← Warrior Met Coal Mining, LLC

Warrior Met Coal Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Preshift examination at fixed intervals.

    violationRecord 9822573
    No 7 Mine · 0101401

    30 CFR 75.360(b)(11)(iii) · $226.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 9822572
    No 7 Mine · 0101401

    30 CFR 75.400 · $432.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5069079
    No 7 Mine · 0101401

    30 CFR 75.604(b) · $755.00 proposed penalty

  4. Capacity of fire suppression devices; location and direction of nozzles.

    violationRecord 5069078
    No 7 Mine · 0101401

    30 CFR 75.1107-6(a)(3) · $366.00 proposed penalty

  5. Roof control plan.

    violationRecord 5069077
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · $7,676.00 proposed penalty

  6. Supplemental examination.

    violationRecord 5068874
    No 7 Mine · 0101401

    30 CFR 75.361(a)(1) · $818.00 proposed penalty

  7. Ventilation Technical Investigation

    inspectionRecord 6917466
    No 4 Mine · 0101247

    36.3 on-site hours reported

  8. Spot Inspections

    inspectionRecord 6975889
    No 7 Mine · 0101401

    103(i) · 7.0 on-site hours reported

  9. Accumulation of combustible materials.

    violationRecord 5190083
    No 4 Mine · 0101247

    30 CFR 75.400 · $193.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5068873
    No 7 Mine · 0101401

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  11. Roof control plan.

    violationRecord 5068872
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F014C1A
    No 4 Mine · 0101247

    103(i) · 6.3 on-site hours reported

  13. Roof bolting.

    violationRecord 5062743
    No 4 Mine · 0101247

    30 CFR 75.204(c)(1) · $226.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5062742
    No 4 Mine · 0101247

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  15. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6913255
    No 4 Mine · 0101247

    6.0 on-site hours reported

  16. Identification check system.

    violationRecord 5063531
    No 4 Mine · 0101247

    30 CFR 75.1715 · $151.00 proposed penalty

  17. Other safeguards.

    violationRecord 5063530
    No 4 Mine · 0101247

    30 CFR 75.1403 · $226.00 proposed penalty

  18. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5063529
    No 4 Mine · 0101247

    30 CFR 75.1714-3(a) · $245.00 proposed penalty

  19. Identification check system.

    violationRecord 5063528
    No 4 Mine · 0101247

    30 CFR 75.1715 · $151.00 proposed penalty

  20. Protective clothing; requirements.

    violationRecord 5063527
    No 4 Mine · 0101247

    30 CFR 75.1720(d) · $151.00 proposed penalty

  21. Other safeguards.

    violationRecord 5190815
    No 7 Mine · 0101401

    30 CFR 75.1403 · $818.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5190814
    No 7 Mine · 0101401

    30 CFR 75.503 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  23. Preshift examination at fixed intervals.

    violationRecord 5190813
    No 7 Mine · 0101401

    30 CFR 75.360(g) · $504.00 proposed penalty

  24. Other safeguards.

    violationRecord 5069076
    No 7 Mine · 0101401

    30 CFR 75.1403

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5069075
    No 7 Mine · 0101401

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.