ALL STATUSES / OPERATOR PORTFOLIO

R J R Mining Company Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDP21428

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Helms Mine0102833 · AbandonedBlount, ALSurface · MSHA: Coal (Bituminous)——00—
Majestic Mine No. 20102951 · AbandonedJefferson, ALSurface · MSHA: Coal (Bituminous)——00—
Shannon Mine No. 30103523 · NonProducingJefferson, ALSurface · MSHA: Coal (Bituminous)——81109.3

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

8

3 significant & substantial (S&S)

  1. 2025 Q13
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q43
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,283.00

8 of 8 violations with amounts

  1. 2025 Q1883
  2. 2025 Q2—
  3. 2025 Q3517
  4. 2025 Q4883
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

109.25

9 inspections · 9 with hours

  1. 2025 Q131.00
  2. 2025 Q234.00
  3. 2025 Q30.00
  4. 2025 Q432.00
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q312.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q132883.0000231.0
2025-Q200—00134.0
2025-Q320517.001010.0
2025-Q431883.0000332.0
2026-Q100—000—
2026-Q200—000—
2026-Q300—00212.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspection6920749
    Shannon Mine No. 3 · 0103523

    Spot Inspection · 5.3 on-site hours

  2. inspectionF0432F2
    Shannon Mine No. 3 · 0103523

    Regular Safety and Health Inspection · 7.0 on-site hours

  3. inspection6913258
    Shannon Mine No. 3 · 0103523

    Spot Inspection · 0.0 on-site hours

  4. inspection6913257
    Shannon Mine No. 3 · 0103523

    Spot Inspection · 0.0 on-site hours

  5. violation5063544
    Shannon Mine No. 3 · 0103523

    71.206(a) · $366.00 proposed

  6. violation5063543
    Shannon Mine No. 3 · 0103523

    71.206(a) · $151.00 proposed

  7. violation5062005
    Shannon Mine No. 3 · 0103523

    77.410(a)(1) · S&S · $366.00 proposed

  8. inspectionF01C2CB
    Shannon Mine No. 3 · 0103523

    Regular Safety and Health Inspection · 32.0 on-site hours

  9. inspection6913245
    Shannon Mine No. 3 · 0103523

    Spot Inspection · 0.0 on-site hours

  10. violation5063452
    Shannon Mine No. 3 · 0103523

    71.206(a) · $366.00 proposed

  11. violation5063451
    Shannon Mine No. 3 · 0103523

    71.206(a) · $151.00 proposed

  12. accident220252330010
    Shannon Mine No. 3 · 0103523

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Maintenance Employee attempting to loosen bolt/nut on boom/carousel on pump truck when wrench slipped off and the back of the employee's left hand struck sharp edge of plate on top of carousel resulting in a laceration to the back of the left hand.

  13. inspectionF01C2AF
    Shannon Mine No. 3 · 0103523

    Regular Safety and Health Inspection · 34.0 on-site hours

  14. inspectionF014D24
    Shannon Mine No. 3 · 0103523

    Non-Injury Accident Investigation · 1.0 on-site hours

  15. violation9639476
    Shannon Mine No. 3 · 0103523

    71.501 · $151.00 proposed

  16. violation9639475
    Shannon Mine No. 3 · 0103523

    77.1710(i) · S&S · $366.00 proposed

  17. violation9639474
    Shannon Mine No. 3 · 0103523

    77.1710(i) · S&S · $366.00 proposed

  18. inspectionF014D19
    Shannon Mine No. 3 · 0103523

    Regular Safety and Health Inspection · 30.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS296,3606 rows · 1 receiving plants
HEAT CONTENT · BTU/LB12,032Weighted by reported tons
SULFUR / ASH · % BY WEIGHT1.34 / 14.97Separate averages over measured receipts
DELIVERED COST · USD/TON164.24100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *53,01612,1991.3014.40161.64
2025-Q4179,72212,0431.3515.13165.11
2026-Q163,62211,8591.3315.00163.97
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-02EIA row 2026 · preliminarySHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE10,586164.8611,9381.4115.00ContractBITRail
2026-01EIA row 8 · preliminarySHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE53,036163.8011,8441.3115.00ContractBITRail
2025-12EIA row 33796 · finalSHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE52,699162.0511,9331.3915.20ContractBITRail
2025-11EIA row 30815 · finalSHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE74,219165.7311,9921.3315.10ContractBITRail
2025-10EIA row 27838 · finalSHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE52,804167.2912,2261.3415.10ContractBITRail
2025-09EIA row 24756 · finalSHANNON MINE NO. 30103523E C Gaston26 · AL · ALABAMA COAL COOPERATIVE53,016161.6412,1991.3014.40ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON205.24Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS246,187Allocated from published county sales
ESTIMATED COAL REVENUE · USD50,527,349Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Shannon Mine No. 30103523 · Jefferson, Alabama234,625205.24246,18750,527,349County allocation estimate2.79% of eligible county production4 eligible mines / 4 sales respondents
Helms Mine0102833 · Location unavailable————No matching annual production record
Majestic Mine No. 20102951 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.