Coal production
94,517,648reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| North Antelope Rochelle Mine4801353 · Active6/8 quarters reported | Campbell, WYSurface · MSHA: Coal (Bituminous) | 94,517,648 | 4,006,331 | 152 | 42 | 1,227.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 15,191,057 | 602,326 | 25.22 | 1,141 | 1/1 mines reporting |
| 2025 Q2 | 15,252,579 | 611,869 | 24.93 | 1,126 | 1/1 mines reporting |
| 2025 Q3 | 17,112,890 | 624,358 | 27.41 | 1,141 | 1/1 mines reporting |
| 2025 Q4 | 17,396,197 | 647,061 | 26.88 | 1,184 | 1/1 mines reporting |
| 2026 Q1 | 17,053,359 | 768,369 | 22.19 | 1,208 | 1/1 mines reporting |
| 2026 Q2 | 12,511,566 | 752,348 | 16.63 | 1,213 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
30 significant & substantial (S&S)
0 records classified as fatality
149 of 152 violations with amounts
20 inspections · 20 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 0 | 0 | — | 3 | 0 | 1 | 6.5 |
| 2025-Q2 | 39 | 6 | 33,962.00 | 5 | 0 | 4 | 378.5 |
| 2025-Q3 | 7 | 4 | 28,736.00 | 4 | 0 | 5 | 40.3 |
| 2025-Q4 | 27 | 8 | 135,279.00 | 8 | 0 | 5 | 408.5 |
| 2026-Q1 | 32 | 5 | 20,796.00 | 7 | 0 | 1 | 2.0 |
| 2026-Q2 | 16 | 4 | 6,610.00 | 12 | 0 | 3 | 378.3 |
| 2026-Q3 | 31 | 3 | 12,848.00 | 3 | 0 | 1 | 13.3 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
MACHINERY · DAYS AWAY FROM WORK ONLY
Employee began to feel pain in EE's lower back after hitting a rough spot while operating a track dozer. Upon an ORTHO visit on 06-10-2026 EE was given a restriction for no work. There was no treatment or PT prescribed.
77.502-2 · $245.00 proposed
77.1710(a) · S&S · $818.00 proposed
Regular Safety and Health Inspection · 359.3 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was loading a new excavator bucket tooth into the back of EE's service pickup and pinched EE's pinky finger causing a small avulsion that required 3 sutures.
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
Employee was moving an oxygen bottle from working skid to the storage skid when another bottle moved pinching left index finger between the two bottles causing a fracture of tip of the left index finger.
Compliance Follow-up Inspection · 16.0 on-site hours
SLIP OR FALL OF PERSON · DAYS RESTRICTED ACTIVITY ONLY
Employee was in the process of removing a hydraulic hand pump and jack from the top of the tub base and hung EE's foot on a hose and fell forward and EE's thumb on the left hand was caught between pump and ram which caused a fracture of the first joint of the left thumb.
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was using a pry bar to unplug a clogged bit on a blast hole drill. Once the clogged bit was free of material, the employee dropped the pry bar onto EE's foot which contacted EE's foot in between the safety toe and the met guard of the boot causing a superficial fracture to EE's big toe.
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Technician pinched EE's hand while using an air impact gun causing a laceration that required stitches.
103 (g) Written Notification Hazard Complaint Inspectio · 3.0 on-site hours
FIRE · ACCIDENT ONLY
A train started a grass fire on the outskirts of the mine and was not extinguished within 30 minutes of discovery.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee pinched a finger while changing a return idler on the belt line causing a laceration requiring stitches.
OTHER · INJURIES DUE TO NATURAL CAUSES
Employee experienced a medical emergency while at the mine site. The employee then fell to the floor from a leaning position. The employee was transported via county EMS for further care.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
IE experienced left hip and back pain after loading drill on hauler. After loading drill, fell from desk of heavy haul trailer. IE had follow up visit on 4-22-26 and was diagnosed with a possible pinched nerve and was prescribed physical therapy and a steroid. IE was never restricted to do EE's job.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
IE tripped and fell on shoulder, after Orthopedic appointment on 4-21-26 was diagnosed with rotator cuff injury that will require surgery
77.410(c) · $504.00 proposed
77.1605(b) · $504.00 proposed
77.1605(b) · $504.00 proposed
77.1710(i) · $313.00 proposed
77.404(a) · $642.00 proposed
77.1605(b) · $504.00 proposed
77.502 · $398.00 proposed
77.1607(r) · $1,219.00 proposed
OTHER · DAYS AWAY FROM WORK ONLY
Employee twisted while changing hydraulic filters and began to feel a pain in their knee. later they asked to be checked out and was seen at the ER. An ORTHO appointment on 03/26/2026 revealed a torn ACL and they were given a restriction.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 11,228,654 | 8,830 | 0.21 | 4.45 | 36.11 | |
| 2025-Q4 | 17,440,097 | 8,882 | 0.21 | 4.43 | 35.31 | |
| 2026-Q1 | 16,826,045 | 8,909 | 0.20 | 4.44 | 39.32 | |
| 2026-Q2 | 12,636,431 | 8,867 | 0.21 | 4.44 | 38.40 | |
| 2026-Q3 * | 4,727,275 | 8,837 | 0.20 | 4.40 | 38.76 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11389 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Comanche (CO)470 · CO · PEABODY COAL SALES | 14,012 | 32.91 | 8,947 | 0.19 | 4.20 | ContractSUB | Rail |
| 2026-07EIA row 11457 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Kincaid Generation LLC876 · IL · PEABODY COAL SALES | 46,617 | —Not published | 8,908 | 0.20 | 4.50 | ContractSUB | Rail |
| 2026-07EIA row 11458 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Powerton879 · IL · COALSALES LLC | 101,449 | —Not published | 8,740 | 0.20 | 4.50 | ContractSUB | Rail |
| 2026-07EIA row 11463 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Baldwin Energy Complex889 · IL · DYNEGY COAL TRANDING AND TRANSPORTATION | 190,973 | —Not published | 8,965 | 0.20 | 4.20 | ContractSUB | Rail |
| 2026-07EIA row 11496 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Michigan City997 · IN · PEABODY COAL SALES | 60,662 | 44.34 | 9,005 | 0.20 | 4.60 | ContractSUB | Rail |
| 2026-07EIA row 11532 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | La Cygne1241 · KS · PEABODY COAL SALES | 16,456 | 30.24 | 8,730 | 0.21 | 5.20 | SpotSUB | Rail |
| 2026-07EIA row 11534 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | La Cygne1241 · KS · PEABODY COAL SALES | 16,415 | 29.39 | 8,832 | 0.20 | 4.10 | SpotSUB | Rail |
| 2026-07EIA row 11538 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | La Cygne1241 · KS · PEABODY COAL SALES | 65,170 | 29.34 | 8,875 | 0.19 | 4.30 | SpotSUB | Rail |
| 2026-07EIA row 11542 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Lawrence Energy Center1250 · KS · PEABODY COAL SALES | 46,267 | 39.62 | 8,792 | 0.20 | 4.50 | SpotSUB | Rail |
| 2026-07EIA row 11585 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | R S Nelson1393 · LA · PEABODY COAL SALES | 30,152 | 40.88 | 8,895 | 0.20 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11632 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | J H Campbell1710 · MI · COAL SALES | 31,550 | 53.75 | 8,893 | 0.20 | 4.50 | SpotSUB | Rail |
| 2026-07EIA row 11638 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Monroe (MI)1733 · MI · PEABODY COAL SALES | 220,407 | 41.76 | 8,908 | 0.19 | 4.40 | ContractSUB | Rail |
| 2026-07EIA row 11649 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Allen S King1915 · MN · PEABODY COAL SALES | 26,856 | 43.07 | 8,812 | 0.20 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11650 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Allen S King1915 · MN · PEABODY COAL SALES | 12,992 | 43.16 | 8,775 | 0.20 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11667 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Hawthorn2079 · MO · PEABODY COAL SALES | 32,061 | 27.67 | 8,779 | 0.21 | 4.50 | SpotSUB | Truck |
| 2026-07EIA row 11668 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Hawthorn2079 · MO · PEABODY COAL SALES | 48,868 | 27.72 | 8,867 | 0.19 | 4.60 | SpotSUB | Truck |
| 2026-07EIA row 11670 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Hawthorn2079 · MO · PEABODY COAL SALES | 16,440 | 26.64 | 8,899 | 0.19 | 4.00 | SpotSUB | Truck |
| 2026-07EIA row 11673 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Labadie2103 · MO · PEABODY COAL SALES | 138,041 | 28.90 | 8,875 | 0.20 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11674 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Labadie2103 · MO · PEABODY COAL SALES | 155,674 | 30.99 | 8,915 | 0.19 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11675 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Labadie2103 · MO · PEABODY COAL SALES | 173,209 | 29.40 | 8,825 | 0.20 | 4.30 | ContractSUB | Rail |
| 2026-07EIA row 11679 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Sioux2107 · MO · PEABODY COAL SALES | 16,146 | 40.61 | 8,805 | 0.18 | 4.60 | ContractSUB | Rail |
| 2026-07EIA row 11682 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | New Madrid2167 · MO · PEABODY COAL TRADE | 17,521 | 46.86 | 8,861 | 0.20 | 4.70 | ContractSUB | Rail |
| 2026-07EIA row 11684 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Thomas Hill2168 · MO · PEABODY COAL TRADE | 263,063 | 42.68 | 8,785 | 0.20 | 4.40 | ContractSUB | Rail |
| 2026-07EIA row 11686 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Sheldon2277 · NE · BLUEGRASS COMMODITIES LP | 102,797 | 27.61 | 8,563 | 0.31 | 4.60 | ContractSUB | Rail |
| 2026-07EIA row 11793 · preliminary | NORTH ANTELOPE ROCHELLE MINE4801353 | Muskogee2952 · OK · PEABODY COAL SALES | 42,919 | 41.81 | 8,695 | 0.19 | 4.80 | ContractSUB | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. All producing annual records in this selection have estimates. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| North Antelope Rochelle Mine4801353 · Campbell, Wyoming | 59,793,304 | 13.96 | 59,788,773 | 834,651,264 | County allocation estimate35.16% of eligible county production11 eligible mines / 11 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.