ACTIVE / OPERATOR PORTFOLIO

Texas Materials Group, Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDL16618

MINE PORTFOLIO

5 of 5 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Divot Quarry4104879 · Active6/8 quarters reportedFrio, TXSurface · MSHA: Crushed, Broken Limestone NEC027,5747021.3
Marble Falls Quarry4104489 · Active6/8 quarters reportedBurnet, TXSurface · MSHA: Crushed, Broken Limestone NEC0502,183372143.8
Rosevine Quarry4104676 · Active6/8 quarters reportedSabine, TXSurface · MSHA: Construction Sand and Gravel049,6045039.5
Texas Materials Garfield Plant4104963 · Active6/8 quarters reportedTravis, TXSurface · MSHA: Construction Sand and Gravel078,8198135.5
Texas Materials Hergotz Plant4104441 · Active6/8 quarters reportedTravis, TXSurface · MSHA: Construction Sand and Gravel033,5013025.3

LOCATION

Portfolio map

5 of 5 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

60

10 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q28
  3. 2025 Q30
  4. 2025 Q45
  5. 2026 Q114
  6. 2026 Q222
  7. 2026 Q37
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

16,045.00

59 of 60 violations with amounts

  1. 2025 Q1604
  2. 2025 Q21,208
  3. 2025 Q3—
  4. 2025 Q4839
  5. 2026 Q13,982
  6. 2026 Q28,297
  7. 2026 Q31,115
  8. 2026 Q4 *—

On-site inspection hours

265.25

23 inspections · 23 with hours

  1. 2025 Q165.25
  2. 2025 Q243.00
  3. 2025 Q3—
  4. 2025 Q426.50
  5. 2026 Q154.50
  6. 2026 Q263.25
  7. 2026 Q312.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q140604.0010565.3
2025-Q2811,208.0000543.0
2025-Q300—200—
2025-Q450839.0000326.5
2026-Q11433,982.0000354.5
2026-Q22268,297.0000463.3
2026-Q3701,115.0000312.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF044412
    Texas Materials Hergotz Plant · 4104441

    Regular Safety and Health Inspection · 5.0 on-site hours

  2. inspectionF044413
    Texas Materials Garfield Plant · 4104963

    Compliance Follow-up Inspection · 0.8 on-site hours

  3. violation5177800
    Texas Materials Hergotz Plant · 4104441

    56.14101(a)(2) · $151.00 proposed

  4. violation5177799
    Texas Materials Hergotz Plant · 4104441

    56.12004 · $209.00 proposed

  5. inspectionF044410
    Texas Materials Garfield Plant · 4104963

    Regular Safety and Health Inspection · 7.0 on-site hours

  6. violation5177790
    Texas Materials Garfield Plant · 4104963

    56.12008 · $151.00 proposed

  7. violation5177789
    Texas Materials Garfield Plant · 4104963

    56.14110 · $151.00 proposed

  8. violation5177788
    Texas Materials Garfield Plant · 4104963

    56.12019 · $151.00 proposed

  9. violation5177787
    Texas Materials Garfield Plant · 4104963

    56.14101(a)(3) · $151.00 proposed

  10. violation5177786
    Texas Materials Garfield Plant · 4104963

    56.14132(b)(2) · $151.00 proposed

  11. inspectionF02FE5E
    Divot Quarry · 4104879

    Compliance Follow-up Inspection · 2.0 on-site hours

  12. inspectionF02FE5D
    Divot Quarry · 4104879

    Regular Safety and Health Inspection · 5.8 on-site hours

  13. violation5177727
    Divot Quarry · 4104879

    56.14112(b) · $151.00 proposed

  14. violation5177726
    Divot Quarry · 4104879

    56.20003(a) · $151.00 proposed

  15. violation5177725
    Divot Quarry · 4104879

    56.12018 · $193.00 proposed

  16. violation5177724
    Divot Quarry · 4104879

    56.14112(b) · $151.00 proposed

  17. violation5176790
    Marble Falls Quarry · 4104489

    56.4201(a)(2) · $151.00 proposed

  18. violation5176789
    Marble Falls Quarry · 4104489

    56.4201(a) · $151.00 proposed

  19. violation5176788
    Marble Falls Quarry · 4104489

    56.12013(b) · $313.00 proposed

  20. violation5176787
    Marble Falls Quarry · 4104489

    56.14132(b)(1)(i) · S&S · $465.00 proposed

  21. violation5176786
    Marble Falls Quarry · 4104489

    56.15007 · S&S · $697.00 proposed

  22. violation5176785
    Marble Falls Quarry · 4104489

    56.14132(b)(1)(i) · $151.00 proposed

  23. violation5176784
    Marble Falls Quarry · 4104489

    56.14112(b) · $151.00 proposed

  24. violation5176783
    Marble Falls Quarry · 4104489

    56.14107(a) · S&S · $697.00 proposed

  25. violation5176782
    Marble Falls Quarry · 4104489

    56.20003(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.