Wellmore Coal Company, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
#7 Prep Plant · 44042120.0 on-site hours reported
Impoundment Spot Inspection
#7 Prep Plant · 44042128.5 on-site hours reported
Impoundment Spot Inspection
Nora Preparation Plant · 440549810.0 on-site hours reported
Regular Safety and Health Inspection
Nora Preparation Plant · 44054984.0 on-site hours reported
Surface installations; general.
#7 Prep Plant · 440421230 CFR 77.200 · $151.00 proposed penalty
Regular Safety and Health Inspection
#7 Prep Plant · 440421253.5 on-site hours reported
Regular Safety and Health Inspection
Nora Preparation Plant · 44054985.0 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
#7 Prep Plant · 440421230 CFR 77.216(d) · $151.00 proposed penalty
Impoundment Spot Inspection
#7 Prep Plant · 44042129.5 on-site hours reported
Impoundment Spot Inspection
Nora Preparation Plant · 44054985.0 on-site hours reported
Spot Inspection
#7 Prep Plant · 44042126.0 on-site hours reported
Spot Inspection
#7 Prep Plant · 44042122.0 on-site hours reported
Verbal Hazard Complaint Inspections
#7 Prep Plant · 44042124.8 on-site hours reported
Surface installations; general.
#7 Prep Plant · 440421230 CFR 77.200 · $165.00 proposed penalty
Openings in surface installations; safeguards.
#7 Prep Plant · 440421230 CFR 77.204 · Significant and substantial (S&S) · $366.00 proposed penalty
Mechanical equipment guards.
#7 Prep Plant · 440421230 CFR 77.400(a) · $151.00 proposed penalty
Surface installations; general.
#7 Prep Plant · 440421230 CFR 77.200 · $165.00 proposed penalty
Surface installations; general.
#7 Prep Plant · 440421230 CFR 77.200 · $165.00 proposed penalty
Regular Safety and Health Inspection
#7 Prep Plant · 440421261.3 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
#7 Prep Plant · 440421230 CFR 77.216(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
#7 Prep Plant · 440421230 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
#7 Prep Plant · 440421230 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
#7 Prep Plant · 440421230 CFR 77.1606(c) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
#7 Prep Plant · 440421230 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
#7 Prep Plant · 440421230 CFR 77.410(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.