ROCKWELL MINING, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Atmospheric monitoring systems.
EAGLE #3 MINE · 460942730 CFR 75.351(c)(4) · $151.00 proposed penalty
Cable fittings; suitability.
COAL BRANCH NO. 2 · 460966330 CFR 75.515 · $245.00 proposed penalty
Verbal Hazard Complaint Inspections
Flying Eagle · 46094716.0 on-site hours reported
Permanent splicing of trailing cables.
EAGLE #3 MINE · 460942730 CFR 75.604(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Drill dust control at underground areas of underground mines.
EAGLE #3 MINE · 460942730 CFR 72.630(b) · $267.00 proposed penalty
Permissible electric face equipment; maintenance.
EAGLE #3 MINE · 460942730 CFR 75.503 · $549.00 proposed penalty
Machinery and equipment; operation and maintenance.
EAGLE #3 MINE · 460942730 CFR 75.1725(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Machinery and equipment; operation and maintenance.
COAL BRANCH NO. 2 · 460966330 CFR 75.1725(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Machinery and equipment; operation and maintenance.
Glancy Surface Mine · 460937730 CFR 77.404(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Glancy Surface Mine · 460937730 CFR 77.1606(c) · $165.00 proposed penalty
Loading and haulage equipment; installations.
Glancy Surface Mine · 460937730 CFR 77.1605(k) · $165.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Glancy Surface Mine · 460937730 CFR 77.1606(c) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · $245.00 proposed penalty
Emergency tethers.
EAGLE #3 MINE · 460942730 CFR 75.1714-6 · $267.00 proposed penalty
Emergency tethers.
EAGLE #3 MINE · 460942730 CFR 75.1714-6 · $267.00 proposed penalty
Verbal Hazard Complaint Inspections
COAL BRANCH NO. 2 · 46096635.0 on-site hours reported
Accumulations of combustible materials.
Glancy Surface Mine · 460937730 CFR 77.1104 · $245.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(e) · $1,219.00 proposed penalty
Accumulations of combustible materials.
Rocklick Preparation Plant · 460644830 CFR 77.1104 · $193.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $1,431.00 proposed penalty
Accumulations of combustible materials.
Glancy Surface Mine · 460937730 CFR 77.1104 · $245.00 proposed penalty
Quarterly sampling; designated areas.
COAL BRANCH NO. 2 · 460966330 CFR 70.209(a) · $245.00 proposed penalty
Loading and haulage equipment; installations.
Flying Eagle · 460947130 CFR 77.1605(d) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.