Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · Significant and substantial (S&S) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $432.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Conventional roof support.
CARDINAL · 151721630 CFR 75.206(h) · $818.00 proposed penalty
Hoisting
CARDINAL · 1517216Accident only
Accident narrative
The 630 counterweight steel rope was discovered to have a small area of distortion near the end closest to the counterweight. The hoist was removed from service while repairs were made.
Hoisting
CARDINAL · 1517216Accident only
Accident narrative
The 630 counterweight steel rope was discovered to have a small area of distortion near the end closest to the counterweight. The hoist was removed from service while repairs were made.
Ventilation Technical Investigation
CARDINAL · 151721623.0 on-site hours reported
Spot Inspection
CARDINAL · 151721615.0 on-site hours reported
Retirement criteria.
CARDINAL · 151721630 CFR 75.1434(e) · $1,431.00 proposed penalty
Ventilation controls.
CARDINAL · 151721630 CFR 75.333(g) · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $398.00 proposed penalty
Hoisting
CARDINAL · 1517216Accident only
Accident narrative
The 630 counterweight steel rope was discovered to have a small area of distortion near the end closest to the counterweight. The hoist was removed from service while repairs were made.
Spot Inspections
CARDINAL · 1517216103(i) · 8.0 on-site hours reported
Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Warning devices.
CARDINAL · 151721630 CFR 75.208 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Retirement criteria.
CARDINAL · 151721630 CFR 75.1434(e) · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $177.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $193.00 proposed penalty
Belt air course ventilation.
CARDINAL · 151721630 CFR 75.350(b) · $366.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 7.3 on-site hours reported
Weekly examination.
CARDINAL · 151721630 CFR 75.364(h) · $151.00 proposed penalty
Powered haulage
CARDINAL · 1517216No dys awy frm wrk,no rstr act
Accident narrative
Employee was reclaiming belt framing on the old 4C belt when the lo-trac EE was operating came in contact with a piece of hanging framing that shifted contacting the employees left arm causing a laceration that required sutures.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.