Coal production
0reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| 243 Quarry1202409 · Active6/8 quarters reported | Putnam, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 96,734 | 8 | 1 | 56.8 |
| Crawfordsville Plant1202141 · Active6/8 quarters reported | Montgomery, INSurface · MSHA: Construction Sand and Gravel | 0 | 29,911 | 1 | 1 | 55.0 |
| Delphi Plant1200023 · Active6/8 quarters reported | Carroll, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 96,624 | 7 | 1 | 62.5 |
| US Aggregates-Columbus Plant1200073 · Active6/8 quarters reported | Bartholomew, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 47,533 | 7 | 1 | 35.5 |
| US Aggregates-Flat Rock Plant1200016 · Active6/8 quarters reported | Shelby, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 40,945 | 4 | 0 | 41.5 |
| US Aggregates-Francesville Quarry1200136 · Active6/8 quarters reported | Pulaski, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 69,604 | 2 | 1 | 41.8 |
| US Aggregates-Linn Grove Quarry1200071 · Active6/8 quarters reported | Adams, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 20,911 | 1 | 0 | 30.8 |
| US Aggregates-Lowell Quarry1202134 · Active6/8 quarters reported | Lake, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 66,733 | 5 | 2 | 67.5 |
| US Aggregates-Monon Quarry1200194 · Active6/8 quarters reported | White, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 27,977 | 4 | 0 | 30.5 |
| US Aggregates-Pleasant Mills Quarry1200072 · Active6/8 quarters reported | Adams, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 17,517 | 3 | 0 | 45.8 |
| US Aggregates-Portland Quarry1200102 · Active6/8 quarters reported | Jay, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 67,260 | 12 | 2 | 79.0 |
| Us Aggregates Richmond Plant1202212 · Active6/8 quarters reported | Wayne, INSurface · MSHA: Construction Sand and Gravel | 0 | 22,982 | 0 | 0 | 28.5 |
| US Aggregates-Ridgeville Quarry1200037 · Active6/8 quarters reported | Randolph, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 22,898 | 1 | 0 | 35.3 |
| US Aggregates-Springville Plant1202429 · Active6/8 quarters reported | Lawrence, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 41,349 | 16 | 1 | 73.0 |
| US Aggregates-Swisher Plant1202264 · Active6/8 quarters reported | Tippecanoe, INSurface · MSHA: Construction Sand and Gravel | 0 | 23,198 | 0 | 0 | 23.8 |
| US Aggregates - Thorntown Sand & Gravel1200582 · Active6/8 quarters reported | Boone, INSurface · MSHA: Construction Sand and Gravel | 0 | 31,522 | 2 | 0 | 53.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
16 of 16 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 16 mines listed under this operator were checked; 16 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 121,803 | 0.00 | 207 | 16/16 mines reporting |
| 2025 Q2 | 0 | 126,940 | 0.00 | 209 | 16/16 mines reporting |
| 2025 Q3 | 0 | 143,535 | 0.00 | 213 | 16/16 mines reporting |
| 2025 Q4 | 0 | 122,842 | 0.00 | 209 | 16/16 mines reporting |
| 2026 Q1 | 0 | 84,546 | 0.00 | 197 | 16/16 mines reporting |
| 2026 Q2 | 0 | 124,032 | 0.00 | 207 | 16/16 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
12 significant & substantial (S&S)
0 records classified as fatality
73 of 73 violations with amounts
74 inspections · 74 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 29 | 7 | 6,270.00 | 4 | 0 | 11 | 97.5 |
| 2025-Q2 | 7 | 1 | 1,956.00 | 1 | 0 | 7 | 99.5 |
| 2025-Q3 | 5 | 0 | 830.00 | 1 | 0 | 14 | 144.5 |
| 2025-Q4 | 1 | 0 | 151.00 | 0 | 0 | 3 | 42.0 |
| 2026-Q1 | 10 | 1 | 1,938.00 | 2 | 0 | 14 | 172.5 |
| 2026-Q2 | 18 | 3 | 3,680.00 | 2 | 0 | 17 | 162.0 |
| 2026-Q3 | 3 | 0 | 453.00 | 0 | 0 | 7 | 42.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 0.0 on-site hours
Spot Inspection · 3.8 on-site hours
Spot Inspection · 12.0 on-site hours
Spot Inspection · 2.0 on-site hours
Spot Inspection · 3.5 on-site hours
Spot Inspection · 7.0 on-site hours
Regular Safety and Health Inspection · 8.5 on-site hours
56.12030 · $151.00 proposed
56.4200(b)(2) · $151.00 proposed
56.4201(a)(1) · $151.00 proposed
Regular Safety and Health Inspection · 5.8 on-site hours
Regular Safety and Health Inspection · 10.5 on-site hours
Regular Safety and Health Inspection · 11.0 on-site hours
56.9300(a) · $151.00 proposed
56.14207 · $151.00 proposed
Regular Safety and Health Inspection · 13.0 on-site hours
Regular Safety and Health Inspection · 9.8 on-site hours
56.14112(b) · $151.00 proposed
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
EE was entering EE's haul truck when EE heard EE's right knee pop when sitting down into the seat. Miner had an MRI done on 5/19/2026 where a tear in EE's meniscus was found. The miner is scheduled for surgery to repair the knee.
Regular Safety and Health Inspection · 8.0 on-site hours
Regular Safety and Health Inspection · 8.0 on-site hours
Verbal Hazard Complaint Inspections · 2.3 on-site hours
Spot Inspection · 0.0 on-site hours
56.11001 · S&S · $465.00 proposed
SLIP OR FALL OF PERSON · DAYS RESTRICTED ACTIVITY ONLY
A miner tweaked EE's knee while accessing the boat to work on the water pump. The injury occurred on 5/15/2026 and was placed on restricted duty on 5/18/2026. The miner has returned to full duty on 5/22/2026 with no lost work days.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.