Coal production
8,288,533reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Absaloka Mine2400910 · Active6/8 quarters reported | Big Horn, MTSurface · MSHA: Coal (Bituminous) | 155,804 | 73,769 | 18 | 1 | 134.3 |
| Beulah Mine3200043 · Active6/8 quarters reported | Mercer, NDSurface · MSHA: Coal (Lignite) | 0 | 81,495 | 34 | 1 | 118.3 |
| Rosebud Mine & Crusher/Conveyor2401747 · Active6/8 quarters reported | Rosebud, MTSurface · MSHA: Coal (Bituminous) | 8,132,729 | 803,142 | 33 | 8 | 493.0 |
| Savage Mine2400106 · Active6/8 quarters reported | Richland, MTSurface · MSHA: Coal (Lignite) | 0 | 22,134 | 4 | 2 | 55.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
4 of 4 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 4 mines listed under this controller were checked; 4 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 1,747,736 | 186,237 | 9.38 | 407 | 4/4 mines reporting |
| 2025 Q2 | 977,169 | 164,331 | 5.95 | 384 | 4/4 mines reporting |
| 2025 Q3 | 1,787,320 | 173,934 | 10.28 | 378 | 4/4 mines reporting |
| 2025 Q4 | 1,616,900 | 165,746 | 9.76 | 367 | 4/4 mines reporting |
| 2026 Q1 | 1,214,528 | 161,283 | 7.53 | 358 | 4/4 mines reporting |
| 2026 Q2 | 944,880 | 129,009 | 7.32 | 295 | 4/4 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
12 significant & substantial (S&S)
0 records classified as fatality
82 of 89 violations with amounts
22 inspections · 22 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 27 | 2 | 7,588.00 | 3 | 0 | 4 | 206.8 |
| 2025-Q2 | 14 | 3 | 10,457.00 | 1 | 0 | 4 | 33.3 |
| 2025-Q3 | 16 | 2 | 4,899.00 | 0 | 0 | 3 | 183.0 |
| 2025-Q4 | 7 | 3 | 5,358.00 | 0 | 0 | 3 | 125.5 |
| 2026-Q1 | 10 | 2 | 5,302.00 | 5 | 0 | 2 | 53.3 |
| 2026-Q2 | 6 | 0 | 1,010.00 | 2 | 0 | 4 | 41.5 |
| 2026-Q3 | 9 | 0 | 1,110.00 | 1 | 0 | 2 | 157.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
77.404(a)
77.404(a)
77.1605(k)
77.1102
77.1007(b)
77.1110
77.400(a)
Regular Safety and Health Inspection · 127.5 on-site hours
77.904 · $959.00 proposed
77.1102 · $151.00 proposed
Regular Safety and Health Inspection · 30.0 on-site hours
FIRE · ACCIDENT ONLY
Lighting strike cause grass fire that burned on edge of mine permit. Was put out by Rosebud County Wildland fire
77.502-2 · $151.00 proposed
77.1605(b) · $177.00 proposed
77.1110 · $177.00 proposed
77.1110 · $177.00 proposed
77.1607(n) · $177.00 proposed
Regular Safety and Health Inspection · 24.5 on-site hours
EXPLODING VESSELS UNDER PRESSURE · NO DYS AWY FRM WRK,NO RSTR ACT
Customer asked Employee to swap hose fittings on a mine-owned pump. After EE finished, Employee noticed a cam hose fitting was leaking. Employee used a tool to tap the ear of the cam hose. The leak stopped, but as EE walked away, the cam hose fitting ruptured. Employee was struck by either the hose or cam fitting, causing a laceration to EEs face and bruises to EEs torso and knee.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Field Mechanic was boarding EE's service truck and slipped injuring EE's right bicep.
Verbal Hazard Complaint Inspections · 5.5 on-site hours
Spot Inspection · 0.0 on-site hours
77.1607(n) · $151.00 proposed
Regular Safety and Health Inspection · 11.5 on-site hours
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
EE reported a strained back from being loaded while operating end dump
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 1,128,735 | 8,667 | 0.68 | 9.31 | — | |
| 2025-Q4 | 1,590,020 | 8,693 | 0.66 | 9.01 | — | |
| 2026-Q1 | 1,138,605 | 8,664 | 0.71 | 9.08 | — | |
| 2026-Q2 | 796,868 | 8,629 | 0.68 | 9.06 | — | |
| 2026-Q3 * | 556,031 | 8,695 | 0.66 | 9.20 | — |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12085 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 556,031 | —Not published | 8,695 | 0.66 | 9.20 | ContractSUB | Tram/conveyor |
| 2026-06EIA row 10178 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 302,824 | —Not published | 8,645 | 0.68 | 8.80 | ContractSUB | Tram/conveyor |
| 2026-05EIA row 8327 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 195,716 | —Not published | 8,595 | 0.70 | 9.70 | ContractSUB | Tram/conveyor |
| 2026-04EIA row 6523 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 298,328 | —Not published | 8,635 | 0.68 | 8.90 | ContractSUB | Tram/conveyor |
| 2026-03EIA row 4696 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 351,840 | —Not published | 8,625 | 0.73 | 9.30 | ContractSUB | Tram/conveyor |
| 2026-02EIA row 2758 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 328,976 | —Not published | 8,670 | 0.73 | 8.80 | ContractSUB | Tram/conveyor |
| 2026-01EIA row 778 · preliminary | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 457,789 | —Not published | 8,690 | 0.68 | 9.10 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 34820 · final | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 378,236 | —Not published | 8,660 | 0.70 | 9.00 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 36384 · final | ABSALOKA MINE2400910 | Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES | 9,838 | —Not published | 8,550 | 0.60 | 9.80 | ContractSUB | Truck |
| 2025-11EIA row 31826 · final | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 567,669 | —Not published | 8,690 | 0.64 | 9.30 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 33386 · final | ABSALOKA MINE2400910 | Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES | 14,765 | —Not published | 8,550 | 0.60 | 9.80 | ContractSUB | Truck |
| 2025-10EIA row 28880 · final | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 603,807 | —Not published | 8,725 | 0.66 | 8.70 | ContractSUB | Tram/conveyor |
| 2025-10EIA row 30418 · final | ABSALOKA MINE2400910 | Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES | 15,705 | —Not published | 8,550 | 0.60 | 9.80 | ContractSUB | Truck |
| 2025-09EIA row 25811 · final | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 474,943 | —Not published | 8,670 | 0.71 | 9.30 | ContractSUB | Tram/conveyor |
| 2025-09EIA row 27409 · final | ABSALOKA MINE2400910 | Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES | 12,354 | —Not published | 8,550 | 0.60 | 9.80 | ContractSUB | Truck |
| 2025-08EIA row 22682 · final | ROSEBUD MINE&CRUSHER/CONVEYOR2401747 | Colstrip6076 · MT · WESTERN ENERGY | 625,177 | —Not published | 8,670 | 0.66 | 9.30 | ContractSUB | Tram/conveyor |
| 2025-08EIA row 24329 · final | ABSALOKA MINE2400910 | Hardin Generator Project55749 · MT · WESTMORELAND RESOURCES | 16,261 | —Not published | 8,550 | 0.60 | 9.80 | ContractSUB | Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. 2 current coal members have no matching annual record; their coverage is unknown. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Savage Mine2400106 · Location unavailable | — | — | — | — | No matching annual production record |
| Absaloka Mine2400910 · Big Horn, Montana | 883,576 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| Rosebud Mine & Crusher/Conveyo2401747 · Rosebud, Montana | 5,978,039 | — | — | — | County sales or price not published1 eligible mines / 1 sales respondents |
| Beulah Mine3200043 · Location unavailable | — | — | — | — | No matching annual production record |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO