← Panther Creek Mining LLC

Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F01424B
    Coal Clean Prep Plant · 4608571

    88.0 on-site hours reported

  2. Mine ventilation plan; submission and approval.

    violationRecord 5029808
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5029807
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  4. Escapeways; bituminous and lignite mines.

    violationRecord 5022868
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(iii) · $151.00 proposed penalty

  5. Escapeways; bituminous and lignite mines.

    violationRecord 5022867
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vii)(B) · $398.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5022866
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(7)(vii) · $398.00 proposed penalty

  7. Roof bolting.

    violationRecord 5022865
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.204(c)(1) · $267.00 proposed penalty

  8. Approval of other fire suppression devices.

    violationRecord 5022864
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-13(g) · $177.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5022863
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.400 · $642.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5022862
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $165.00 proposed penalty

  11. Condition and examination of firefighting equipment.

    violationRecord 5026263
    Speed Mine · 4605437

    30 CFR 75.1100-3 · $465.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5026262
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  13. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 5023998
    Coal Clean Prep Plant · 4608571

    30 CFR 50.20(a) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord 6319297
    Speed Mine · 4605437

    103(i) · 5.5 on-site hours reported

  15. Cable fittings; suitability.

    violationRecord 5025319
    Speed Mine · 4605437

    30 CFR 75.515 · $288.00 proposed penalty

  16. Roof control plan.

    violationRecord 5025318
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5025317
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  18. Travelways at surface installations.

    violationRecord 5026261
    Speed Mine · 4605437

    30 CFR 77.205(e) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5020356
    Winchester 2 · 4609615

    30 CFR 75.400 · $165.00 proposed penalty

  20. Handling of materials

    accidentRecord 220252340033
    Samples Surface Mine · 4607178

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee stated they were installing an exhaust on a D10 dozer. Employee stated while looking up to watch what they were doing they felt some debris fall down on their sleeves, forehead and neck. Employee stated they felt discomfort in right eye when they got home to wash their face. Employee did seek medical treatment. Prescribed eye drops.

  21. Mine ventilation plan; submission and approval.

    violationRecord 5022861
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  22. Other safeguards.

    violationRecord 5022860
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  23. Other safeguards.

    violationRecord 5022859
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  24. Other safeguards.

    violationRecord 5022858
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1403 · $642.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5022856
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.380(d)(1) · $1,818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.