Panther Creek Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulations of combustible materials.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.1104 · $151.00 proposed penalty
Travelways at surface installations.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.205(b) · Significant and substantial (S&S) · $398.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 4.0 on-site hours reported
Mine map.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1200(h) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(b) · Significant and substantial (S&S) · $592.00 proposed penalty
Non-Injury Accident Investigation
Maple Eagle No. 1 Mine · 460423622.8 on-site hours reported
Violation — cited standard not reported
Maple Eagle No. 1 Mine · 4604236Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Temporary notations, revisions, and supplements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1202 · $151.00 proposed penalty
Rock dusting.
Maple Eagle No. 1 Mine · 460423630 CFR 75.402 · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $193.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Weekly examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.364(g) · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $267.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Speed Mine · 460543730 CFR 75.1731(a) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $288.00 proposed penalty
Sampling; general and technical requirements.
Coal Clean Prep Plant · 460857130 CFR 71.201(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 77.1606(c) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.