← Ramaco Resources, LLC

Ramaco Resources, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Belt air course ventilation.

    violationRecord 9878946
    Berwind Deep Mine · 4609533

    30 CFR 75.350(a)(2) · $549.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 9216721
    Berwind Deep Mine · 4609533

    30 CFR 75.512 · $959.00 proposed penalty

  3. Impoundment Spot Inspection

    inspectionRecord F02D1B5
    Elk Creek Plant · 4602444

    4.0 on-site hours reported

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5097569
    Laurel Fork Mine · 4609084

    30 CFR 75.1731(a) · $432.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5097568
    Laurel Fork Mine · 4609084

    30 CFR 75.400 · $245.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5097567
    Laurel Fork Mine · 4609084

    30 CFR 75.380(d)(1) · $288.00 proposed penalty

  7. Quantity and location of firefighting equipment.

    violationRecord 9216720
    Berwind Deep Mine · 4609533

    30 CFR 75.1100-2(a)(1) · $313.00 proposed penalty

  8. Identification check system.

    violationRecord 9216719
    Berwind Deep Mine · 4609533

    30 CFR 75.1715 · $151.00 proposed penalty

  9. Other safeguards.

    violationRecord 9216718
    Berwind Deep Mine · 4609533

    30 CFR 75.1403

  10. Inspection of fire suppression devices.

    violationRecord 9216717
    Berwind Deep Mine · 4609533

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  11. Maintenance of incombustible content of rock dust.

    violationRecord 9216716
    Berwind Deep Mine · 4609533

    30 CFR 75.403 · $1,550.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5094779
    Crucible Deep Mine · 4609614

    30 CFR 75.202(a) · $151.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5094778
    Crucible Deep Mine · 4609614

    30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F029B7E
    Berwind Deep Mine · 4609533

    103(i) · 9.5 on-site hours reported

  15. Accumulation of combustible materials.

    violationRecord 5097566
    Laurel Fork Mine · 4609084

    30 CFR 75.400 · $642.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5097565
    Laurel Fork Mine · 4609084

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  17. Other safeguards.

    violationRecord 5097564
    Laurel Fork Mine · 4609084

    30 CFR 75.1403 · $165.00 proposed penalty

  18. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5132826
    NO. 2 GAS · 4609541

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  19. On-shift examination.

    violationRecord 5132825
    NO. 2 GAS · 4609541

    30 CFR 75.362(a)(2) · $1,550.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5132824
    NO. 2 GAS · 4609541

    30 CFR 75.370(a)(1) · $2,312.00 proposed penalty

  21. Roof control plan.

    violationRecord 5132823
    NO. 2 GAS · 4609541

    30 CFR 75.220(a)(1) · $6,037.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5132822
    NO. 2 GAS · 4609541

    30 CFR 75.380(b)(1) · $7,084.00 proposed penalty

  23. Identification of circuit breakers.

    violationRecord 5132821
    Crucible Deep Mine · 4609614

    30 CFR 77.904 · $288.00 proposed penalty

  24. Methane monitors.

    violationRecord 5094777
    Crucible Deep Mine · 4609614

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5097563
    Laurel Fork Mine · 4609084

    30 CFR 75.380(d)(7)(vi) · $1,219.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.