ACTIVE / OPERATOR PORTFOLIO

Robinson Nevada Mining Company

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0052463

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Robinson Operation2601916 · Active6/8 quarters reportedWhite Pine, NVSurface · MSHA: Copper Ore NEC02,310,261649283.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

64

4 significant & substantial (S&S)

  1. 2025 Q116
  2. 2025 Q22
  3. 2025 Q312
  4. 2025 Q422
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q312
  8. 2026 Q4 *0

Accident records

9

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q22
  3. 2025 Q32
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

28,119.00

63 of 64 violations with amounts

  1. 2025 Q14,082
  2. 2025 Q2319
  3. 2025 Q33,838
  4. 2025 Q410,499
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q39,381
  8. 2026 Q4 *—

On-site inspection hours

283.00

17 inspections · 17 with hours

  1. 2025 Q162.25
  2. 2025 Q211.25
  3. 2025 Q350.25
  4. 2025 Q470.25
  5. 2026 Q14.00
  6. 2026 Q210.25
  7. 2026 Q374.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11624,082.0020162.3
2025-Q220319.0020111.3
2025-Q31203,838.0020250.3
2025-Q422210,499.0010370.3
2026-Q100—0014.0
2026-Q200—10410.3
2026-Q31209,381.0010574.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspection6880219
    Robinson Operation · 2601916

    Compliance Follow-up Inspection · 2.0 on-site hours

  2. accident220253500014
    Robinson Operation · 2601916

    OTHER · DAYS AWAY FROM WORK ONLY

    Accident narrative

    12-2: Tech reported to supervisor feeling knee pop/pain while squatting to pick up a tray off the floor. 12-3: Tech had knee evaluated & diagnosed w/knee sprain-full duty. 12-10: Day before returning to rotation, follow-up for worsening pain/numbness & requested off-duty until MRI. Lost time began 12-11 pending MRI & follow-up appointments.

  3. violation9891796
    Robinson Operation · 2601916

    56.14100(b) · $151.00 proposed

  4. violation9891795
    Robinson Operation · 2601916

    50.20-1 · $151.00 proposed

  5. violation9891794
    Robinson Operation · 2601916

    56.4102

  6. violation9891792
    Robinson Operation · 2601916

    56.4104(b) · $193.00 proposed

  7. violation9891791
    Robinson Operation · 2601916

    56.15001 · $226.00 proposed

  8. violation9891790
    Robinson Operation · 2601916

    56.14101(a)(2) · S&S · $1,126.00 proposed

  9. violation9891789
    Robinson Operation · 2601916

    56.4102 · $775.00 proposed

  10. violation9891787
    Robinson Operation · 2601916

    56.15001 · $226.00 proposed

  11. violation9891786
    Robinson Operation · 2601916

    56.14107(a) · $226.00 proposed

  12. violation9891785
    Robinson Operation · 2601916

    56.16005 · $151.00 proposed

  13. violation9891783
    Robinson Operation · 2601916

    56.14100(b) · S&S · $1,126.00 proposed

  14. violation9891782
    Robinson Operation · 2601916

    56.4102 · $883.00 proposed

  15. violation9891781
    Robinson Operation · 2601916

    56.4102 · $883.00 proposed

  16. violation9891780
    Robinson Operation · 2601916

    56.4102 · $883.00 proposed

  17. violation9891779
    Robinson Operation · 2601916

    56.14100(b) · $883.00 proposed

  18. violation9891778
    Robinson Operation · 2601916

    56.4102 · $883.00 proposed

  19. inspection6880216
    Robinson Operation · 2601916

    Regular Safety and Health Inspection · 65.0 on-site hours

  20. violation9891777
    Robinson Operation · 2601916

    56.14107(a) · $267.00 proposed

  21. violation9891776
    Robinson Operation · 2601916

    56.4201(a)(2) · $267.00 proposed

  22. violation9891775
    Robinson Operation · 2601916

    56.11002 · $267.00 proposed

  23. violation9891774
    Robinson Operation · 2601916

    56.14112(b) · $267.00 proposed

  24. violation9891773
    Robinson Operation · 2601916

    56.12025 · $398.00 proposed

  25. violation9891772
    Robinson Operation · 2601916

    56.15001 · $267.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.