ACTIVE / OPERATOR PORTFOLIO

SCREAMING EAGLE COAL LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0180113

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
LITTLE EAGLE MINE NO 14608560 · Active6/8 quarters reportedClay, WVUnderground · MSHA: Coal (Bituminous)54,16956,140722724.0
Peach Orchard Prep Plant & Loading Facil4608376 · Active6/8 quarters reportedClay, WVFacility · MSHA: Coal (Bituminous)044,705140300.8

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

86

12 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q22
  3. 2025 Q39
  4. 2025 Q417
  5. 2026 Q125
  6. 2026 Q222
  7. 2026 Q310
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

25,201.00

83 of 86 violations with amounts

  1. 2025 Q1267
  2. 2025 Q2336
  3. 2025 Q32,339
  4. 2025 Q49,072
  5. 2026 Q15,728
  6. 2026 Q25,443
  7. 2026 Q32,016
  8. 2026 Q4 *—

On-site inspection hours

1,024.75

23 inspections · 23 with hours

  1. 2025 Q182.25
  2. 2025 Q252.75
  3. 2025 Q3175.50
  4. 2025 Q4233.25
  5. 2026 Q1133.00
  6. 2026 Q2225.50
  7. 2026 Q3115.00
  8. 2026 Q4 *7.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110267.0000282.3
2025-Q220336.0000152.8
2025-Q3912,339.00109175.5
2025-Q41749,072.00003233.3
2026-Q12515,728.00001133.0
2026-Q22245,443.00104225.5
2026-Q31022,016.00002115.0
2026-Q4 *00—0017.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF016EEB
    LITTLE EAGLE MINE NO 1 · 4608560

    Regular Safety and Health Inspection · 7.5 on-site hours

  2. inspectionF01CF97
    LITTLE EAGLE MINE NO 1 · 4608560

    Spot Inspection · 1.5 on-site hours

  3. violation9844213
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1713-3

  4. violation9844212
    LITTLE EAGLE MINE NO 1 · 4608560

    48.7(a) · S&S

  5. violation5026384
    LITTLE EAGLE MINE NO 1 · 4608560

    75.211(d) · $151.00 proposed

  6. violation5027202
    LITTLE EAGLE MINE NO 1 · 4608560

    75.604(b) · S&S · $959.00 proposed

  7. violation9844210
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1101-10 · $151.00 proposed

  8. violation9844209
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1103-1 · $151.00 proposed

  9. violation9844208
    LITTLE EAGLE MINE NO 1 · 4608560

    75.902-4 · $151.00 proposed

  10. violation9844207
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1725(a) · $151.00 proposed

  11. violation5183524
    LITTLE EAGLE MINE NO 1 · 4608560

    75.503 · $151.00 proposed

  12. violation5183523
    LITTLE EAGLE MINE NO 1 · 4608560

    75.503 · $151.00 proposed

  13. inspectionF016EE6
    LITTLE EAGLE MINE NO 1 · 4608560

    Regular Safety and Health Inspection · 113.5 on-site hours

  14. accident220261770010
    LITTLE EAGLE MINE NO 1 · 4608560

    OTHER · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was walking up entry and felt a pain and burning in left knee , EE advised pain increased with any movement , also advised there was no mechanism of injury. Employee was brought to surface and transported to medical facility for treatment

  15. violation5189400
    LITTLE EAGLE MINE NO 1 · 4608560

    75.370(a)(1) · $151.00 proposed

  16. violation5183521
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1103-5(a)(1) · $336.00 proposed

  17. violation5189399
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1505(b) · $151.00 proposed

  18. violation9166305
    Peach Orchard Prep Plant & Loading Facil · 4608376

    77.410(a)(1) · $151.00 proposed

  19. violation9166304
    Peach Orchard Prep Plant & Loading Facil · 4608376

    77.1606(a) · S&S · $398.00 proposed

  20. violation9166303
    Peach Orchard Prep Plant & Loading Facil · 4608376

    77.404(a) · S&S · $398.00 proposed

  21. violation9166302
    Peach Orchard Prep Plant & Loading Facil · 4608376

    77.1606(c) · $151.00 proposed

  22. violation9844200
    LITTLE EAGLE MINE NO 1 · 4608560

    75.1107-4(a)(1) · $151.00 proposed

  23. inspectionF00B828
    LITTLE EAGLE MINE NO 1 · 4608560

    Verbal Hazard Complaint Inspections · 13.5 on-site hours

  24. violation9844199
    LITTLE EAGLE MINE NO 1 · 4608560

    48.7(a) · $168.00 proposed

  25. violation9844198
    LITTLE EAGLE MINE NO 1 · 4608560

    75.338(b) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS12,4091 rows · 1 receiving plants
HEAT CONTENT · BTU/LB13,128Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.71 / 8.70Separate averages over measured receipts
DELIVERED COST · USD/TON122.04100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2026-Q3 *12,40913,1280.718.70122.04
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11728 · preliminaryPEACH ORCHARD PREP PLANT & LD4608376Roxboro2712 · NC · CENTRAL COAL12,409122.0413,1280.718.70ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Peach Orchard Prep Plant & Loa4608376 · Clay, West Virginia0———Preparation plant3 eligible mines / 3 sales respondents
Little Eagle Mine No 14608560 · Clay, West Virginia66,357———County sales or price not published3 eligible mines / 3 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.