← Panther Creek Mining LLC

Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5022838
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  2. Cable fittings; suitability.

    violationRecord 5026259
    Speed Mine · 4605437

    30 CFR 75.515 · $288.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5026258
    Speed Mine · 4605437

    30 CFR 75.503 · $432.00 proposed penalty

  4. Handling of materials

    accidentRecord 220252310016
    Speed Mine · 4605437

    No dys awy frm wrk,no rstr act

    Accident narrative

    Injured employee was in the process of closing air lock doors at the mouth of the section when left hand was caught between the doors. This caused a laceration on the left index finger, resulting in 8 sutures.

  5. On-shift examination.

    violationRecord 5025146
    Speed Mine · 4605437

    30 CFR 75.362(a)(2) · $3,022.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5025145
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $9,757.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5025144
    Speed Mine · 4605437

    30 CFR 75.503 · $2,503.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5025143
    Speed Mine · 4605437

    30 CFR 75.202(a) · $165.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5020355
    Winchester 2 · 4609615

    30 CFR 75.512 · $165.00 proposed penalty

  10. Air quality.

    violationRecord 5020354
    Winchester 2 · 4609615

    30 CFR 75.321(a)(1) · $165.00 proposed penalty

  11. Installation of water sprinkler systems; requirements.

    violationRecord 5029803
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1101-7(c) · $151.00 proposed penalty

  12. Ventilation controls.

    violationRecord 5020353
    Winchester 2 · 4609615

    30 CFR 75.333(h) · $165.00 proposed penalty

  13. Roof bolting.

    violationRecord 5020352
    Winchester 2 · 4609615

    30 CFR 75.204(f)(7) · $165.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5029802
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  15. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5029801
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1101-10 · $151.00 proposed penalty

  16. Spot Inspection

    inspectionRecord F014019
    Coal Clean Prep Plant · 4608571

    3.3 on-site hours reported

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5022834
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $465.00 proposed penalty

  18. Ventilation controls.

    violationRecord 5022833
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  19. Roof control plan.

    violationRecord 5022832
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $697.00 proposed penalty

  20. Belt air course ventilation.

    violationRecord 5022831
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5022830
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 5026257
    Speed Mine · 4605437

    30 CFR 75.512 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  23. Roof control plan.

    violationRecord 5026256
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F00C759
    Speed Mine · 4605437

    103(i) · 4.0 on-site hours reported

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9559779
    Sycamore Surface Mine · 4607058

    30 CFR 77.1606(c) · $177.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.