ACTIVE / OPERATOR PORTFOLIO

Responsible Energy Operations

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0179774

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Antioch Mine1202372 · Active6/8 quarters reportedDaviess, INSurface · MSHA: Coal (Bituminous)280,63389,709111244.3
Friendsville Mine1103064 · Active6/8 quarters reportedWabash, ILSurface · MSHA: Coal (Bituminous)293,279112,762185236.3
Friendsville Prep Plant1103296 · Active6/8 quarters reportedWabash, ILFacility · MSHA: Coal (Bituminous)012,4060180.0

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

29

12 significant & substantial (S&S)

  1. 2025 Q15
  2. 2025 Q24
  3. 2025 Q34
  4. 2025 Q43
  5. 2026 Q10
  6. 2026 Q24
  7. 2026 Q35
  8. 2026 Q4 *4

Accident records

7

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q22
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

20,007.00

17 of 29 violations with amounts

  1. 2025 Q110,609
  2. 2025 Q21,166
  3. 2025 Q33,436
  4. 2025 Q4547
  5. 2026 Q1—
  6. 2026 Q24,249
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

560.50

31 inspections · 31 with hours

  1. 2025 Q142.25
  2. 2025 Q2179.25
  3. 2025 Q38.75
  4. 2025 Q4144.75
  5. 2026 Q118.50
  6. 2026 Q288.00
  7. 2026 Q358.75
  8. 2026 Q4 *20.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q15310,609.0010642.3
2025-Q2421,166.00204179.3
2025-Q3413,436.001018.8
2025-Q431547.00005144.8
2026-Q100—10518.5
2026-Q2424,249.0010388.0
2026-Q352—10658.8
2026-Q4 *41—00120.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9780189
    Antioch Mine · 1202372

    77.1606(a)

  2. violation9780188
    Antioch Mine · 1202372

    77.1606(c)

  3. violation9780187
    Antioch Mine · 1202372

    77.1110

  4. inspectionF01E468
    Antioch Mine · 1202372

    Regular Safety and Health Inspection · 20.3 on-site hours

  5. violation9780186
    Antioch Mine · 1202372

    77.1606(c) · S&S

  6. inspectionF01E466
    Friendsville Prep Plant · 1103296

    Spot Inspection · 8.0 on-site hours

  7. violation9780185
    Friendsville Mine · 1103064

    77.1710(g) · S&S

  8. violation9780184
    Friendsville Mine · 1103064

    77.1710(g) · S&S

  9. violation9780183
    Friendsville Mine · 1103064

    Description not reported

  10. violation9780182
    Friendsville Mine · 1103064

    77.1607(d)

  11. inspectionF01E463
    Friendsville Mine · 1103064

    Spot Inspection · 26.0 on-site hours

  12. violation9780181
    Friendsville Mine · 1103064

    77.1606(c)

  13. inspectionF016BA8
    Antioch Mine · 1202372

    Spot Inspection · 2.0 on-site hours

  14. inspectionF016BA7
    Friendsville Mine · 1103064

    Spot Inspection · 4.5 on-site hours

  15. accident220262430010
    Friendsville Prep Plant · 1103296

    POWERED HAULAGE · PERM TOT OR PERM PRTL DISABLTY

    Accident narrative

    Employee operating Cat 988 loader while cleaning gob around plant> Reached above head to check cool air flow from vent; middle finger contacted blower motor, resulting in injury to the tip of middle finger. Surgical grinding of the bone later performed.

  16. inspectionF016B9F
    Antioch Mine · 1202372

    Spot Inspection · 13.0 on-site hours

  17. inspectionF01E45D
    Friendsville Prep Plant · 1103296

    Spot Inspection · 5.3 on-site hours

  18. inspectionF01E45A
    Friendsville Prep Plant · 1103296

    Regular Safety and Health Inspection · 23.5 on-site hours

  19. inspectionF00734C
    Friendsville Mine · 1103064

    Regular Safety and Health Inspection · 23.3 on-site hours

  20. violation9780168
    Antioch Mine · 1202372

    77.1710(g) · S&S · $1,467.00 proposed

  21. violation9780167
    Antioch Mine · 1202372

    77.1710(g) · S&S · $2,782.00 proposed

  22. violation9780166
    Antioch Mine · 1202372

    Description not reported

  23. violation9780165
    Antioch Mine · 1202372

    Description not reported

  24. accident220262040027
    Antioch Mine · 1202372

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was pulling a pump hose when they tripped and fell on their left shoulder. They finished their shift, later sought medical care, and was diagnosed with a torn left rotator cuff. They continued working until surgery on 7-14-2026.

  25. inspectionF008706
    Antioch Mine · 1202372

    Regular Safety and Health Inspection · 41.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS253,66717 rows · 2 receiving plants
HEAT CONTENT · BTU/LB10,750Weighted by reported tons
SULFUR / ASH · % BY WEIGHT2.44 / 10.92Separate averages over measured receipts
DELIVERED COST · USD/TON66.07100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *26,48411,0092.8910.7769.43
2025-Q485,78210,8252.4510.2567.11
2026-Q158,05210,6872.2510.9864.98
2026-Q246,56310,7422.4310.9165.19
2026-Q3 *36,78610,4992.3812.5064.06
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12122 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC36,78664.0610,4992.3812.50ContractBITRail
2026-06EIA row 10213 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC11,58166.1510,8732.5610.70ContractBITRail
2026-05EIA row 8359 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC23,26365.1710,7222.248.60ContractBITRail
2026-04EIA row 6553 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC11,71964.2910,6512.6915.70ContractBITRail
2026-03EIA row 4728 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC11,72463.9210,5872.2611.70ContractBITRail
2026-02EIA row 2796 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC23,00464.6410,6012.2411.30ContractBITRail
2026-01EIA row 815 · preliminaryFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC23,32465.8410,8222.2510.30ContractBITRail
2025-12EIA row 34004 · finalANTIOCH MINE1202372Whitewater Valley1040 · IN · RESPONSIBLE ENERGY, LLC1,75393.2811,1502.8610.20SpotBITTruck
2025-12EIA row 34851 · finalFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC22,96164.2910,6052.3910.90ContractBITRail
2025-11EIA row 31020 · finalANTIOCH MINE1202372Whitewater Valley1040 · IN · RESPONSIBLE ENERGY, LLC1,83795.4411,1502.8610.20SpotBITTruck
2025-11EIA row 31861 · finalFRIENDSVILLE MINE1103064Gibson6113 · IN · PEABODY COAL SALES23,06163.0210,4272.3512.20ContractBITRail
2025-10EIA row 28049 · finalANTIOCH MINE1202372Whitewater Valley1040 · IN · RESPONSIBLE ENERGY, LLC1,90695.4711,1502.8610.20SpotBITTruck
2025-10EIA row 28914 · finalFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC34,26467.3111,1892.508.50ContractBITRail
2025-09EIA row 24978 · finalANTIOCH MINE1202372Whitewater Valley1040 · IN · RESPONSIBLE ENERGY, LLC1,39693.3011,1502.8610.20SpotBITTruck
2025-09EIA row 25846 · finalFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC11,69867.3811,1922.839.90ContractBITRail
2025-08EIA row 21813 · finalANTIOCH MINE1202372Whitewater Valley1040 · IN · RESPONSIBLE ENERGY, LLC1,69793.5711,1502.8610.20SpotBITTruck
2025-08EIA row 22717 · finalFRIENDSVILLE MINE1103064Gibson6113 · IN · RESPONSIBLE ENERGY, LLC11,69365.1210,7892.9511.80ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Friendsville Mine1103064 · Wabash, Illinois194,483———County sales or price not published1 eligible mines / 1 sales respondents
Friendsville Prep Plant1103296 · Wabash, Illinois0———Preparation plant1 eligible mines / 1 sales respondents
Antioch Mine1202372 · Daviess, Indiana408,740———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.