46
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q37
  8. 2026 Q4 *0

Accident records

8

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q14
  6. 2026 Q21
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

11,121.00

26 of 33 violations with amounts

  1. 2025 Q12,701
  2. 2025 Q2—
  3. 2025 Q33,213
  4. 2025 Q45,207
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

493.00

6 inspections · 6 with hours

  1. 2025 Q1116.00
  2. 2025 Q2—
  3. 2025 Q3140.00
  4. 2025 Q4109.50
  5. 2026 Q1—
  6. 2026 Q20.00
  7. 2026 Q3127.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11012,701.00201116.0
2025-Q200—000—
2025-Q31023,213.00001140.0
2025-Q4635,207.00002109.5
2026-Q100—400—
2026-Q200—1010.0
2026-Q370—101127.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5038874
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.1605(b) · $151.00 proposed

  2. violation5038873
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.205(b) · $226.00 proposed

  3. violation5038872
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.400(d) · S&S · $504.00 proposed

  4. violation5038871
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.404(a) · $151.00 proposed

  5. violation9732349
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.502 · $226.00 proposed

  6. violation9732348
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.800 · $226.00 proposed

  7. violation9731177
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.502 · $151.00 proposed

  8. violation9731176
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.904 · $226.00 proposed

  9. inspectionF0030DC
    Rosebud Mine & Crusher/Conveyor · 2401747

    Regular Safety and Health Inspection · 140.0 on-site hours

  10. violation9731947
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.1104 · $226.00 proposed

  11. accident220250710019
    Rosebud Mine & Crusher/Conveyor · 2401747

    HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    An employee was using the spanner wrench to change a disk on a handheld grinder. When the nut came loose, employee felt pain in right hand. Employee reported it at the beginning of the next shift and was taken to the clinic. EE was not released to full duty.

  12. violation9732295
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.404(a) · $226.00 proposed

  13. violation9731505
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.202 · $226.00 proposed

  14. violation9732294
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.410(c) · $226.00 proposed

  15. violation9732293
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.502 · $226.00 proposed

  16. violation9732292
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.502 · $226.00 proposed

  17. violation9732291
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.502 · $151.00 proposed

  18. violation9731944
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.404(a) · $151.00 proposed

  19. violation9731943
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.204 · S&S · $755.00 proposed

  20. inspection6472807
    Rosebud Mine & Crusher/Conveyor · 2401747

    Regular Safety and Health Inspection · 116.0 on-site hours

  21. violation9731504
    Rosebud Mine & Crusher/Conveyor · 2401747

    77.404(a) · $288.00 proposed

  22. accident220250420002
    Rosebud Mine & Crusher/Conveyor · 2401747

    STRIKING OR BUMPING · DYS AWY FRM WRK & RESTRCTD ACT

    Accident narrative

    Ee was unhooking the trail cable from dragline. EE was following to make sure it didn't get snagged on anything. EE's eyes were on the cable while passing behind the shoe, EE walked into the shoelace counterweight. EE was evaluated on-site and sent to the clinic for precautionary reasons. Upon further evaluation the employee was not released to return to work.

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS5,141,33612 rows · 1 receiving plants
HEAT CONTENT · BTU/LB8,673Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.68 / 9.11Separate averages over measured receipts
DELIVERED COST · USD/TON—0.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *1,100,1208,6700.689.30—
2025-Q41,549,7128,6960.668.99—
2026-Q11,138,6058,6640.719.08—
2026-Q2796,8688,6290.689.06—
2026-Q3 *556,0318,6950.669.20—
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12085 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY556,031—Not published8,6950.669.20ContractSUBTram/conveyor
2026-06EIA row 10178 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY302,824—Not published8,6450.688.80ContractSUBTram/conveyor
2026-05EIA row 8327 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY195,716—Not published8,5950.709.70ContractSUBTram/conveyor
2026-04EIA row 6523 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY298,328—Not published8,6350.688.90ContractSUBTram/conveyor
2026-03EIA row 4696 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY351,840—Not published8,6250.739.30ContractSUBTram/conveyor
2026-02EIA row 2758 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY328,976—Not published8,6700.738.80ContractSUBTram/conveyor
2026-01EIA row 778 · preliminaryROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY457,789—Not published8,6900.689.10ContractSUBTram/conveyor
2025-12EIA row 34820 · finalROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY378,236—Not published8,6600.709.00ContractSUBTram/conveyor
2025-11EIA row 31826 · finalROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY567,669—Not published8,6900.649.30ContractSUBTram/conveyor
2025-10EIA row 28880 · finalROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY603,807—Not published8,7250.668.70ContractSUBTram/conveyor
2025-09EIA row 25811 · finalROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY474,943—Not published8,6700.719.30ContractSUBTram/conveyor
2025-08EIA row 22682 · finalROSEBUD MINE&CRUSHER/CONVEYOR2401747Colstrip6076 · MT · WESTERN ENERGY625,177—Not published8,6700.669.30ContractSUBTram/conveyor
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Rosebud Mine & Crusher/Conveyo2401747 · Rosebud, Montana5,978,039———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.