ALL STATUSES / OPERATOR PORTFOLIO

Ruach Resources LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0118050

MINE PORTFOLIO

5 of 5 mines and facilities

2025-01-01 – 2026-10-13. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Ruach Resources 13200883 · Intermittent6/8 quarters reportedWilliams, NDSurface · MSHA: Construction Sand and Gravel05,6138020.8
Ruach Resources 23201062 · Intermittent6/8 quarters reportedWilliams, NDSurface · MSHA: Construction Sand and Gravel03,88912027.3
Ruach Resources 33200902 · Intermittent6/8 quarters reportedMckenzie, NDSurface · MSHA: Construction Sand and Gravel05,44118027.3
Ruach Resources 43201096 · Intermittent2/8 quarters reportedMckenzie, NDSurface · MSHA: Construction Sand and Gravel06175015.0
Triple Aggregate 23200962 · AbandonedMountrail, NDSurface · MSHA: Construction Sand and Gravel——00—

LOCATION

Portfolio map

4 of 5 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

43

8 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q29
  3. 2025 Q30
  4. 2025 Q48
  5. 2026 Q10
  6. 2026 Q210
  7. 2026 Q316
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

11,380.00

43 of 43 violations with amounts

  1. 2025 Q1—
  2. 2025 Q24,170
  3. 2025 Q3—
  4. 2025 Q41,208
  5. 2026 Q1—
  6. 2026 Q22,926
  7. 2026 Q33,076
  8. 2026 Q4 *—

On-site inspection hours

90.25

8 inspections · 8 with hours

  1. 2025 Q1—
  2. 2025 Q238.75
  3. 2025 Q3—
  4. 2025 Q48.00
  5. 2026 Q1—
  6. 2026 Q223.75
  7. 2026 Q319.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q2914,170.0000338.8
2025-Q300—000—
2025-Q4801,208.000018.0
2026-Q100—000—
2026-Q21022,926.0000223.8
2026-Q31653,076.0000219.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF03B8C8
    Ruach Resources 3 · 3200902

    Compliance Follow-up Inspection · 1.0 on-site hours

  2. violation5211138
    Ruach Resources 3 · 3200902

    56.14100(a) · $245.00 proposed

  3. violation5211137
    Ruach Resources 3 · 3200902

    56.20008(b) · $151.00 proposed

  4. violation5211136
    Ruach Resources 3 · 3200902

    56.12032 · $151.00 proposed

  5. violation5211135
    Ruach Resources 3 · 3200902

    56.14107(a) · $151.00 proposed

  6. violation5211134
    Ruach Resources 3 · 3200902

    56.9301 · S&S · $165.00 proposed

  7. violation5211133
    Ruach Resources 3 · 3200902

    56.14107(a) · S&S · $165.00 proposed

  8. violation5211132
    Ruach Resources 3 · 3200902

    56.14207 · $151.00 proposed

  9. violation5211131
    Ruach Resources 3 · 3200902

    56.14132(a) · S&S · $366.00 proposed

  10. violation5211130
    Ruach Resources 3 · 3200902

    56.14207 · $151.00 proposed

  11. violation5211129
    Ruach Resources 3 · 3200902

    56.16006 · $151.00 proposed

  12. violation5211128
    Ruach Resources 3 · 3200902

    56.14100(c) · S&S · $165.00 proposed

  13. violation5211127
    Ruach Resources 3 · 3200902

    56.14100(d) · $151.00 proposed

  14. violation5211126
    Ruach Resources 3 · 3200902

    56.14103(b) · $245.00 proposed

  15. violation5211125
    Ruach Resources 3 · 3200902

    56.9300(a) · $151.00 proposed

  16. violation5211124
    Ruach Resources 3 · 3200902

    56.14100(c) · $151.00 proposed

  17. violation5211123
    Ruach Resources 3 · 3200902

    56.14132(b)(2) · S&S · $366.00 proposed

  18. inspectionF03B8C6
    Ruach Resources 3 · 3200902

    Regular Safety and Health Inspection · 18.8 on-site hours

  19. inspectionF0175F8
    Ruach Resources 1 · 3200883

    Regular Safety and Health Inspection · 8.8 on-site hours

  20. violation5212209
    Ruach Resources 1 · 3200883

    56.12032 · S&S · $1,320.00 proposed

  21. violation5212208
    Ruach Resources 1 · 3200883

    56.12004 · $151.00 proposed

  22. violation5212207
    Ruach Resources 1 · 3200883

    56.14207 · $151.00 proposed

  23. violation5212206
    Ruach Resources 1 · 3200883

    56.14207 · $151.00 proposed

  24. violation5212205
    Ruach Resources 1 · 3200883

    56.12032 · S&S · $398.00 proposed

  25. violation5212109
    Ruach Resources 4 · 3201096

    56.12032 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.