Coal production
7,221,763reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Bear Run Mine1202422 · Active6/8 quarters reported | Sullivan, INSurface · MSHA: Coal (Bituminous) | 7,221,763 | 1,702,169 | 51 | 14 | 1,108.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 1,285,795 | 257,035 | 5.00 | 494 | 1/1 mines reporting |
| 2025 Q2 | 1,093,793 | 266,024 | 4.11 | 513 | 1/1 mines reporting |
| 2025 Q3 | 1,031,724 | 300,570 | 3.43 | 518 | 1/1 mines reporting |
| 2025 Q4 | 1,243,592 | 287,006 | 4.33 | 511 | 1/1 mines reporting |
| 2026 Q1 | 1,351,596 | 291,366 | 4.64 | 506 | 1/1 mines reporting |
| 2026 Q2 | 1,215,263 | 300,168 | 4.05 | 540 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
21 significant & substantial (S&S)
0 records classified as fatality
35 of 51 violations with amounts
10 inspections · 10 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 3 | 0 | 1,629.00 | 5 | 0 | 0 | — |
| 2025-Q2 | 2 | 0 | 316.00 | 0 | 0 | 2 | 356.3 |
| 2025-Q3 | 2 | 0 | 328.00 | 3 | 0 | 0 | — |
| 2025-Q4 | 0 | 0 | — | 1 | 0 | 1 | 316.5 |
| 2026-Q1 | 7 | 3 | 4,381.00 | 1 | 0 | 2 | 14.0 |
| 2026-Q2 | 7 | 1 | 1,157.00 | 3 | 0 | 1 | 397.3 |
| 2026-Q3 | 30 | 17 | 18,878.00 | 1 | 0 | 3 | 24.3 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
All violations issued in the selected period. Counts combine subsections.
77.604 · $245.00 proposed
77.1606(c) · $151.00 proposed
DISORDERS (REPEATED TRAUMA) · OCCUPATNAL ILLNESS NOT DEG 1-6
The mobile equipment operator began experiencing nighttime shoulder pain, attributed to years of repetitive work and movements required to mount, dismount, and operate equipment. After consultation, diagnostics revealed degenerative changes in the shoulder, which required surgery on 02/06/26
77.1606(c) · $151.00 proposed
77.400(a) · S&S · $1,219.00 proposed
77.502 · S&S · $1,219.00 proposed
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
IE was holding a bolt w/pliers while another person used a grinder w/cutting wheel. The grinder kicked back and cut IE between thumb & finger requiring 6 stitches to close wound.
Regular Safety and Health Inspection · 316.5 on-site hours
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
CMW in personal vehicle was pulling up and turning to the left preparing to stop and back in to a parking spot. Before EE came to a stop, EE's truck struck another person walking across the lot that EE did not see. IE was taken to local ER and kept overnight for observation.
77.1606(c) · $151.00 proposed
77.502 · $177.00 proposed
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
IE was using soft face sledge hammer and wearing face shield & puncture resistant coat while striking a bucket tooth to remove it. A small piece of metal struck IE's chin which required removal in ER and 2 stitches to close cut
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
IE was greasing components on screen bowl. While pulling on drive belt to turn components, EE's pinky finger was pinched between belt and pulley requiring 5 stitches to close cut.
77.1607(d) · $165.00 proposed
Verbal Hazard Complaint Inspections · 5.5 on-site hours
77.1605(k) · $151.00 proposed
Regular Safety and Health Inspection · 350.8 on-site hours
77.1109(c)(1) · $165.00 proposed
DISORDERS (REPEATED TRAUMA) · OCCUPATNAL ILLNESS NOT DEG 1-6
CHPP employee reported on 3/12/25 that EE was experiencing right shoulder discomfort while performing routine motions and tasks, void of any stressors. During initial consult it was learned that IE had a previous R shoulder surgical repair for similar complaints. Diagnostics revealed degenerative changes to that same shoulder with no new acute damage. Surgical repair on 4/25/25.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
IE was climbing out of cable truck and fell after IE's foot became stuck on the step. IE fell onto right wrist which caused a hairline fracture.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
IE went under parked haul truck to check it out & got hydraulic oil into both eyes. IE received Rx eye drops and was not released to return to work
72.620 · $245.00 proposed
77.502 · $1,219.00 proposed
MACHINERY · DAYS RESTRICTED ACTIVITY ONLY
IE was using an electric grinder that became entangled w/IE's welding coat sleeve. Before the grinder stopped it cut IE's wrist which needed a few stitches to close.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Mobile maintenance greaser/oiler reported on 01/13/25 that they noticed a noise in their shoulder, void of any pain or discomfort. During consultation it was learned the the EE had a previous right shoulder surgical repair. Diagnostics revealed degenerative changes to the same shoulder from years of repetitive motion and overhead work. Surgical repair was performed on 07/11/2025.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 925,538 | 11,035 | 2.75 | 9.81 | 56.55 | |
| 2025-Q4 | 1,556,371 | 11,037 | 2.77 | 9.73 | 58.19 | |
| 2026-Q1 | 1,023,012 | 11,041 | 2.74 | 9.98 | 64.37 | |
| 2026-Q2 | 911,732 | 11,062 | 2.89 | 10.46 | 66.08 | |
| 2026-Q3 * | 367,096 | 11,025 | 2.77 | 10.37 | 77.58 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11452 · preliminary | BEAR RUN MINE1202422 | Bowen703 · GA · PEABODY COAL SALES, LLC | 25,746 | 86.44 | 11,051 | 1.95 | 8.50 | ContractBIT | Rail |
| 2026-07EIA row 11500 · preliminary | BEAR RUN MINE1202422 | Cayuga1001 · IN · PEABODY COAL SALES | 123,387 | 80.58 | 11,017 | 2.90 | 10.40 | ContractBIT | Rail |
| 2026-07EIA row 11502 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 105,252 | 70.46 | 11,075 | 3.17 | 10.90 | ContractBIT | Rail |
| 2026-07EIA row 12121 · preliminary | BEAR RUN MINE1202422 | Gibson6113 · IN · PEABODY COAL SALES | 96,907 | 79.16 | 10,979 | 2.18 | 9.90 | ContractBIT | Rail |
| 2026-07EIA row 12633 · preliminary | BEAR RUN MINE1202422 | Archer Daniels Midland Decatur10865 · IL · PEABODY COAL SALES | 15,804 | —Not published | 11,000 | 4.00 | 12.50 | SpotBIT | Rail |
| 2026-06EIA row 9551 · preliminary | BEAR RUN MINE1202422 | Bowen703 · GA · PEABODY COAL SALES, LLC | 12,853 | 86.44 | 11,052 | 1.95 | 8.50 | ContractBIT | Rail |
| 2026-06EIA row 9615 · preliminary | BEAR RUN MINE1202422 | Cayuga1001 · IN · PEABODY COAL SALES | 128,594 | 70.31 | 11,083 | 3.10 | 10.60 | ContractBIT | Rail |
| 2026-06EIA row 9617 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 23,357 | 60.49 | 11,218 | 3.42 | 10.30 | ContractBIT | Rail |
| 2026-06EIA row 10214 · preliminary | BEAR RUN MINE1202422 | Gibson6113 · IN · PEABODY COAL SALES | 124,811 | 68.38 | 11,029 | 2.17 | 9.70 | ContractBIT | Rail |
| 2026-06EIA row 10278 · preliminary | BEAR RUN MINE1202422 | Merom6213 · IN · PEABODY COAL SALES | 40,896 | 53.35 | 10,955 | 3.22 | 10.80 | ContractBIT | Rail / Truck |
| 2026-05EIA row 7752 · preliminary | BEAR RUN MINE1202422 | Bowen703 · GA · PEABODY COAL SALES, LLC | 12,879 | 85.58 | 11,052 | 1.95 | 8.50 | ContractBIT | Rail |
| 2026-05EIA row 7805 · preliminary | BEAR RUN MINE1202422 | Cayuga1001 · IN · PEABODY COAL SALES | 123,042 | 69.76 | 11,070 | 3.26 | 10.90 | ContractBIT | Rail |
| 2026-05EIA row 7807 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 35,104 | 60.42 | 11,034 | 3.21 | 10.90 | ContractBIT | Rail |
| 2026-05EIA row 8414 · preliminary | BEAR RUN MINE1202422 | Merom6213 · IN · PEABODY COAL SALES | 41,098 | 53.62 | 10,930 | 3.13 | 10.80 | ContractBIT | Rail / Truck |
| 2026-04EIA row 5929 · preliminary | BEAR RUN MINE1202422 | Bowen703 · GA · PEABODY COAL SALES, LLC | 12,863 | 85.32 | 11,052 | 1.95 | 8.50 | ContractBIT | Rail |
| 2026-04EIA row 5978 · preliminary | BEAR RUN MINE1202422 | Cayuga1001 · IN · PEABODY COAL SALES | 116,113 | 70.21 | 11,050 | 2.96 | 10.90 | ContractBIT | Rail |
| 2026-04EIA row 5980 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 140,459 | 60.56 | 11,149 | 3.15 | 10.80 | ContractBIT | Rail |
| 2026-04EIA row 6554 · preliminary | BEAR RUN MINE1202422 | Gibson6113 · IN · PEABODY COAL SALES | 69,103 | 66.49 | 11,067 | 2.24 | 9.70 | ContractBIT | Rail |
| 2026-04EIA row 6614 · preliminary | BEAR RUN MINE1202422 | Merom6213 · IN · PEABODY COAL SALES | 30,560 | 52.52 | 10,950 | 3.25 | 10.90 | ContractBIT | Rail / Truck |
| 2026-03EIA row 4082 · preliminary | BEAR RUN MINE1202422 | Bowen703 · GA · PEABODY COAL SALES, LLC | 12,871 | 84.08 | 11,000 | 2.00 | 8.00 | ContractBIT | Rail |
| 2026-03EIA row 4162 · preliminary | BEAR RUN MINE1202422 | Cayuga1001 · IN · PEABODY COAL SALES | 185,726 | 69.71 | 11,037 | 3.04 | 10.50 | ContractBIT | Rail |
| 2026-03EIA row 4165 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 11,253 | 56.19 | 11,095 | 2.65 | 10.10 | ContractBIT | Rail |
| 2026-03EIA row 4166 · preliminary | BEAR RUN MINE1202422 | Edwardsport1004 · IN · PEABODY COAL SALES | 131,250 | 60.53 | 11,010 | 3.05 | 10.60 | ContractBIT | Rail |
| 2026-03EIA row 4729 · preliminary | BEAR RUN MINE1202422 | Gibson6113 · IN · PEABODY COAL SALES | 96,714 | 67.42 | 11,038 | 1.94 | 9.00 | ContractBIT | Rail |
| 2026-03EIA row 4791 · preliminary | BEAR RUN MINE1202422 | Merom6213 · IN · PEABODY COAL SALES | 30,496 | 51.45 | 11,040 | 3.25 | 10.80 | ContractBIT | Rail / Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Bear Run Mine1202422 · Sullivan, Indiana | 4,957,450 | — | — | — | County sales or price not published1 eligible mines / 1 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.