Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $755.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Flying Eagle · 460947130 CFR 75.1731(a) · $288.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
Flying Eagle · 460947130 CFR 75.1101-8(a) · $151.00 proposed penalty
Mechanical equipment guards.
Flying Eagle · 460947130 CFR 75.1722(c) · $193.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Roof control plan.
Flying Eagle · 460947130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $10,569.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $504.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
COAL BRANCH NO. 2 · 460966330 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Permanent splicing of trailing cables.
EAGLE #3 MINE · 460942730 CFR 75.604(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
COAL BRANCH NO. 2 · 460966330 CFR 75.1600-2(b) · $151.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
COAL BRANCH NO. 2 · 460966330 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Fall of roof or back
Flying Eagle · 4609471No dys awy frm wrk,no rstr act
Accident narrative
Employee stated EE was installing roof bolts in the #2 entry when a piece of draw rock fell, striking EE on the right side of EE's head. This caused a laceration to EE's right cheek that required sutures. Employee returned to work on EE's next shift with a full duty release.
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · $3,448.00 proposed penalty
Electric equipment and circuits; overload and short circuit protection.
EAGLE #3 MINE · 460942730 CFR 75.518 · $592.00 proposed penalty
Permissible electric face equipment; maintenance.
EAGLE #3 MINE · 460942730 CFR 75.503 · $1,968.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Surface installations; general.
Rocklick Preparation Plant · 460644830 CFR 77.200 · $1,550.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · $48,328.00 proposed penalty
Examination and maintenance of firefighting equipment.
Rocklick Preparation Plant · 460644830 CFR 77.1110 · $398.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(b) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $5,574.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Dust accumulations in surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.202 · $4,383.00 proposed penalty
Travelways at surface installations.
Rocklick Preparation Plant · 460644830 CFR 77.205(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.