Warrior Coal LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(a) · $336.00 proposed penalty
Installation of water sprinkler systems; requirements.
CARDINAL · 151721630 CFR 75.1101-7(a) · $267.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a) · $267.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 5.3 on-site hours reported
Regular Safety and Health Inspection
CARDINAL · 15172161,431.0 on-site hours reported
Quantity and location of firefighting equipment.
CARDINAL · 151721630 CFR 75.1100-2(f) · $245.00 proposed penalty
Impoundment Spot Inspection
Warrior Preparation Plant · 15143357.5 on-site hours reported
Roof Control Technical Investigation
CARDINAL · 15172169.0 on-site hours reported
Spot Inspections
CARDINAL · 1517216103(i) · 8.8 on-site hours reported
Spot Inspection
CARDINAL · 151721614.5 on-site hours reported
Spot Inspection
CARDINAL · 15172161.5 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
CARDINAL · 151721630 CFR 75.1909(b)(4) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
CARDINAL · 151721630 CFR 75.1910(j) · $245.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
CARDINAL · 151721630 CFR 75.1910(f) · $151.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $549.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a) · $267.00 proposed penalty
Belt air course ventilation.
CARDINAL · 151721630 CFR 75.350(a)(2) · $151.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
CARDINAL · 151721630 CFR 75.1911(f) · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
CARDINAL · 151721630 CFR 75.1725(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(a) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.