Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 9848953
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 9848952
    Speed Mine · 4605437

    30 CFR 75.202(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9848951
    Speed Mine · 4605437

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  4. Installation of high-voltage transmission cables.

    violationRecord 9840114
    Winchester 2 · 4609615

    30 CFR 75.807 · $549.00 proposed penalty

  5. Storage of materials.

    violationRecord 9849657
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 77.208(e) · $267.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 9849278
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  7. Other safeguards.

    violationRecord 9849277
    Speed Mine · 4605437

    30 CFR 75.1403 · Significant and substantial (S&S) · $6,540.00 proposed penalty

  8. Automatic fire warning devices; actions and response.

    violationRecord 9849656
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1103-5(a) · $151.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9841359
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(b) · $151.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9849275
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 9849274
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  12. Roof control plan.

    violationRecord 9849276
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $1,219.00 proposed penalty

  13. Other safeguards.

    violationRecord 9849273
    Speed Mine · 4605437

    30 CFR 75.1403 · Significant and substantial (S&S) · $6,540.00 proposed penalty

  14. Installation of electric equipment and conductors; permissibility.

    violationRecord 9848602
    Speed Mine · 4605437

    30 CFR 75.1002(a) · $883.00 proposed penalty

  15. Condition and examination of firefighting equipment.

    violationRecord 9848601
    Speed Mine · 4605437

    30 CFR 75.1100-3 · $151.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9848600
    Speed Mine · 4605437

    30 CFR 75.370(f)(3) · $151.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F00FEEA
    Speed Mine · 4605437

    103(i) · 5.0 on-site hours reported

  18. Verbal Hazard Complaint Inspections

    inspectionRecord 6320437
    Speed Mine · 4605437

    38.5 on-site hours reported

  19. Mine ventilation plan; submission and approval.

    violationRecord 9847909
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 9847908
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,968.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9847907
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  22. Roof control plan.

    violationRecord 9847906
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $1,126.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9841358
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  24. Roof control plan.

    violationRecord 9841357
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  25. Ventilation controls.

    violationRecord 9841356
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.