ACTIVE / OPERATOR PORTFOLIO

Renewable Resources

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0052877

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Renewable Resources0405601 · Active6/8 quarters reportedSan Benito, CASurface · MSHA: Construction Sand and Gravel018,00019060.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

19

1 significant & substantial (S&S)

  1. 2025 Q19
  2. 2025 Q22
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q13
  6. 2026 Q20
  7. 2026 Q35
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,114.00

14 of 19 violations with amounts

  1. 2025 Q11,359
  2. 2025 Q2302
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1453
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

60.00

5 inspections · 5 with hours

  1. 2025 Q127.75
  2. 2025 Q24.50
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q113.00
  6. 2026 Q2—
  7. 2026 Q314.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1901,359.0000227.8
2025-Q220302.000014.5
2025-Q300—000—
2025-Q400—000—
2026-Q130453.0000113.0
2026-Q200—000—
2026-Q351—00114.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF034D74
    Renewable Resources · 0405601

    Regular Safety and Health Inspection · 14.8 on-site hours

  2. violation5162484
    Renewable Resources · 0405601

    56.11001 · S&S

  3. violation5162483
    Renewable Resources · 0405601

    56.14109(b)

  4. violation5162482
    Renewable Resources · 0405601

    56.14112(b)

  5. violation5162481
    Renewable Resources · 0405601

    56.14107(a)

  6. violation5162480
    Renewable Resources · 0405601

    56.14107(a)

  7. violation9680959
    Renewable Resources · 0405601

    50.30(a) · $151.00 proposed

  8. violation9680958
    Renewable Resources · 0405601

    50.30(a) · $151.00 proposed

  9. violation9680957
    Renewable Resources · 0405601

    56.14107(a) · $151.00 proposed

  10. inspectionF027C93
    Renewable Resources · 0405601

    Regular Safety and Health Inspection · 13.0 on-site hours

  11. inspectionF027877
    Renewable Resources · 0405601

    Regular Safety and Health Inspection · 4.5 on-site hours

  12. violation9680915
    Renewable Resources · 0405601

    56.4130(b) · $151.00 proposed

  13. violation9680914
    Renewable Resources · 0405601

    56.20003(a) · $151.00 proposed

  14. inspectionF022F27
    Renewable Resources · 0405601

    Compliance Follow-up Inspection · 11.0 on-site hours

  15. violation9999464
    Renewable Resources · 0405601

    56.14201(b) · $151.00 proposed

  16. violation9999463
    Renewable Resources · 0405601

    56.14100(b) · $151.00 proposed

  17. violation9999462
    Renewable Resources · 0405601

    56.14112(b) · $151.00 proposed

  18. violation9999461
    Renewable Resources · 0405601

    56.14107(a) · $151.00 proposed

  19. violation9999460
    Renewable Resources · 0405601

    56.12004 · $151.00 proposed

  20. violation9999459
    Renewable Resources · 0405601

    56.14107(a) · $151.00 proposed

  21. violation9999458
    Renewable Resources · 0405601

    56.14112(b) · $151.00 proposed

  22. violation9999457
    Renewable Resources · 0405601

    56.9300 · $151.00 proposed

  23. violation9999456
    Renewable Resources · 0405601

    56.4130 · $151.00 proposed

  24. inspection6880619
    Renewable Resources · 0405601

    Regular Safety and Health Inspection · 16.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.