ACTIVE / OPERATOR PORTFOLIO

Westmoreland Absaloka Mining LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0079503

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Absaloka Mine2400910 · Active6/8 quarters reportedBig Horn, MTSurface · MSHA: Coal (Bituminous)155,80473,769181134.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

18

1 significant & substantial (S&S)

  1. 2025 Q19
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q12
  6. 2026 Q25
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

3,452.00

18 of 18 violations with amounts

  1. 2025 Q11,963
  2. 2025 Q2—
  3. 2025 Q3328
  4. 2025 Q4—
  5. 2026 Q1302
  6. 2026 Q2859
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

134.25

4 inspections · 4 with hours

  1. 2025 Q142.00
  2. 2025 Q2—
  3. 2025 Q333.50
  4. 2025 Q4—
  5. 2026 Q134.25
  6. 2026 Q224.50
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1911,963.0000142.0
2025-Q200—000—
2025-Q320328.0000133.5
2025-Q400—000—
2026-Q120302.0000134.3
2026-Q250859.0010124.5
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5033788
    Absaloka Mine · 2400910

    77.502-2 · $151.00 proposed

  2. violation5033787
    Absaloka Mine · 2400910

    77.1605(b) · $177.00 proposed

  3. violation5033786
    Absaloka Mine · 2400910

    77.1110 · $177.00 proposed

  4. violation5033785
    Absaloka Mine · 2400910

    77.1110 · $177.00 proposed

  5. violation5033784
    Absaloka Mine · 2400910

    77.1607(n) · $177.00 proposed

  6. inspectionF010EEB
    Absaloka Mine · 2400910

    Regular Safety and Health Inspection · 24.5 on-site hours

  7. accident220261730050
    Absaloka Mine · 2400910

    EXPLODING VESSELS UNDER PRESSURE · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Customer asked Employee to swap hose fittings on a mine-owned pump. After EE finished, Employee noticed a cam hose fitting was leaking. Employee used a tool to tap the ear of the cam hose. The leak stopped, but as EE walked away, the cam hose fitting ruptured. Employee was struck by either the hose or cam fitting, causing a laceration to EEs face and bruises to EEs torso and knee.

  8. violation9732612
    Absaloka Mine · 2400910

    77.502 · $151.00 proposed

  9. violation9732611
    Absaloka Mine · 2400910

    77.410(c) · $151.00 proposed

  10. inspectionF009D9E
    Absaloka Mine · 2400910

    Regular Safety and Health Inspection · 34.3 on-site hours

  11. violation9731979
    Absaloka Mine · 2400910

    47.41(a) · $151.00 proposed

  12. violation9732335
    Absaloka Mine · 2400910

    77.513 · $177.00 proposed

  13. inspection6472818
    Absaloka Mine · 2400910

    Regular Safety and Health Inspection · 33.5 on-site hours

  14. violation9731926
    Absaloka Mine · 2400910

    77.1606(a) · $151.00 proposed

  15. violation9731925
    Absaloka Mine · 2400910

    77.1110 · $151.00 proposed

  16. violation9731924
    Absaloka Mine · 2400910

    77.404(a) · $151.00 proposed

  17. violation9731923
    Absaloka Mine · 2400910

    47.44(b) · $151.00 proposed

  18. violation9731922
    Absaloka Mine · 2400910

    77.1104 · S&S · $755.00 proposed

  19. violation9731921
    Absaloka Mine · 2400910

    77.404(a) · $151.00 proposed

  20. violation9731920
    Absaloka Mine · 2400910

    77.1110 · $151.00 proposed

  21. violation9731919
    Absaloka Mine · 2400910

    77.502 · $151.00 proposed

  22. violation9731918
    Absaloka Mine · 2400910

    77.1103(a) · $151.00 proposed

  23. inspection6472747
    Absaloka Mine · 2400910

    Regular Safety and Health Inspection · 42.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS68,9235 rows · 1 receiving plants
HEAT CONTENT · BTU/LB8,550Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.60 / 9.80Separate averages over measured receipts
DELIVERED COST · USD/TON—0.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *28,6158,5500.609.80—
2025-Q440,3088,5500.609.80—
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2025-12EIA row 36384 · finalABSALOKA MINE2400910Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES9,838—Not published8,5500.609.80ContractSUBTruck
2025-11EIA row 33386 · finalABSALOKA MINE2400910Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES14,765—Not published8,5500.609.80ContractSUBTruck
2025-10EIA row 30418 · finalABSALOKA MINE2400910Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES15,705—Not published8,5500.609.80ContractSUBTruck
2025-09EIA row 27409 · finalABSALOKA MINE2400910Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES12,354—Not published8,5500.609.80ContractSUBTruck
2025-08EIA row 24329 · finalABSALOKA MINE2400910Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES16,261—Not published8,5500.609.80ContractSUBTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Absaloka Mine2400910 · Big Horn, Montana883,576———County sales or price not published2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.