ALL STATUSES / OPERATOR PORTFOLIO

VEGA CONSTRUCTION & TRUCKING, LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0181913

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
VEGA-PORTABLE CRUSHER #12601862 · IntermittentElko, NVSurface · MSHA: Construction Sand and Gravel——17013.8
Wash Plant2602639 · IntermittentElko, NVSurface · MSHA: Sand, Common——102.8

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

18

4 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q24
  3. 2025 Q30
  4. 2025 Q414
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,718.00

18 of 18 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2604
  3. 2025 Q3—
  4. 2025 Q42,114
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

16.50

7 inspections · 7 with hours

  1. 2025 Q1—
  2. 2025 Q25.00
  3. 2025 Q32.00
  4. 2025 Q49.50
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q240604.000035.0
2025-Q300—0022.0
2025-Q41442,114.000029.5
2026-Q100—000—
2026-Q200—000—
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9682879
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14100(a) · S&S · $151.00 proposed

  2. violation9682878
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.18002(a) · S&S · $151.00 proposed

  3. violation9682876
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.12019 · $151.00 proposed

  4. violation9682877
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14112(a)(1) · $151.00 proposed

  5. violation9682875
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14100(b) · $151.00 proposed

  6. violation9682874
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14112 · $151.00 proposed

  7. violation9682873
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4102 · $151.00 proposed

  8. violation9682872
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4130 · $151.00 proposed

  9. violation9682871
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4101 · $151.00 proposed

  10. violation9682870
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4104 · $151.00 proposed

  11. violation9682869
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4102 · S&S · $151.00 proposed

  12. violation9682868
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4102 · S&S · $151.00 proposed

  13. violation9682862
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4430(b)(3) · $151.00 proposed

  14. violation9682880
    Wash Plant · 2602639

    56.4102 · $151.00 proposed

  15. inspectionF01D743
    VEGA-PORTABLE CRUSHER #1 · 2601862

    Regular Safety and Health Inspection · 8.5 on-site hours

  16. inspectionF01D744
    Wash Plant · 2602639

    Regular Safety and Health Inspection · 1.0 on-site hours

  17. inspection6880107
    VEGA-PORTABLE CRUSHER #1 · 2601862

    Special Emphasis Programs · 1.0 on-site hours

  18. inspection6880108
    Wash Plant · 2602639

    Special Emphasis Programs · 1.0 on-site hours

  19. inspection6880174
    VEGA-PORTABLE CRUSHER #1 · 2601862

    Compliance Follow-up Inspection · 0.5 on-site hours

  20. inspection6880172
    VEGA-PORTABLE CRUSHER #1 · 2601862

    Regular Safety and Health Inspection · 3.8 on-site hours

  21. inspection6880173
    Wash Plant · 2602639

    Regular Safety and Health Inspection · 0.8 on-site hours

  22. violation9893976
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14103(b) · $151.00 proposed

  23. violation9893975
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.15001 · $151.00 proposed

  24. violation9893974
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.4104(a) · $151.00 proposed

  25. violation9893973
    VEGA-PORTABLE CRUSHER #1 · 2601862

    56.14107(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.