Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MSHA OPERATOR ID0119889
MINE PORTFOLIO
1 of 1 mines and facilities
2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Database snapshot · 2026-10-17. All 1 mines listed under this operator were checked; 0 have reports in the available quarters. Totals use current ownership.
Coal production
—
reported short tons
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Hours worked
—
reported employee hours
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Tons per hour
—
production ÷ hours worked
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
Quarterly production, employment and reporting coverage for Silver Opportunity Partners LLC
Quarter
Coal (short tons)
Hours worked
Tons / hour
Avg. employees
Coverage
2025 Q1
—
—
—
—
No report
2025 Q2
—
—
—
—
No report
2025 Q3
—
—
—
—
No report
2025 Q4
—
—
—
—
No report
2026 Q1
—
—
—
—
No report
2026 Q2
—
—
—
—
No report
2026 Q3
—
—
—
—
No report
2026 Q4
—
—
—
—
No report
Safety and enforcement
2025-01-01 – 2026-10-17
Violations
6
0 significant & substantial (S&S)
2025 Q10
2025 Q21
2025 Q31
2025 Q41
2026 Q10
2026 Q23
2026 Q30
2026 Q4 *0
Accident records
6
0 records classified as fatality
2025 Q10
2025 Q21
2025 Q31
2025 Q41
2026 Q13
2026 Q20
2026 Q30
2026 Q4 *0
Proposed penalties · USD
772.00
5 of 6 violations with amounts
2025 Q1—
2025 Q2—
2025 Q3151
2025 Q4151
2026 Q1—
2026 Q2470
2026 Q3—
2026 Q4 *—
On-site inspection hours
226.25
16 inspections · 16 with hours
2025 Q116.50
2025 Q253.25
2025 Q319.50
2025 Q437.75
2026 Q125.75
2026 Q247.00
2026 Q326.50
2026 Q4 *—
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
Quarter
Violations
S&S
Proposed USD
Accident records
Fatality records
Inspections
On-site hours
2025-Q1
0
0
—
0
0
2
16.5
2025-Q2
1
0
—
1
0
3
53.3
2025-Q3
1
0
151.00
1
0
2
19.5
2025-Q4
1
0
151.00
1
0
2
37.8
2026-Q1
0
0
—
3
0
2
25.8
2026-Q2
3
0
470.00
0
0
3
47.0
2026-Q3
0
0
—
0
0
2
26.5
2026-Q4 *
0
0
—
0
0
0
—
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
EE was installing air header onto existing HDPE pipe valve. EE tightened the vic between the valve and header. EE realized the header needed to be rotated so EE used the impact and started to loosen the bolt. EE inadvertently loosened the bolt on the charged side of the valve causing the header to break free from the vic.
EE was swamping on the back of the track lowboy that was loaded with an electrical cabinet. The cabinet came in contact with the lockbox for the portal gate causing the lowboy to come to a sudden stop. The stop caused the employee to come in contact with the electrical cabinet.
The electric motor for the pump on the 1700 level lost one leg of the 3 phases. This caused the remaining two legs to heat up because they were drawing more amperage. The varnish on the coils and insulation started to smoke as a result of the motor heating up.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
1 linked controller.
Relationships reflect the selected mine status and current MSHA controller/operator fields.