ROCKWELL MINING, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
EAGLE #3 MINE · 460942730 CFR 75.202(a) · $549.00 proposed penalty
Cable fittings; suitability.
Flying Eagle · 460947130 CFR 75.515 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $313.00 proposed penalty
Power wires and cables; insulation and protection.
Flying Eagle · 460947130 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Mechanical equipment guards.
Flying Eagle · 460947130 CFR 75.1722(a) · $2,133.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $697.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $336.00 proposed penalty
Roof control plan.
Flying Eagle · 460947130 CFR 75.220(a)(1) · $959.00 proposed penalty
Protection from falls of roof, face and ribs.
Flying Eagle · 460947130 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Permanent splicing of trailing cables.
Flying Eagle · 460947130 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $2,936.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $313.00 proposed penalty
Mobile equipment; automatic warning devices.
Flying Eagle · 460947130 CFR 77.410(a) · $1,431.00 proposed penalty
Weekly examination.
Flying Eagle · 460947130 CFR 75.364(b)(1) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
WELLS PREP PLANT AND LOADOUT · 460529530 CFR 77.1109(c)(1) · $151.00 proposed penalty
Impoundment Spot Inspection
Rocklick Preparation Plant · 46064482.5 on-site hours reported
Rock dusting.
EAGLE #3 MINE · 460942730 CFR 75.402 · $3,184.00 proposed penalty
Power wires and cables; insulation and protection.
EAGLE #3 MINE · 460942730 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
EAGLE #3 MINE · 460942730 CFR 75.1731(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Preshift examination at fixed intervals.
Flying Eagle · 460947130 CFR 75.360(b)(9) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $3,736.00 proposed penalty
Mine ventilation plan; submission and approval.
Flying Eagle · 460947130 CFR 75.370(a)(1) · $504.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $697.00 proposed penalty
Accumulation of combustible materials.
Flying Eagle · 460947130 CFR 75.400 · $697.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.