Coal production
0reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Capitol Sand4700788 · Active6/8 quarters reported | Dane, WISurface · MSHA: Construction Sand and Gravel | 0 | 13,029 | 3 | 1 | 21.3 |
| DL-24703654 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 239 | 0 | 1 | 7.5 |
| Midwest Aggregates1101306 · Intermittent5/8 quarters reported | Lake, ILSurface · MSHA: Construction Sand and Gravel | 0 | 5,239 | 1 | 0 | 6.0 |
| PC14700868 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 9,936 | 0 | 1 | 9.8 |
| PC104703445 · Active6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 11,685 | 3 | 0 | 21.8 |
| PC2 Franklin Aggregates4700060 · Active6/8 quarters reported | Milwaukee, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 55,125 | 11 | 4 | 103.3 |
| PC44702968 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 7,642 | 0 | 1 | 4.8 |
| PC-52003115 · Intermittent6/8 quarters reported | Delta, MISurface · MSHA: Construction Sand and Gravel | 0 | 11,680 | 0 | 0 | 11.0 |
| PC94703444 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 4,676 | 1 | 0 | 8.0 |
| PW104703619 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Construction Sand and Gravel | 0 | 2,355 | 0 | 0 | 8.8 |
| PW44703018 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 2,462 | 1 | 0 | 13.3 |
| PW54703325 · Intermittent6/8 quarters reported | Waukesha, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 4,623 | 0 | 0 | 7.8 |
| PW-72003293 · Intermittent6/8 quarters reported | Iron, MISurface · MSHA: Construction Sand and Gravel | 0 | 629 | 0 | 1 | 5.0 |
| PW-82003376 · Intermittent6/8 quarters reported | Iron, MISurface · MSHA: Construction Sand and Gravel | 0 | 5,541 | 1 | 0 | 8.3 |
| Racine Quarry4701140 · Active6/8 quarters reported | Racine, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 30,987 | 0 | 1 | 47.3 |
| Waukesha Lime & Stone4700235 · Active6/8 quarters reported | Waukesha, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 56,570 | 7 | 1 | 112.8 |
| Delta County Pits2002694 · Abandoned | Delta, MISurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| DL-14703653 · Abandoned6/8 quarters reported | Racine, WISurface · MSHA: Construction Sand and Gravel | 0 | 0 | 0 | 0 | 3.3 |
| DR-14703722 · Abandoned | Waukesha, WISurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| Franklin Aggregates4700216 · Abandoned | Milwaukee, WISurface · MSHA: Crushed, Broken Limestone NEC | — | — | 0 | 0 | — |
| Haen Pit Or Haen Quarry4701478 · Abandoned | Dane, WISurface · MSHA: Crushed, Broken Limestone NEC | — | — | 0 | 0 | — |
| PC-162002464 · Abandoned | Delta, MISurface · MSHA: Crushed, Broken Stone NEC | — | — | 0 | 0 | — |
| PC-64703503 · Abandoned | Waukesha, WISurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
| PW14702905 · Temporarily Idled6/8 quarters reported | Waukesha, WISurface · MSHA: Crushed, Broken Limestone NEC | 0 | 0 | 0 | 0 | 1.3 |
| State Sand & Gravel Wash Plant4700992 · Abandoned | Waukesha, WISurface · MSHA: Construction Sand and Gravel | — | — | 0 | 0 | — |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
20 of 25 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 25 mines listed under this operator were checked; 18 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 27,240 | 0.00 | 56 | 18/18 mines reporting |
| 2025 Q2 | 0 | 44,153 | 0.00 | 87 | 18/18 mines reporting |
| 2025 Q3 | 0 | 50,442 | 0.00 | 103 | 18/18 mines reporting |
| 2025 Q4 | 0 | 34,759 | 0.00 | 70 | 18/18 mines reporting |
| 2026 Q1 | 0 | 26,141 | 0.00 | 56 | 18/18 mines reporting |
| 2026 Q2 | 0 | 39,683 | 0.00 | 80 | 17/18 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
4 significant & substantial (S&S)
0 records classified as fatality
27 of 28 violations with amounts
48 inspections · 48 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 6 | 2 | 1,202.00 | 2 | 0 | 5 | 48.5 |
| 2025-Q2 | 3 | 1 | 1,428.00 | 5 | 0 | 6 | 38.0 |
| 2025-Q3 | 8 | 1 | 2,169.00 | 1 | 0 | 10 | 83.5 |
| 2025-Q4 | 0 | 0 | — | 0 | 0 | 4 | 41.5 |
| 2026-Q1 | 5 | 0 | 755.00 | 0 | 0 | 8 | 80.8 |
| 2026-Q2 | 0 | 0 | — | 2 | 0 | 1 | 17.0 |
| 2026-Q3 | 6 | 0 | 755.00 | 1 | 0 | 14 | 91.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 31.3 on-site hours
Regular Safety and Health Inspection · 6.5 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
EE was performing site maintenance, driving a skid steer, when EE went to exit EE felt pain in EE's lower left back. Employee sought medical treatment on 8/18/25, where EE was ordered to do PT. Reporting within 10 days.
Regular Safety and Health Inspection · 4.8 on-site hours
Mine Idle Activity · 1.3 on-site hours
47.44(b) · $151.00 proposed
Regular Safety and Health Inspection · 4.8 on-site hours
56.11001 · $151.00 proposed
Regular Safety and Health Inspection · 23.8 on-site hours
Regular Safety and Health Inspection · 4.3 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee performing maintenance on drag line brakes. Struck RT arm on expanded metal guard which caused a laceration. Employee sought medical treatment same day, received sutures. Reporting within 10 days.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee had a pain in EE's right shoulder after working, EE was unsure what work task caused the injury. Over the span of two weeks the pain became worse, so EE sought medical treatment. On 7/11/25 we were informed the EE was Dx with a small rotator cuff tear. Reporting within 10 days.
STRIKING OR BUMPING · ALL OTHER CASES (INCL 1ST AID)
EE was performing maintenance on a screen. While switching hard hats, they turned and struck their head on a bracket, causing a laceration. EE sought med. treatment, where they used medical glue to close the wound. Reporting within 10 days.
Regular Safety and Health Inspection · 4.5 on-site hours
56.12028 · $151.00 proposed
56.11001 · S&S · $1,126.00 proposed
Regular Safety and Health Inspection · 7.5 on-site hours
Special Emphasis Programs · 0.8 on-site hours
Regular Safety and Health Inspection · 5.8 on-site hours
Regular Safety and Health Inspection · 15.0 on-site hours
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was performing maintenance on conveyor belt. While removing a bearing with a mallet, a piece of metal broke off, became embedded into the EE's right pec. On 5/13/25 we were notified the employee had a piece of metal removed and was able to continue working. Reporting within 10 days.
Regular Safety and Health Inspection · 4.5 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was sampling 5" select larger stones which involves shoveling, carrying & loading buckets to a tailgate. on 05/09/2025 we were notified the Employee sought treatment and was prescribed PT. Reporting within 10 days.
56.14105 · $151.00 proposed
Regular Safety and Health Inspection · 8.0 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.