Peabody Gateway North Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Preshift examination at fixed intervals.
Gateway North Mine · 110323530 CFR 75.360(a)(1) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
Gateway North Mine · 110323530 CFR 75.202(a) · Significant and substantial (S&S)
Roof control plan.
Gateway North Mine · 110323530 CFR 75.220(a)(1)
Slip or fall of person
Gateway North Mine · 1103235Days away from work only
Accident narrative
IE was getting out of mantrip and stepped in a hole covered with rock dust, hurting right knee.
Protection from falls of roof, face and ribs.
Gateway North Mine · 110323530 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Mine ventilation plan; submission and approval.
Gateway North Mine · 110323530 CFR 75.370(a)(1) · $336.00 proposed penalty
Ventilation controls.
Gateway North Mine · 110323530 CFR 75.333(d)(3) · $151.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $465.00 proposed penalty
Maintenance of incombustible content of rock dust.
Gateway North Mine · 110323530 CFR 75.403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
Gateway North Mine · 110323530 CFR 75.403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
Gateway North Mine · 110323530 CFR 75.403 · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
Gateway North Mine · 110323530 CFR 75.503 · $336.00 proposed penalty
Roof control plan.
Gateway North Mine · 110323530 CFR 75.220(a)(1) · $366.00 proposed penalty
Accumulation of combustible materials.
Gateway North Mine · 110323530 CFR 75.400 · $504.00 proposed penalty
Drill dust control at underground areas of underground mines.
Gateway North Mine · 110323530 CFR 72.630(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Spot Inspections
Gateway North Mine · 1103235103(i) · 6.5 on-site hours reported
Mine ventilation plan; submission and approval.
Gateway North Mine · 110323530 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Gateway North Mine · 110323530 CFR 75.512 · $245.00 proposed penalty
Installation of high-voltage transmission cables.
Gateway North Mine · 110323530 CFR 75.807 · $226.00 proposed penalty
Rock dusting.
Gateway North Mine · 110323530 CFR 75.402 · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
Gateway North Mine · 110323530 CFR 75.503 · $336.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
Gateway North Mine · 110323530 CFR 75.1107-4(c) · $226.00 proposed penalty
Permanent splicing of trailing cables.
Gateway North Mine · 110323530 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Maintenance of diesel-powered equipment.
Gateway North Mine · 110323530 CFR 75.1914(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Spot Inspections
Gateway North Mine · 1103235103(i) · 5.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.