Warrior Met Coal BC, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permanent splicing of trailing cables.
Blue Creek Mine No. 1 · 010344830 CFR 75.604(b)
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 8.0 on-site hours reported
Roof control plan.
Blue Creek Mine No. 1 · 010344830 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Blue Creek Mine No. 1 · 010344830 CFR 75.1731(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Preservation of evidence.
Blue Creek Mine No. 1 · 010344830 CFR 50.12 · $642.00 proposed penalty
Immediate notification.
Blue Creek Mine No. 1 · 010344830 CFR 50.10(d) · Significant and substantial (S&S) · $72,092.00 proposed penalty
Mine emergency evacuation and firefighting program of instruction.
Blue Creek Mine No. 1 · 010344830 CFR 75.1502 · Significant and substantial (S&S) · $64,882.00 proposed penalty
Communications facilities; refuge alternatives.
Blue Creek Mine No. 1 · 010344830 CFR 75.1600-3(a)(2) · $1,037.00 proposed penalty
Condition and examination of firefighting equipment.
Blue Creek Mine No. 1 · 010344830 CFR 75.1100-3 · $336.00 proposed penalty
Roof control plan.
Blue Creek Mine No. 1 · 010344830 CFR 75.220(a)(1) · $592.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Blue Creek Mine No. 1 · 010344830 CFR 75.1002(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Methane monitors.
Blue Creek Mine No. 1 · 010344830 CFR 75.342(a)(4) · $398.00 proposed penalty
Installation of high-voltage transmission cables.
Blue Creek Mine No. 1 · 010344830 CFR 75.807 · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Escapeways; bituminous and lignite mines.
Blue Creek Mine No. 1 · 010344830 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 9.0 on-site hours reported
Methane monitors.
Blue Creek Mine No. 1 · 010344830 CFR 75.342(a)(4) · $313.00 proposed penalty
Accumulations of combustible materials.
Blue Creek Mine No. 1 · 010344830 CFR 77.1104 · $313.00 proposed penalty
Inspection of fire suppression devices.
Blue Creek Mine No. 1 · 010344830 CFR 75.1107-16(b) · $336.00 proposed penalty
Accumulation of combustible materials.
Blue Creek Mine No. 1 · 010344830 CFR 75.400 · $755.00 proposed penalty
Protection from falls of roof, face and ribs.
Blue Creek Mine No. 1 · 010344830 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Ventilation controls.
Blue Creek Mine No. 1 · 010344830 CFR 75.333(c)(3) · $398.00 proposed penalty
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 8.5 on-site hours reported
Mine ventilation plan; submission and approval.
Blue Creek Mine No. 1 · 010344830 CFR 75.370(a)(1) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.