← Panther Creek Mining LLC

Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029064
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $267.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5029063
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029062
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1731(a) · $267.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5028251
    Winchester 2 · 4609615

    30 CFR 75.202(a) · $209.00 proposed penalty

  5. Air quality.

    violationRecord 5028250
    Winchester 2 · 4609615

    30 CFR 75.321(a)(1) · Significant and substantial (S&S) · $697.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F00C09B
    Speed Mine · 4605437

    103(i) · 5.0 on-site hours reported

  7. Mine ventilation plan; submission and approval.

    violationRecord 5029061
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5029060
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  9. Roof control plan.

    violationRecord 5029059
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5029058
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.202(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5028685
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $10,569.00 proposed penalty

  12. Permissible electric face equipment; maintenance.

    violationRecord 5025890
    Winchester 2 · 4609615

    30 CFR 75.503 · $366.00 proposed penalty

  13. Water spray devices; capacity; water supply; minimum requirements.

    violationRecord 5025889
    Winchester 2 · 4609615

    30 CFR 75.1107-7(b) · $151.00 proposed penalty

  14. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5025888
    Winchester 2 · 4609615

    30 CFR 75.1107-4(c) · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5029057
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,679.00 proposed penalty

  16. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5029931
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.1107-1(a)(1) · $366.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F00EB3B
    Speed Mine · 4605437

    103(i) · 6.0 on-site hours reported

  18. Spot Inspections

    inspectionRecord 6319299
    Speed Mine · 4605437

    103(i) · 4.5 on-site hours reported

  19. Methane monitors.

    violationRecord 5028248
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · $755.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5028246
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  21. Roof control plan.

    violationRecord 5028247
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $2,712.00 proposed penalty

  22. Explosives; magazines.

    violationRecord 5025777
    Samples Surface Mine · 4607178

    30 CFR 77.1301(a) · $209.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5025887
    Winchester 2 · 4609615

    30 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty

  24. Roof control plan.

    violationRecord 5025886
    Winchester 2 · 4609615

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  25. Ventilation controls.

    violationRecord 5029930
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.333(h) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.