Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Installation of high-voltage transmission cables.
Winchester 2 · 460961530 CFR 75.807 · $549.00 proposed penalty
Storage of materials.
Maple Eagle No. 1 Mine · 460423630 CFR 77.208(e) · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Automatic fire warning devices; actions and response.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1103-5(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1731(b) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $398.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $1,219.00 proposed penalty
Other safeguards.
Speed Mine · 460543730 CFR 75.1403 · Significant and substantial (S&S) · $6,540.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
Speed Mine · 460543730 CFR 75.1002(a) · $883.00 proposed penalty
Condition and examination of firefighting equipment.
Speed Mine · 460543730 CFR 75.1100-3 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(f)(3) · $151.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Verbal Hazard Complaint Inspections
Speed Mine · 460543738.5 on-site hours reported
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,968.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $818.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $1,126.00 proposed penalty
Protection from falls of roof, face and ribs.
Maple Eagle No. 1 Mine · 460423630 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $336.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(d)(3) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.